QSO 570 Module 3 Regression Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 570 Module 3 Regression Assignment sample builds a regression to predict a numeric business outcome, compares it with a naive baseline and uses regularization to control overfitting. SNHU QSO 570 (QSO-570) covers regression for prediction in Module 3 of its MS Operations Management predictive analytics course. The outcome is next month's visits by each member of Quillfield Athletic Clubs, an invented fitness chain that wants early warning when members start drifting away. The paper sets a baseline that any model must beat, fits an ordinary regression and a lasso, compares them on later months and shows which features the lasso keeps and why fewer can predict better.

CourseQSO 570 Predictive Business Analytics
ModuleModule 3
Paper typegraduate assignment building a regression to predict a numeric business outcome, comparing it with a naive baseline and using regularization to control overfitting
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 570 Module 3

1

Fourteen Features Beat Forty-One: Predicting Visits at Quillfield

[Student Name]

Southern New Hampshire University

QSO 570: Predictive Business Analytics

Regression Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe visit data, models and errors for Quillfield Athletic Clubs in this QSO 570 assignment are invented.
2

Fourteen Features Beat Forty-One: Predicting Visits at Quillfield

Introduction

Visits are the clearest sign of whether a member is getting value from a membership, and a fall in visits usually comes before a cancellation. Quillfield Athletic Clubs wants to predict each member's visits in the next 30 days, both as an early warning for club managers and as an input to the cancellation model. This assignment uses the modeling table from Module 2, compares a naive baseline with two regressions on later months and examines where predictions go wrong.

What this page is doingStates the purpose.
3

The Target

The target is the number of check-ins in the 30 days after each snapshot date. Across the training months, members averaged 7.4 visits, with a median of 6, a standard deviation of 6.1 and a long right tail up to about 40 visits for members who come daily, sometimes twice. About 22 percent of member-months had no visits at all. Because the distribution is skewed and includes many zeros, errors are reported both as averages and for members whose visits changed sharply.

What this page is doingDescribes next month's visits.
4

Baseline

The simplest prediction is that a member will visit as often next month as in the last 30 days. On the test months, this baseline has a mean absolute error of 3.1 visits and a root mean squared error of 4.4. It is hard to beat for steady members, who make up most of the club, and poor for members whose habits are changing, the ones that matter most for retention.

What this page is doingSets the bar to beat.
5

Ordinary Regression

An ordinary least squares regression was fitted on the training months using all 41 features. On the training data it had a mean absolute error of 2.5 visits, but on the test months its error rose to 2.7 and its root mean squared error to 3.8. Several coefficients had signs that made little sense, such as a positive effect of prior cancellations, and some changed sign when the regression was refitted on different training months, a sign that the model was fitting noise among correlated predictors.

What this page is doingFits all features.
6

The Lasso

Tibshirani (1996) introduced the lasso, which adds to the regression's objective a penalty proportional to the sum of the absolute values of the coefficients. As the penalty grows, coefficients shrink and many become exactly zero, so the method both selects features and stabilizes the ones it keeps. Penalties across a range of values were tried on the training months, and the one with the lowest error on the validation months was chosen. At that penalty, the lasso kept 14 of the 41 features.

Features kept by the lasso, in order of standardized coefficient size

FeatureDirection
Visits in the last 30 daysHigher visits predict more next month
Ratio of last 30 days' visits to the prior 60 daysRising trend predicts more
Class bookings in the next 14 days, already madeMore bookings predict more visits
Days since last visitLonger gap predicts fewer
Visits in the last 90 daysHigher predicts more
Tenure under six monthsNew members visit more, then fade
Personal training sessions scheduledMore predict more visits
Family planSlightly more visits

The remaining six kept features, including a January indicator and contract type, had small coefficients. Most location and history features were dropped.

What this page is doingAdds a penalty.
7

Test Results

Errors on the test months, about 104,000 member-months

MethodMean absolute error, visitsRoot mean squared error, visits
Last 30 days repeated3.14.4
Ordinary regression, 41 features2.73.8
Lasso, 14 features2.53.6

Hyndman and Koehler (2006) recommend reporting errors in the units of the data and comparing them with a naive method; in those terms, the lasso misses by about two and a half visits on average, about 20 percent less than the baseline.

What this page is doingCompares the three approaches.
8

Why Fewer Features Predict Better

Geman et al. (1992) described the bias-variance dilemma: a model that is too rigid misses real patterns, while one that is too flexible fits the noise in its training data and predicts new cases poorly. With 41 correlated features, the ordinary regression had more freedom than the data could support, and its coefficients moved with chance features of the training months. The lasso accepted a little bias, shrinking real effects toward zero, in exchange for much lower variance, and the trade paid off on months it had never seen.

What this page is doingExplains the trade-off.
9

Where the Model Fails

For members whose visits fell by more than half from one month to the next, the lasso's mean absolute error was 4.8 visits, against 6.9 for the baseline. It predicted declines that the baseline could not, but it still underestimated how sharply some members stopped coming, often after an injury, a move or a schedule change the data do not record. For new members in their first two months, errors were also larger, since they have little history. These are exactly the members the club most wants to reach, which is why the visit prediction is used as one input to the cancellation model rather than as a warning on its own.

