Module One Discussion
Why Our Digital-First Plan Stalled
I am associate director for operations at Tallgrass University Press, a 110-year-old press at a Midwestern public university with 46 staff. In May 2023 our previous director emailed all staff and the faculty editorial board to say we were going "digital-first": print runs would mostly stop and an outside firm would take over the warehouse inside a year and a half. Within a week the head of the faculty board had complained to the provost about being left out, a petition from seven of our editors was circulating and our twelve warehouse workers assumed they would be laid off. By the following spring the director had retired and the plan was no longer mentioned.
Kotter (1996) argued that transformations usually fail because of a handful of leadership errors, among them allowing too much complacency, failing to create a powerful guiding coalition, undercommunicating the vision and declaring victory too soon. The popular claim that about seventy percent of change initiatives fail is weaker than it sounds: Hughes (2011) followed the figure back through the books and articles that repeat it and could not find a single study that had actually measured it. Burnes (2011), introducing a journal issue devoted to the question, argued that the high failure rates reported in practice point to problems in how change is understood and led rather than to change being impossible.
Two of Kotter's errors fit our case closely. There was no urgency anyone outside the director's office could feel: sales were falling, but staff had heard warnings for a decade, and the email offered no numbers. And there was no coalition. The board, the editors and the warehouse supervisor learned of the plan at the same moment as everyone else, so the people with the most influence over authors, faculty and the warehouse crew had every reason to defend the old way.
The digital-first idea was not foolish. Our monographs sell about 250 copies each and the subsidy that covers the gap is under threat. The plan failed because of how it was introduced, not what it proposed, which matters now that the university has announced a two-thirds cut to that subsidy and we have to try again.
In a change you have watched stall, which error did the most damage, and could anyone at the time have seen it coming?
References
Burnes, B. (2011). Introduction: Why does change fail, and what can we do about it? Journal of Change Management, 11(4), 445-450. https://doi.org/10.1080/14697017.2011.630507
Hughes, M. (2011). Do 70 per cent of all organizational change initiatives really fail? Journal of Change Management, 11(4), 451-464. https://doi.org/10.1080/14697017.2011.630506
Kotter, J. P. (1996). Leading change. Harvard Business School Press.
What the OL 663 Module 1 instructions ask for
The first OL 663 discussion asks students to explain why organizational change efforts so often stall or fail, usually by describing a change they have experienced and analyzing what went wrong. Expect to introduce Kotter's account of the errors leaders make, such as too little urgency, no powerful guiding coalition and a vision that is never communicated, and to apply it to your example with specifics: who announced the change, how, to whom and what happened next. Graduate posts also look critically at the evidence, since the widely repeated claim that most changes fail rests on thin data. The goal is a diagnosis, not a complaint about management. Replies should ask classmates which error did the most damage in their example.
How this OL 663 Module 1 discussion example is built
The post comes from the associate director for operations at Tallgrass University Press, an invented 110-year-old press with 46 staff at a Midwestern public university. In May 2023 the previous director announced by email that the press would become digital-first, ending most print runs and outsourcing its warehouse. The faculty editorial board protested that it had not been consulted, seven acquisitions editors signed a petition and the twelve warehouse workers assumed their jobs were gone. A year later the plan was dropped. The post maps those events to Kotter's errors, especially missing urgency and coalition, uses Hughes to question how often change really fails and Burnes to frame failure as a leadership problem, and asks classmates which error they meet most often.
Where the OL 663 Module 1 rubric puts the points
Grading of the first OL 663 discussion generally rewards an accurate account of why changes stall, a concrete example analyzed with specifics rather than impressions, correct use of Kotter's errors or a comparable model, a critical view of evidence on failure rates, a clear lesson for leaders and replies that probe classmates' diagnoses. Posts that separate the change itself from the way it was led stand out. Credit falls for retelling a bad experience without analysis, for citing the seventy percent figure as settled fact, for blaming employees for resisting and for replies that only share another story without testing the classmate's explanation. Instructors also value posts that admit what the writer did not see at the time.
OL 663 Module 1 help: the mistakes that cost points
Choose a change you saw closely enough to know who decided, how it was announced and how people reacted. Describe it in a few specific sentences: dates, groups, what was said. Read Kotter's list of the errors that undermine change and decide which ones fit your case, with evidence for each. Be careful with statistics on failure rates; recent research questions the most popular figure, so say what the evidence can and cannot support. Separate whether the change was a good idea from whether it was led well, since a sound change can still fail. End with one lesson for leaders and a question asking OL 663 classmates which error did most damage in their example.
Get OL 663 Module 1 written to your instructions
Tell us about a change you have seen stall and paste the OL 663 Module 1 prompt. We draft a post that traces where the effort lost momentum, tests the explanation against Kotter's common errors and newer research on change failure, and closes with a question that gets OL 663 classmates comparing their own stalled changes. The first OL 663 post is free and ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 663 papers and related MS Organizational Leadership samples
- OL 663 Module 2 Presentation: Kotter's Eight Steps Applied
- OL 663 Module 3 Milestone One: Urgency and the Guiding Coalition
- OL 663 Module 4 Discussion: Resistance as Information
- OL 663 Module 5 Milestone Two: Strategic Vision and Communication
- OL 663 Module 6 Discussion: Participation in Change
- OL 663 Module 7 Milestone Three: Empowering Action and Short-Term Wins
- OL 663 Module 8 Journal: Leading From the Middle of a Change
- OL 663 Module 9 Final Project: Complete Change Plan
- OL 663 Module 10 Journal: Critical Reflection on Leading Change
- FIN 620 Module 3 Milestone One: Structuring a $95 Million Water Revenue Bond
- MKT 555 Module 6 Milestone Two: Content Strategy, Calendar and Creators
- MGT 550 Module 1 Discussion: Why a Laundry Needs Managers Who Can Talk
- FIN 550 Module 6 Milestone Two: WACC, Scenarios and the Investment Decision
OL 663 Module 1 questions, answered
Where can I find a free OL 663 Module 1 Discussion sample?
This page carries the full OL 663 Module 1 post: why a university press's digital-first plan stalled within a year of being announced.
Why do most change efforts fail?
Kotter blamed mistakes by leaders: complacency left unchallenged, a thin leadership team, a vision nobody hears about and celebrating before the work is done; whether most changes fail is itself disputed.
Is it true that 70 percent of changes fail?
Probably not. When one scholar chased the figure back to its origins, none of the cited sources actually measured a failure rate, so the number is folklore rather than a finding.
What are Kotter's eight errors?
Allowing complacency, failing to build a guiding coalition, underestimating vision, undercommunicating it, permitting obstacles, failing to create short-term wins, declaring victory too soon and neglecting to anchor change in the culture.
Can a good change fail because of poor leadership?
Yes. The case for a change can be sound while the way it is introduced, communicated and supported causes it to stall.