QSO 570 Module 6 Trees and Ensembles Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 570 Module 6 Trees and Ensembles Assignment sample compares a decision tree, a random forest and gradient boosting with a logistic baseline on held-out data and weighs their accuracy against cost and transparency. SNHU QSO 570 (QSO-570) assigns tree-based methods in Module 6 of the predictive analytics course in its MS Operations Management. The problem is again 60-day cancellation at Quillfield Athletic Clubs, an invented fitness chain. The paper fits each method, compares them on the same later months, shows how a forest can look perfect on its own data, examines what the trees learned and decides which model should produce next month's call list.

CourseQSO 570 Predictive Business Analytics
ModuleModule 6
Paper typegraduate assignment comparing a decision tree, a random forest and gradient boosting with a logistic baseline on held-out data and weighing accuracy against cost and transparency
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 570 Module 6

1

Five Hundred Trees for Six More Points: Comparing Models at Quillfield

[Student Name]

Southern New Hampshire University

QSO 570: Predictive Business Analytics

Trees and Ensembles Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe models and results for Quillfield Athletic Clubs in this QSO 570 assignment are invented.
2

Five Hundred Trees for Six More Points: Comparing Models at Quillfield

Introduction

The logistic regression in Module 5 ranks Quillfield Athletic Clubs' members by 60-day cancellation risk and catches 31 percent of cancellations in its riskiest tenth. Tree-based methods can capture thresholds and interactions that a logistic regression handles only if the analyst specifies them. This assignment fits a single decision tree, a random forest and a gradient boosted model to the same training months, tunes them on the same validation months and compares all four models on the same test months.

What this page is doingStates the comparison.
3

A Single Tree

Quinlan (1986) described how decision trees are induced by repeatedly splitting cases on the feature that best separates the outcomes, producing rules that can be read as a series of questions. Grown without limits, a tree on 416,000 member-months reached more than 40 levels and fitted the training data almost perfectly but ranked the validation months poorly. Limiting the tree to five levels and at least 500 member-months per leaf gave the best validation results. The top splits are easy to read: first, whether days since the last visit exceed 14; then, for those members, whether a payment failed in the last 90 days; and then contract type. The riskiest leaf, members away more than 14 days with a failed payment on a month-to-month contract, has a cancellation rate of about 38 percent.

What this page is doingBuilds and limits it.
4

Random Forest

Breiman (2001) introduced random forests, which grow many deep trees, each on a bootstrap sample of the cases and considering a random subset of features at each split, and average their votes. Because each tree sees different data and features, their errors partly cancel. A forest of 500 trees, considering six features at each split, was fitted. On the training data its area under the curve was 0.99, an almost perfect fit. Its out-of-bag estimate, which scores each case using only the trees that did not see it, was 0.82, and on the test months it was also 0.82. The training figure measures memorization, not prediction.

What this page is doingAverages many trees.
5

Gradient Boosting

Friedman (2001) described gradient boosting, which fits a sequence of small trees, each to the remaining errors of the model so far, with a learning rate that shrinks each tree's contribution. A model of 800 trees, each with four levels and a learning rate of 0.05, gave the best validation results. Its training area under the curve was 0.88, a smaller gap from its test result than the forest's, because each small tree adds little.

What this page is doingBuilds trees in sequence.
6

Results

Performance on the test months, about 104,000 member-months

ModelArea under ROC curveArea under precision-recall curveCancellations caught in the riskiest tenthLift in the riskiest tenth
Decision tree, five levels0.740.1727%2.7
Logistic regression0.780.2131%3.1
Random forest0.820.2636%3.6
Gradient boosting0.830.2737%3.7

Lemmens and Croux (2006) found that bagging and boosting trees substantially improved churn prediction over a single tree and over logistic regression, and the same pattern appears here. In business terms, a call list from the boosted model reaches about 2,460 of the 6,660 test-month cancellations in its top tenth, against about 2,060 for the logistic regression, roughly 400 more members at risk reached with the same number of calls.

What this page is doingCompares all four on the test months.
7

What the Models Learned

All four models rely on the same few features. In the boosted model, the five most important are the ratio of recent to earlier visits, days since the last visit, a failed payment in the last 90 days, tenure and contract type. Partial dependence plots, which show how predicted risk changes with one feature while averaging over the others, reveal patterns the logistic regression missed. Risk is flat for members who visited within the last ten days and rises steeply between 14 and 30 days away. And a failed payment raises risk far more for month-to-month members than for those on annual contracts, who must pay a fee to leave. These are associations: they say which members are at risk, not why or what would keep them.

What this page is doingInterprets importance and interactions.
8

Stability Across Clubs

An ensemble that wins overall could still do worse at some clubs. The four models were therefore compared club by club on the test months. Gradient boosting had the highest area under the curve at 12 of the 14 clubs and was within 0.01 of the best at the other two, both small clubs with fewer than 200 cancellations in the test months, where differences of that size are within chance. Its advantage was largest at the three clubs with the most month-to-month members, where the interaction between contract type and failed payments matters most. The ranking was also stable when the test was repeated on September and October instead of November and December, so the gain is not an artifact of one pair of months.

What this page is doingChecks that the gain holds everywhere.
9

Cost and Transparency

The boosted model needs a few minutes of computing each month, at a cost of a few dollars, and the scoring script is no harder to maintain than the logistic regression's. Its weakness is explanation: a manager can see why the logistic regression flagged a member, from the odds ratios, but the boosted model's score comes from 800 trees. To keep scores explainable, each flagged member's list entry will show the three features that raised their score most, and the logistic regression will be run alongside as a check. If the two models disagree sharply about a member, the analyst will look at the record.

