QSO 489 Module 4 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This QSO 489 Module 4 Milestone Two sample analyzes current operations with a process map, flow time and work-in-progress data, capacity and bottleneck analysis, quality analysis and a look at scheduling. SNHU QSO 489 (QSO-489) assigns this analysis in Module 4 of the BS Operations Management capstone. The operation is Copperline Finishing Company, an invented Muncie, Indiana, powder coating job shop that takes 11.6 days on jobs it quotes at seven. The milestone finds where the days go, identifies the conveyor line as the constraint, shows how color changes and rework eat its capacity and traces the worst defect to its cause.

CourseQSO 489 Capstone in Operations Management
ModuleModule 4
Paper typeundergraduate capstone milestone analyzing current operations with a process map, flow time and work-in-progress data, capacity and bottleneck analysis, quality analysis and scheduling
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 489 Module 4

1

Six Point Eight Days in Line: The Current-State Analysis at Copperline Finishing

[Student Name]

Southern New Hampshire University

QSO 489: Capstone in Operations Management

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe study data, capacities and defect counts for Copperline Finishing Company in this QSO 489 milestone are invented.
2

Six Point Eight Days in Line: The Current-State Analysis at Copperline Finishing

Introduction

Milestone One defined Copperline Finishing Company's problem: an average lead time of 11.6 days against a seven-day promise, 71 percent on-time delivery, rework on 7.8 percent of racks and constant Saturday overtime. This milestone analyzes the current state using a three-week study of time-stamped travelers, color-change logs, coded rework tags, daily bath titration and morning counts of waiting racks. It maps the process, breaks down lead time, finds the constraint, analyzes quality and scheduling and summarizes the root causes.

What this page is doingSets out the purpose.
3

Where the Days Go

Average lead time by stage, three-week study

StageAverage daysOf which value-adding
Receiving to racking1.4Under 0.1
Waiting for pretreatment and coating6.80
Pretreatment, coating and curing0.3About 0.1
Waiting to be unracked and packed1.10
Packed, waiting for shipment2.00
Total11.6About 0.2

Of 11.6 days, a job is actually being washed, coated or cured for a few hours. The largest single block, 6.8 days, is spent waiting in front of the lines, almost all in front of the conveyor line. The second largest, 2.0 days, is spent packed and waiting for a customer pickup or Copperline's own truck.

What this page is doingBreaks lead time into work and waiting.
4

Work in Progress and Little's Law

Morning counts averaged about 3,100 racks of parts in the building: about 370 waiting for racking, 1,820 waiting for the lines, 290 waiting for packing, 540 packed and waiting to ship and 80 at Line 2. The shop completes about 267 racks a day. Little's law states that average work in progress equals throughput times flow time, so 3,100 racks divided by 267 a day gives about 11.6 days, matching the travelers exactly. Hopp and Spearman (2004) argue that limiting work in progress is the defining feature of pull systems, because with throughput fixed by capacity, the only way to shorten lead time is to hold less work in the system. At current throughput, a seven-day lead time requires no more than about 1,870 racks in the building.

What this page is doingConnects queues to lead time.
5

Capacity and the Constraint

Davies et al. (2005) describe the theory of constraints as a method that focuses improvement on the one resource limiting a system's output, since gains elsewhere do not raise throughput. The conveyor line, with its washer, booth and oven running at one conveyor speed, is the candidate.

Conveyor line capacity, two shifts

ItemRacks per day
Theoretical capacity at full hanger density260
Lost to 22 color changes of about 12 minutes each, 27.5%minus 72
Lost to empty hanger gaps, about 4%minus 7
Effective capacityAbout 181
Demand: 70% of new racksAbout 187
Rework passing through againAbout 15
Total demandAbout 202

The line's effective capacity of about 181 racks a day falls about 21 short of demand, which is why Saturday shifts run most weeks and why work piles up in front of it. Line 2, the batch line, has capacity of about 95 racks a day against demand of about 80 and is not the constraint. The two biggest drains on the constraint's time are color changes, which take more than a quarter of it, and rework, which consumes about 7 percent.

What this page is doingFinds what limits output.
6

Color Changes and Scheduling

Jobs are released to the conveyor line in order of due date. Because customers order hundreds of colors, consecutive jobs are rarely the same color, and each change requires stopping powder flow, cleaning the booth and recovery system and starting the new color while the conveyor runs empty. Allahverdi (2015), surveying scheduling research where setup times depend on the sequence of jobs, shows that sequencing to reduce setups can greatly increase effective capacity. A replay of the study's jobs showed that grouping same and similar colors within a one-day window, light colors before dark, would have reduced changes from 22 to about 12 a day without making any job later than its promised date.

What this page is doingExplains why changes are so frequent.
7

Quality Analysis

Rework by cause, three-week study

DefectRacksShare
Adhesion failure11938%
Contamination, dirt or fibers7524%
Film too thin or too thick5317%
Color mismatch3712%
Outgassing289%
Total312100%

Adhesion failures lead the Pareto. Daily titration during the study showed the iron phosphate stage of the washer below its specified concentration on 6 of 15 days, and 84 percent of adhesion failures came from racks washed on those days. The weekly test the shop normally runs would have caught at most two of those six days. Contamination, the second defect, clustered in the hour after color changes, when residue from cleaning settles on parts. Film thickness problems were spread across operators and colors, suggesting gun settings rather than a single cause.