What this page is doingExamines the cases that matter.
10

January and Summer

Visits follow the calendar. January brings a surge of renewed effort, with average visits about 18 percent above the yearly mean, followed by a steady fade through February and March, and visits dip again in July and August, when members travel. The test months, November and December, sit before the January surge, so the errors above do not show how the model handles it. When the same lasso was fitted on January to June and tested on July and August, its mean absolute error was 2.6 visits, close to the result above, but it overpredicted summer visits for families by about one visit a month. A month-of-year indicator, kept by the lasso at a small value, captures part of the pattern; next year's model will be checked on January before it is trusted for retention lists in the new year.

What this page is doingChecks the seasons.
11

What the Coefficients Mean

The lasso's coefficients describe which features help predict visits, not what would happen if the club changed them. Class bookings predict visits because members who plan to come book classes, not necessarily because booking a class causes a visit. A campaign to push bookings might raise visits, or might produce empty no-shows; only a test could tell.

What this page is doingLimits the interpretation.
12

Conclusion

A lasso regression keeping 14 of 41 features predicts members' next-month visits with a mean absolute error of about 2.5 visits on later months, better than both repeating last month and an ordinary regression on every feature. It does best for steady members and still underestimates sudden drop-offs, so its predictions will feed the cancellation model rather than serve as the only warning.

What this page is doingSummarizes the model.
13

References

Geman, S., Bienenstock, E., & Doursat, R. (1992). Neural networks and the bias/variance dilemma. Neural Computation, 4(1), 1-58. https://doi.org/10.1162/neco.1992.4.1.1

Hyndman, R. J., & Koehler, A. B. (2006). Another look at measures of forecast accuracy. International Journal of Forecasting, 22(4), 679-688. https://doi.org/10.1016/j.ijforecast.2006.03.001

Tibshirani, R. (1996). Regression shrinkage and selection via the lasso. Journal of the Royal Statistical Society: Series B (Methodological), 58(1), 267-288. https://doi.org/10.1111/j.2517-6161.1996.tb02080.x

What the QSO 570 Module 3 instructions ask for

The QSO 570 Module 3 assignment typically asks students to build a regression model to predict a quantitative business outcome. Expect to select predictors, fit a multiple regression on training data, evaluate predictions on held-out data with measures such as mean absolute error or root mean squared error, compare models and interpret the results. Strong assignments begin with a naive baseline, use validation data to tune choices such as a regularization penalty, judge models only on data not used for fitting, report errors for the cases that matter most to the business, explain the bias-variance trade-off when a simpler model wins and avoid reading predictive coefficients as causal effects.

How this QSO 570 Module 3 regression assignment example is built

The assignment predicts how many times each member of Quillfield Athletic Clubs, a fictional chain of 14 fitness clubs, will visit in the next 30 days. Members average 7.4 visits, with a median of 6, and 22 percent make none. On the test months, repeating last month's visits misses by 3.1 visits on average, an ordinary least squares regression on all 41 features by 2.7 and a lasso that keeps 14 features by 2.5, with root mean squared error falling from 4.4 to 3.6. The lasso keeps recent visits, the trend in visits, class bookings and tenure. The paper explains the bias-variance trade-off, reports errors for members who stopped coming and warns against causal readings. Tibshirani, Geman and colleagues and Hyndman and Koehler inform it.

Where the QSO 570 Module 3 rubric puts the points

The QSO 570 regression assignment earns credit for a well-defined numeric target, a naive baseline, correct fitting on training data, tuning on validation data, comparisons on held-out test data with appropriate error measures, analysis of errors for important groups, a clear account of why regularization helps and interpretation that keeps prediction separate from cause. The strongest papers show that the more complex model is not always the better predictor. Credit drops when models are judged on training data, no baseline is given, penalties are tuned on the test set, only R-squared is reported or coefficients are presented as effects of changing the predictors. Tables, clear writing and APA citations complete the grade.

QSO 570 Module 3 help: the mistakes that cost points

Start with the simplest prediction anyone could make, such as last period's value, and measure its error; every model must beat it. Fit an ordinary regression on the training data, then a regularized one, such as the lasso, trying a range of penalties and choosing the one with the lowest error on the validation data. Only then score each model once on the test data. Report mean absolute error, which is easy to explain, and root mean squared error, which punishes large misses. Break the errors down for the cases that matter most, such as customers whose behavior changed. Explain which predictors the regularized model kept and why dropping some can improve accuracy. Papers often tune and test on the same data, which makes every model look better than it will be.

Get QSO 570 Module 3 written to your instructions

Share the QSO 570 Module 3 instructions and your data. A writer defines the numeric target, sets a naive baseline, fits ordinary and regularized regressions on the training data, tunes the penalty on validation data, compares errors on the test set with suitable measures, examines where the model fails and explains what the coefficients can and cannot be used for, citing research on regression and prediction. Your first QSO 570 paper is free, typically delivered in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 570 papers and related MS Operations Management samples

QSO 570 Module 3 questions, answered

Where can I find a free QSO 570 Module 3 Regression Assignment sample?

The complete QSO 570 Module 3 assignment is on this page: predicting next-month visits at an invented fitness club chain.

What is the lasso?

A regression method that adds a penalty on the size of coefficients, shrinking some to exactly zero, which selects predictors and reduces overfitting.

What is the bias-variance trade-off?

The balance between a model too simple to capture real patterns, which has high bias, and one so flexible it fits noise, which has high variance.

Why compare a model with a naive baseline?

Because a model is only useful if it predicts better than the simplest available rule, such as assuming next month will equal last month.

How do mean absolute error and root mean squared error differ?

Mean absolute error averages the size of misses; root mean squared error squares them first, so it weighs large misses more heavily.