QSO 570 Module 8 Retention Test Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 570 Module 8 Retention Test Assignment sample runs a randomized test of an intervention across predicted risk levels and models uplift to target the cases an action actually changes. SNHU QSO 570 (QSO-570) moves from predicting outcomes to acting on them in Module 8 of its MS Operations Management predictive analytics course. The action is a retention call at Quillfield Athletic Clubs, an invented fitness chain that planned to call its riskiest members first. The paper explains the test design, reports the effect in each risk tier, shows that the members most likely to leave were the least persuadable and rebuilds the call list around predicted response.

CourseQSO 570 Predictive Business Analytics
ModuleModule 8
Paper typegraduate assignment running a randomized test of an intervention across predicted risk levels and modeling uplift to target the cases an action changes
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 570 Module 8

1

The Riskiest Members Were the Wrong Ones to Call: A Retention Test at Quillfield

[Student Name]

Southern New Hampshire University

QSO 570: Predictive Business Analytics

Retention Test Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe test, results and uplift model for Quillfield Athletic Clubs in this QSO 570 assignment are invented.
2

The Riskiest Members Were the Wrong Ones to Call: A Retention Test at Quillfield

Introduction

Module 7 found that calling the riskiest tenth of Quillfield Athletic Clubs' members would earn about $35,000 a month, if staff were right that 18 percent of members about to cancel could be persuaded to stay. That figure was a guess, and it assumed the same save rate at every level of risk. Ascarza (2018) found, in field experiments at several companies, that customers at the highest risk of leaving were often not the ones most responsive to retention efforts, so that targeting by risk wasted much of the budget. This assignment tests the calls directly.

What this page is doingSets up why a test was needed.
3

Design

On the January snapshot, the boosted model ranked all active members. Within each of the three riskiest tenths, 5,200 members each, members were randomly assigned in equal numbers either to get a phone call with a complimentary session with a trainer or to hear nothing from the club. Randomizing within each tenth means the effect can be estimated separately for each level of risk. Kohavi et al. (2009) describe randomized controlled experiments as the most reliable way to measure the effect of a change, because random assignment balances all other differences between the groups. The outcome is whether the member handed in a cancellation during the following 60 days.

Cohen (1992) set out how large a sample must be for a test to have a fair chance of spotting an effect of the size one cares about. With 2,600 members per group in each tenth, the test had about an 80 percent chance of detecting a drop of about three and a half percentage points in the riskiest tenth and a little over two points in the third tenth.

What this page is doingDescribes the randomized test.
4

Results

Cancellation within 60 days by risk tenth and group

Risk tenthNot calledCalledDifference95% interval
1, highest risk23.5%22.6%0.9 pointsminus 1.4 to 3.2 points
212.4%8.3%4.1 points2.4 to 5.8 points
38.6%6.0%2.6 points1.2 to 4.0 points

In the riskiest tenth, calls made no reliable difference: the interval includes zero. In the second and third tenths, calls cut cancellations by about a third. Put another way, calls kept about 4 percent of the members in the riskiest tenth who would otherwise have left, about 33 percent in the second and about 30 percent in the third. The staff's guess of 18 percent was too high for the riskiest members and too low for the next two tiers.

What this page is doingReports the effect in each tier.
5

Why the Riskiest Did Not Respond

The riskiest tenth is dominated by members whose card had been declined in the past three months and those who have not visited in more than a month. Notes from the calls suggest why a call did little for them: many had already decided, had moved, or could not afford the dues, and a free training session does not change any of those. Members in the second and third tenths more often had a falling but not vanished visit pattern, such as a schedule change or a lost workout partner, and a call and a session gave them a reason to come back.

What this page is doingExamines the pattern.
6

Profit by Tier

Using the costs from Module 7, about $12 per member called including the offer, and $441 for each member kept, the results for calling one tenth of 5,200 members are:

Monthly profit from calling each tenth

Risk tenthMembers keptValue keptCost of calls and offersNet
1About 47About $20,600About $62,400About minus $41,800
2About 213About $94,000About $62,400About $31,600
3About 135About $59,600About $62,400About minus $2,800

The plan from Module 7, calling the riskiest tenth, would have lost money. Calling the second tenth earns about as much as Module 7 had expected from the first.

What this page is doingConverts effects into money.
7

An Uplift Model

Rather than choose a tier, the test data were used to model each member's response. Two boosted models were trained on the test members, one predicting cancellation for those called and one for those not called; the difference between their predictions for a member is the estimated uplift, the reduction in cancellation probability a call would produce. To avoid judging the uplift model on the data it learned from, it was trained on a random two-thirds of the test members and evaluated on the other third.

On the held-out third, members ranked in the top tenth by predicted uplift showed a reduction of about 5.2 points when called, compared with about 2.5 points across all three tiers. The most responsive members had visits that had fallen by a third or more, tenure over a year and no payment problems. Members with failed payments showed almost no uplift at any level of risk. Applied to a full monthly list, calling the 5,200 members with the highest predicted uplift is projected to keep about 270 members, worth about $119,000, for about $62,400, a net of about $57,000 a month.