What this page is doingTraces rework to causes.
8

Line 2 and Supporting Steps

Because the theory of constraints warns against assuming the busiest place is the bottleneck, the other steps were checked too. Line 2, the batch line, ran at about 84 percent of its capacity and occasionally waited for work. Racking has enough people on first shift but runs short on second shift, which explains part of the 1.4 days before racking but does not limit output. Packing keeps up except on Fridays, when the week's finished work peaks. The sandblast room, excluded from the project, is a source of delay for about one job in five but feeds both lines, not only the conveyor line, and its effect on lead time is smaller than the queue in front of the constraint.

What this page is doingChecks that nothing else limits the shop.
9

Root Causes

Four root causes explain most of the problem. First, too much work is released to the floor: 3,100 racks in the building guarantee an 11.6-day lead time whatever else happens. Second, the conveyor line, the constraint, loses more than a quarter of its time to color changes because jobs are scheduled by due date alone. Third, a pretreatment bath tested only weekly drifts out of specification, causing most adhesion failures and the rework that consumes more constraint time. Fourth, packed jobs wait two days for shipment because pickups and Copperline's truck routes are not planned against finished work.

What this page is doingSummarizes what the recommendations must address.
10

Conclusion

Copperline's long lead times are not caused by slow work but by waiting, and its waiting is caused by releasing more work than its constraint can handle. The conveyor line runs about 21 racks a day short of demand because color changes and rework eat its time. Fixing release, sequencing and pretreatment control would address the constraint directly, which Milestone Three will test.

What this page is doingSummarizes the analysis.
11

References

Allahverdi, A. (2015). The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research, 246(2), 345-378. https://doi.org/10.1016/j.ejor.2015.04.004

Davies, J., Mabin, V. J., & Balderstone, S. J. (2005). The theory of constraints: A methodology apart? A comparison with selected OR/MS methodologies. Omega, 33(6), 506-524. https://doi.org/10.1016/j.omega.2004.07.015

Hopp, W. J., & Spearman, M. L. (2004). To pull or not to pull: What is the question? Manufacturing & Service Operations Management, 6(2), 133-148. https://doi.org/10.1287/msom.1030.0028

What the QSO 489 Module 4 instructions ask for

The QSO 489 Milestone Two assignment usually asks students to analyze the current state of the operation identified in the first milestone. Expect to map the process, collect and present data on performance, analyze capacity and identify bottlenecks, examine flow time and inventory, analyze quality problems and their causes and assess planning and scheduling practices, then summarize the root causes of the problem. Strong analyses rest on collected data rather than opinion, separate value-adding time from waiting, connect work in progress, throughput and lead time, find the true constraint and show what consumes its capacity, trace defects to causes rather than labels and end with a short list of causes that the recommendations must address.

How this QSO 489 Module 4 milestone two example is built

The milestone analyzes Copperline Finishing Company, a fictional powder coating job shop in Muncie, Indiana. A three-week study shows that of an 11.6-day lead time, 6.8 days are spent waiting in front of the conveyor line, and Little's law ties 3,100 racks of work in progress to throughput of 267 racks a day. The conveyor line, with a theoretical 260 racks a day, loses 27.5 percent of its time to 22 color changes and delivers about 181 effective racks against demand of about 202 including rework, which is why Saturday overtime never ends. A Pareto of 312 rework racks puts adhesion failures first, traced to a pretreatment bath out of specification on 6 of 15 days. Davies and colleagues, Hopp and Spearman and Allahverdi inform the analysis.

Where the QSO 489 Module 4 rubric puts the points

Instructors grading QSO 489 Milestone Two look at a clear process map, performance data from the study, lead time broken into work and waiting, a correct use of the relationship between work in progress, throughput and lead time, a capacity analysis that identifies the true constraint and its losses, a quality analysis that reaches root causes, an assessment of scheduling and a short list of causes for the recommendations to address. Analyses that score highest show the numbers reconcile across methods. Credit drops when conclusions rest on opinion, every step is analyzed equally, the constraint is assumed, defects are reported by label only or causes are not summarized. Tables, clarity and APA citations count too.

QSO 489 Module 4 help: the mistakes that cost points

Start with a process map and your data. Break lead time into time spent being worked on and time spent waiting at each step; waiting usually dominates. Count work in progress at each step and check it against throughput and lead time with Little's law. Then calculate each step's capacity and the demand placed on it, including rework, to find the constraint, and list what eats the constraint's time, such as changeovers, gaps and breakdowns. Build a Pareto of defects and ask why the top one happens until you reach a cause you can act on. Look at how work is scheduled and whether the rule creates waste. End with three to five root causes. A common mistake is analyzing everything at once; another is calling the busiest machine the bottleneck without checking demand.

Get QSO 489 Module 4 written to your instructions

Share the QSO 489 Milestone Two guidelines and your organization's data. A writer maps the process, breaks lead time into work and waiting, applies Little's law to work in progress and throughput, calculates capacity and finds the constraint, builds a defect Pareto with root causes and examines scheduling rules, citing operations research. Your first QSO 489 milestone is free, finished within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 489 papers and related BS Operations Management samples

QSO 489 Module 4 questions, answered

Where can I find a free QSO 489 Module 4 Milestone Two sample?

This page holds the complete QSO 489 Milestone Two: a current-state analysis of an invented powder coating job shop.

What is Little's law?

A relationship stating that average work in progress equals average throughput times average flow time, so long lead times follow directly from large queues.

How do you identify a bottleneck?

By comparing each step's effective capacity with the demand placed on it, including rework; the step with the least spare capacity limits the whole operation.

Why does rework matter for capacity?

Because reworked parts pass through the constraint again, consuming capacity that could have produced new work.

What is a root cause?

The underlying reason a problem occurs, found by asking why repeatedly until reaching a cause that, if corrected, would prevent the problem from recurring.