| Course | QSO 570 Predictive Business Analytics |
|---|---|
| Module | Module 9 |
| Paper type | graduate final project report presenting a complete predictive study, from framing and data preparation to model comparison, cost-based targeting and a tested recommendation |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 570 Module 9
Call the Persuadable, Not the Lost: A Predictive Analytics Report for Quillfield
[Student Name]
Southern New Hampshire University
QSO 570: Predictive Business Analytics
Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Call the Persuadable, Not the Lost: A Predictive Analytics Report for Quillfield
Summary
Quillfield Athletic Clubs should call, each month, the 5,200 members whom an uplift model ranks most likely to stay because of a call, rather than the members most likely to cancel. This program is projected to keep about 270 members a month who would otherwise have left and to earn about $57,000 a month after the cost of calls and offers, roughly $680,000 a year, while lowering monthly cancellations from about 3.1 to about 2.6 percent. The plan that seemed obvious, calling the riskiest tenth of members, was tested and would have lost about $42,000 a month. A small random control group should be kept in every month's list to keep measuring the effect.
The Problem
About 3.1 percent of Quillfield's 52,000 members cancel each month, and the dues lost with each month's leavers top $300,000 over a year. The owner asked for a churn model. Shmueli (2010) distinguishes models built to predict from those built to explain; this one was built to predict, and framed around an action: score every active member on the first of the month for the likelihood of a cancellation in the next two months, so that club managers can call members while there is still time.
Data and Leakage
The modeling table holds about 624,000 rows, one per member per month of 2025, each with 41 inputs drawn from records that existed on its date; about 6.1 percent of rows end in a cancellation within two months. A quick model that scored an implausible 0.97 area under the curve exposed four leaking fields, including a last-visit date overwritten daily and an exit survey flag, which were removed. The data were split by month: training on January to August, validation on September and October and testing on November and December.
Models
Model comparison on the test months
| Model | Area under ROC curve | Share of cancellations in the riskiest tenth |
|---|---|---|
| Single tree, depth five | 0.74 | 27% |
| Logistic model | 0.78 | 31% |
| Forest of 500 trees | 0.82 | 36% |
| Boosted trees | 0.83 | 37% |
A lasso forecast of each member's visits over the coming month, accurate to within roughly 2.5 check-ins on average, served as one input. Breiman (2001) showed that averaging many trees can reduce prediction error, and both ensembles beat the logistic regression and the single tree; gradient boosting was chosen to rank members, with the logistic regression kept to explain scores. The strongest signals in every model were a fall in visits, days since the last visit, payment failures, tenure and month-to-month contracts.
From Prediction to Profit
A call costs about $6 of staff time and the offer of a free personal training session about $6 more on average, since 40 percent accept it, so each member called costs about $12. A member kept is worth about $441 in remaining dues. Club staff believed that nearly one in five departing members could be talked out of it; on that estimate, calling the riskiest tenth would earn about $35,000 a month and calling further down the list would lose money.
The Test
Ascarza (2018) found that customers at highest risk are often not the most responsive to retention efforts. To test the staff's estimate, members in each of the three riskiest tenths of January's list were randomly assigned to a call or no call, 2,600 in each group in each tenth. Kohavi et al. (2009) make the case that only random assignment cleanly separates an action's effect from everything else going on.
Effect of calls on 60-day cancellation
| Risk tenth | Cancellations, uncalled versus called | Monthly net from calling the whole tenth |
|---|---|---|
| Highest | About 24 versus 23 in every hundred, no reliable change | Loses about $41,800 |
| Second | About 12 versus 8 in every hundred | Earns about $31,600 |
| Third | About 9 versus 6 in every hundred | Roughly breaks even, minus $2,800 |
The riskiest members, many with failed payments or long absences, had largely decided; a call did little. Members in the next tier, whose visits had slipped but not stopped, responded strongly.
The Recommended Program
The test data also allowed a model of response. Separate boosted models for the called and uncalled groups give, for any member, two predicted chances of canceling, and the gap between them estimates what a call is worth for that person. On test members held back from building it, those it rated most responsive canceled roughly 5 points less often when called. The people it favors have been members for over a year, have started coming less often and have had no trouble paying. A month's list of the 5,200 highest-rated members should keep about 270 people and roughly $119,000 in dues, against about $62,400 spent on calls and sessions.
Monitoring
Each month, 5 percent of the members selected for calls will be randomly left uncalled, so the program's effect can be measured continuously. The boosted model's ranking will be scored on each new month, and both models will be retrained each quarter or sooner if its ranking accuracy on new months drops below the logistic model's 0.78. Feature averages will be compared with the training data monthly to catch changes in how records are kept, and managers' call notes will be reviewed quarterly for reasons the data do not capture.
Limits
The test ran in January, when members are unusually open to recommitting, so summer effects may be smaller. Sixty days is too short to know whether kept members stay for a year or only postpone canceling; the January cohort will be followed. The uplift model rests on one test of about 15,600 members, and its projected $57,000 a month is less certain than the test results for whole tenths.
Conclusion
Quillfield can predict who is likely to cancel well enough to be useful, but the test showed that predicting risk is not the same as knowing whom a call will keep. The owner is asked to approve a monthly program that calls the members an uplift model ranks most responsive, keeps a random control group in every list and follows the January cohort for a year before the program is extended to new offers. A review at six months will report saves, costs and the control group's results to the owner.