What this page is doingTargets response, not risk.
8

Limits

The test lasted 60 days, so it cannot show whether kept members stayed long-term or only postponed canceling; the cohort will be followed for a year. Effects were measured in January, a month when many members recommit to exercise, and may be smaller in summer. The uplift model rests on one test and should be checked with a fresh randomized hold-out group each quarter. Members also talk to one another, and a member who hears that a friend got a free session may ask for one, which would blur the line between called and uncalled groups if the program grows. Finally, the costs used here leave out the time managers spend preparing for calls, which would raise the cost per call slightly and narrow the margins in the third tenth.

What this page is doingStates what the test cannot show.
9

Conclusion

A randomized test showed that retention calls do little for Quillfield's riskiest members but cut cancellations by about a third among the next two tiers of risk. Targeting by predicted risk would lose money, while targeting by predicted response is projected to earn about $57,000 a month. The club should call the members its uplift model ranks highest and keep a random control group in every list to keep measuring whether the calls work.

What this page is doingSummarizes the findings.
10

References

Ascarza, E. (2018). Retention futility: Targeting high-risk customers might be ineffective. Journal of Marketing Research, 55(1), 80-98. https://doi.org/10.1509/jmr.16.0163

Cohen, J. (1992). A power primer. Psychological Bulletin, 112(1), 155-159. https://doi.org/10.1037/0033-2909.112.1.155

Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1

What the QSO 570 Module 8 instructions ask for

The QSO 570 Module 8 assignment usually asks students to evaluate how predictions should be used to guide action. Expect to design a test of an intervention, such as a retention offer, assign cases randomly to treatment and control groups, measure the effect on outcomes, compare effects across segments defined by the model and consider how targeting should change. Strong assignments justify the sample size, randomize within risk levels so that effects can be compared, report each effect with its uncertainty, translate effects into profit, distinguish the probability of an outcome from the effect of an action on that probability and propose a targeting rule based on predicted response rather than predicted risk.

How this QSO 570 Module 8 retention test assignment example is built

The assignment tests retention calls at Quillfield Athletic Clubs, a fictional chain of 14 fitness clubs, by randomly assigning half of the members in each of the three riskiest tenths of the model's list to a call and an offer and holding back the other half, 2,600 per group per tenth. Over 60 days, calls cut cancellation in the riskiest tenth only from 23.5 to 22.6 percent, within chance, but in the second tenth from 12.4 to 8.3 percent and in the third from 8.6 to 6.0 percent. Calling the riskiest tenth loses about $42,000 a month while calling the second earns about $32,000. An uplift model finds members with falling visits but no payment trouble most responsive. Ascarza, Kohavi and colleagues and Cohen inform the design.

Where the QSO 570 Module 8 rubric puts the points

Graders of the QSO 570 retention test assignment look for a clearly defined intervention and outcome, randomization within risk levels, a sample size justified by power, correct estimates of each effect with confidence intervals, conversion of effects into profit, a sound uplift approach, a targeting rule that follows from the evidence and attention to limits such as duration and spillover. The strongest papers show that the cases most likely to have an outcome are not always those an action can change. Credit drops when the test lacks a control group, effects are compared without uncertainty, risk is assumed to equal responsiveness, profit is ignored or the uplift model is evaluated on its own training data. Tables, clear writing and APA citations complete the grade.

QSO 570 Module 8 help: the mistakes that cost points

Pin down the action being tested and the outcome that will show whether it worked, over what period. Randomly assign cases within each risk level to receive the action or not, so that you can compare the effect across levels. Work out how many cases each group needs to detect an effect worth acting on. When results arrive, estimate the effect in each level as the difference between treatment and control, with a confidence interval, and convert it into profit using the costs of the action. If effects differ, build a model of response, often by modeling outcomes separately for treated and control cases, and check it on cases it was not built from. Then propose whom to target. The usual mistake is assuming that the customers most likely to leave are the ones an offer will keep.

Get QSO 570 Module 8 written to your instructions

Share the QSO 570 Module 8 instructions and describe the action you want to test. A writer designs a randomized test across risk levels with a power-based sample size, estimates each tier's effect with intervals, turns effects into profit, builds an uplift model and recommends a targeting rule, citing research on experiments and retention. Your first QSO 570 paper is free, with a retention test write-up back in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 570 papers and related MS Operations Management samples

QSO 570 Module 8 questions, answered

Where can I find a free QSO 570 Module 8 Retention Test Assignment sample?

The complete QSO 570 Module 8 assignment is on this page: a randomized test of retention calls across risk levels at an invented fitness chain.

What is uplift modeling?

Estimating how much an action changes each case's chance of an outcome, so that effort goes to the cases where acting makes the biggest difference.

Why randomize within risk levels?

So that the effect of the action can be measured separately for each level, showing whether high-risk and lower-risk cases respond differently.

Is the customer most likely to leave the best one to target?

Not necessarily; customers who have already decided to leave may not respond, while somewhat less risky customers may be easier to keep.

How is the profit of a retention campaign calculated?

By multiplying the extra customers kept by their value and subtracting the cost of contacting everyone targeted, including incentives.