What this page is doingWeighs the gain.
10

Recommendation

Gradient boosting should produce the monthly call list, because it reaches about 400 more at-risk members per two months for the same number of calls at little extra cost. The random forest is nearly as good and will be kept as a backup. The logistic regression remains in use to explain scores and as a benchmark, and all models will be rescored on each new month to watch for drift.

What this page is doingChooses the model.
11

Conclusion

On the same later months, gradient boosting and a random forest rank Quillfield's members by cancellation risk better than a logistic regression or a single tree, catching 36 to 37 percent of cancellations in the riskiest tenth against 31 and 27 percent. The forest's near-perfect training score shows why ensembles must be judged on held-out data. The boosted model will produce the call list, explained by its top features and checked against the logistic regression.

What this page is doingSummarizes the comparison.
12

References

Breiman, L. (2001). Random forests. Machine Learning, 45(1), 5-32. https://doi.org/10.1023/A:1010933404324

Friedman, J. H. (2001). Greedy function approximation: A gradient boosting machine. The Annals of Statistics, 29(5), 1189-1232. https://doi.org/10.1214/aos/1013203451

Lemmens, A., & Croux, C. (2006). Bagging and boosting classification trees to predict churn. Journal of Marketing Research, 43(2), 276-286. https://doi.org/10.1509/jmkr.43.2.276

Quinlan, J. R. (1986). Induction of decision trees. Machine Learning, 1(1), 81-106. https://doi.org/10.1007/BF00116251

What the QSO 570 Module 6 instructions ask for

The QSO 570 Module 6 assignment usually asks students to apply decision trees and ensemble methods to a prediction problem. Expect to build a classification or regression tree, control its size, fit ensemble models such as random forests or gradient boosting, tune their settings, compare performance with simpler models on held-out data and interpret the results using variable importance and similar tools. Strong assignments compare every method on the same test data with the same measures, report both training and held-out performance to show overfitting, tune settings on validation data only, explain what the ensemble learned in terms managers understand and weigh any gain in accuracy against the cost of running and explaining a more complex model.

How this QSO 570 Module 6 trees and ensembles assignment example is built

The assignment compares four models of 60-day cancellation at Quillfield Athletic Clubs, a fictional chain of 14 fitness clubs, on the same later test months. A single tree limited to five levels scores 0.74 on area under the curve and catches 27 percent of cancellations in its riskiest tenth; the Module 5 logistic regression reaches 0.78 and 31 percent; a random forest of 500 trees 0.82 and 36 percent; and gradient boosting 0.83 and 37 percent. The forest's training area of 0.99 against an out-of-bag area of 0.82 shows why ensembles must be judged on held-out data. Boosting finds that a failed payment matters most for month-to-month members. Quinlan, Breiman, Friedman and Lemmens and Croux inform the work.

Where the QSO 570 Module 6 rubric puts the points

The QSO 570 trees and ensembles assignment is commonly graded on correctly built and size-controlled trees, properly fitted ensembles, tuning on validation data, comparison of all models on the same held-out data with suitable measures, attention to the gap between training and held-out performance, interpretation through importance and interactions, a recommendation that weighs accuracy against cost and transparency and clear explanation for managers. The strongest papers show what the ensemble gains in business terms, such as cancellations caught. Credit drops when models are compared on different data, training scores are reported as performance, settings are tuned on the test set, importance is read as cause or the most complex model is chosen without considering its cost. Tables, clear writing and APA citations complete the grade.

QSO 570 Module 6 help: the mistakes that cost points

Start with a single tree and limit its depth or require a minimum number of cases per leaf, since an unlimited tree will memorize the training data. Then fit a random forest, which averages many trees grown on random samples, and a boosted model, which builds trees one after another to correct earlier errors. Tune each method's main settings on the validation data, and score every model on the same test data with the same measures, including the share of positives caught among the highest-ranked cases. Report training and test results side by side to show overfitting. Use variable importance and partial dependence to explain what each model learned, and translate the gain over the simplest model into cases caught. Papers often stop at the highest score without asking whether it justifies a model no one can explain.

Get QSO 570 Module 6 written to your instructions

Share the QSO 570 Module 6 instructions and your data. A writer fits a decision tree, a random forest and a boosted model alongside a baseline, tunes each on validation data, compares them on the same test set with ranking and lift measures, explains overfitting in ensembles, interprets importance and interactions and recommends a model by weighing accuracy against cost and transparency, citing machine learning research. Your first QSO 570 paper is free, prepared within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 570 papers and related MS Operations Management samples

QSO 570 Module 6 questions, answered

Where can I find a free QSO 570 Module 6 Trees and Ensembles Assignment sample?

The complete QSO 570 Module 6 assignment is on this page: comparing a tree, a random forest and boosting for churn at an invented fitness chain.

What is a decision tree?

A model that splits cases into groups by asking a sequence of questions about their features, ending in leaves that give a prediction for each group.

How does a random forest work?

It grows many trees on random samples of cases and features and averages their predictions, which reduces the variance of a single tree.

What is gradient boosting?

A method that builds trees in sequence, each one fitted to the errors of the trees before it, gradually improving the combined prediction.

What is variable importance?

A summary of how much each feature contributes to a model's predictions, useful for interpretation but not evidence that the feature causes the outcome.