References
Ascarza, E. (2018). Retention futility: Targeting high-risk customers might be ineffective. Journal of Marketing Research, 55(1), 80-98. https://doi.org/10.1509/jmr.16.0163
Breiman, L. (2001). Random forests. Machine Learning, 45(1), 5-32. https://doi.org/10.1023/A:1010933404324
Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1
Shmueli, G. (2010). To explain or to predict? Statistical Science, 25(3), 289-310. https://doi.org/10.1214/10-STS330
What the QSO 570 Module 9 instructions ask for
In the QSO 570 final project, students typically deliver a full predictive study written for a business owner. Expect to set out the problem and the decision, describe and prepare the data, build and compare several predictive models, evaluate them on held-out data, interpret the results and recommend how the organization should use the predictions. Strong reports lead with the recommendation and its expected value, explain how leakage was prevented, judge models on later data with measures suited to the problem, connect predictions to the economics of acting, present evidence that acting on predictions changes outcomes, describe how the model will be monitored and retrained and are frank about what remains uncertain.
How this QSO 570 Module 9 final project example is built
The project reports to the owner of Quillfield Athletic Clubs, a fictional chain of 14 fitness clubs losing about 3.1 percent of its 52,000 members a month. A leak-free table of 624,000 member-months feeds a visit forecast and four cancellation models; gradient boosting ranks best on later months, with an area under the curve of 0.83 and 37 percent of cancellations in its riskiest tenth. A profit calculation pointed at the riskiest members, but a randomized test showed that calls barely helped them and cut cancellations by about a third in the next two tiers. The recommended program calls the 5,200 members an uplift model ranks most responsive each month, netting about $57,000 a month. Shmueli, Breiman, Ascarza and Kohavi and colleagues inform it.
Where the QSO 570 Module 9 rubric puts the points
Instructors assessing the QSO 570 final project look for a framed prediction tied to a decision, documented preparation with leakage controls, several models compared on held-out data with suitable measures, interpretation that stays within what predictions show, a link from predictions to costs and benefits, evidence from a test of the intervention, a recommendation with expected value and uncertainty, a monitoring and retraining plan and writing suited to a business owner. The strongest reports show how evidence changed the plan. Credit drops when models are judged on training data, the highest-scoring model is recommended without regard to use, profit is never estimated, risk is assumed to equal responsiveness or monitoring is missing. Tables, clear writing and APA citations complete the grade.
QSO 570 Module 9 help: the mistakes that cost points
Open with what you recommend, what it is expected to earn and how sure you are. Then take the reader through the study in order: the prediction and why it was framed that way, the data and how leakage was prevented, the models and how they compared on later data, and how predictions were turned into a plan. If you tested the plan, give the results with their uncertainty and say how they changed your recommendation. Present the final targeting rule with its expected value and the assumptions behind it. End with how the model will be watched, retrained and kept honest, for example with a random control group. Reports often spend most of their pages on model tuning and very few on whether acting on the model pays, which is the question the owner is asking.
Get QSO 570 Module 9 written to your instructions
Send the QSO 570 final project guidelines with the modeling work from your earlier modules. A writer frames the prediction and its decision, documents data preparation and leakage checks, compares models on held-out data, links predictions to costs, reports any test of the intervention with uncertainty, recommends a targeting rule with its expected value and sets out monitoring, citing predictive analytics research. Your first QSO 570 paper is free, completed in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 570 papers and related MS Operations Management samples
- QSO 570 Module 1 Discussion: What to Predict, and When
- QSO 570 Module 2 Data Preparation Assignment: A Training Table That Does Not Leak the Future
- QSO 570 Module 3 Regression Assignment: Predicting Next Month's Visits
- QSO 570 Module 4 Discussion: Why a Perfect Training Score Is a Warning
- QSO 570 Module 5 Classification Assignment: Who Will Cancel in the Next 60 Days
- QSO 570 Module 6 Trees and Ensembles Assignment: One Tree, a Forest and Boosting
- QSO 570 Module 7 Discussion: Choosing a Threshold by Profit
- QSO 570 Module 8 Retention Test Assignment: The Members a Call Can Actually Keep
- QSO 570 Module 10 Discussion: Fairness When Offers Follow Scores
- OL 610 Module 5 Milestone Two: Collective Bargaining Plan
- BMB 670 Module 6 Milestone Two: Safety, Fees and Sponsors
- OL 663 Module 9 Final Project: Complete Change Plan
- OL 751 Module 9 Final Project: The HR Strategy Proposal
QSO 570 Module 9 questions, answered
Where can I find a free QSO 570 Module 9 Final Project sample?
Read the full QSO 570 Module 9 final project here: a predictive analytics report on cancellations and retention calls at an invented fitness chain.
What should a predictive analytics report include?
The decision and target, data preparation and leakage checks, model comparisons on held-out data, the link from predictions to action and value, any test of the action, monitoring and limitations.
Why keep a control group after a model is deployed?
So that the effect of acting on predictions can keep being measured, since customer behavior and the model's accuracy can change over time.
What is model drift?
When a model that once predicted well slips because new data no longer follow the patterns it learned, which is why models need monitoring and retraining.
Should the most accurate model always be deployed?
Not automatically; the choice should weigh accuracy against cost, transparency and how much the gain changes the decisions the model supports.