OL 663 Module 2 Presentation Example

Reviewed by Portia Lambrick, MBA

This OL 663 Module 2 Presentation sample explains Kotter's eight-step model of leading change and applies each step to one organization, in slide text with speaker notes. SNHU OL 663 (OL-663) sets this short presentation early in its MS Organizational Leadership course so the model is in place before the milestones begin. The audience is the senior staff of Tallgrass University Press, an invented Midwestern university press that must cut its reliance on a campus subsidy by two thirds. Ten slides cover the steps from urgency to culture, and the notes bring in a review of the evidence for Kotter's model and an account of a program in which the stages overlapped.

CourseOL 663 Leading Change
ModuleModule 2
Paper typegraduate presentation explaining Kotter's eight-step model of leading change and applying each step to one organization, with slide text and speaker notes
Length12 slides with speaker notes, about 1,100 words
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 663 Module 2

1

Eight Steps for Tallgrass: Kotter's Model and Our Move to Open Digital Books

[Student Name]

Southern New Hampshire University

OL 663: Leading Change

Presentation

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe press, its senior staff and its finances are invented for OL 663.
2

Slide 1: The Decision in Front of Us

Campus subsidy: $1.8 million now, $600,000 by 2028

Monographs sell about 250 copies each

The question is how we change, not whether

Speaker notes: Good morning. I want to start with the number that brought us here. Over the next three years the university will cut what it gives us from $1.8 million a year to $600,000. Our monographs, which are most of what we publish, sell about 250 copies each, so the subsidy has been covering the gap between what a scholarly book costs and what it earns. We tried to change once, in 2023, and it stalled. Today I want to walk through a model of leading change that can help us avoid repeating that, step by step, with what each step would mean here.

What this page is doingOpens with the problem.
3

Slide 2: Step 1, Establish a Sense of Urgency

Share the real numbers with every staff member

Show the subsidy schedule and the sales trend

Let staff and the board ask hard questions early

Speaker notes: Kotter (1996) argued that most change efforts fail at the start because too many people are comfortable with the way things are. In 2023 our staff heard "digital-first" without seeing any numbers, so it sounded like a preference rather than a necessity. This time each employee and each board member should see the subsidy schedule, the decline in sales per title and what happens to the press if nothing changes. Urgency is not panic; it is a shared understanding that the current path ends.

What this page is doingMakes the case felt.
4

Slide 3: Step 2, Form a Guiding Coalition

Director, managing editor, two acquisitions editors

Faculty board chair and the head of the library

Warehouse supervisor and the business manager

Speaker notes: The second step is a team with enough credibility, expertise and authority to lead the change. Last time the plan came from one office. A coalition here should include the people others listen to: the faculty board chair, whom authors trust; two senior acquisitions editors; the head of the university library, who could fund open access; and the warehouse supervisor, because the people with the most to lose need someone at the table they recognize.

What this page is doingBuilds the team.
5

Slide 4: Step 3, Create a Vision and Strategy

Draft vision: our books read everywhere, paid for at the start

Strategy: open digital editions, print on demand

Library partners fund each title up front

Speaker notes: A vision should be short enough to say in a minute and concrete enough to guide decisions. A rough first version might promise open access to every new Tallgrass monograph, funded in advance by partner libraries and the university, with printed copies still available to order. The strategy behind it would be open digital editions, a print-on-demand partner instead of large print runs and agreements with libraries that pay a share of each title's cost.

What this page is doingGives direction.
6

Slide 5: Step 4, Communicate the Vision

Say it many times, in many places

Use authors' and editors' own words

Answer the question everyone asks: what about my job?

Speaker notes: Kotter found that leaders undercommunicate by a factor of ten or more. A single email in 2023 was our entire communication. This time the vision should appear in staff meetings, board meetings, conversations with authors and the press's website, and it should come from editors and board members as well as the director. Above all, the first message must answer the question every warehouse worker asked last time: what happens to my job?

What this page is doingSpreads understanding.
7

Slide 6: Step 5, Empower Broad-Based Action

Change royalty contracts that assume print sales

Retrain production staff for digital formats

Give editors authority to sign open-access titles

Speaker notes: People may support the vision and still be blocked. Our author contracts assume royalties from print sales. Our production staff know print layout better than accessible digital formats. And acquisitions editors currently need the director's approval for any title that departs from the usual model. Each of those obstacles has to be removed so people can act on the vision without asking permission for every step.

What this page is doingRemoves obstacles.
8

Slide 7: Step 6, Generate Short-Term Wins

First five open titles within a year

Track readers, not just copies sold

Celebrate the first library partnership publicly

Speaker notes: Kotter argued that changes lose momentum without visible wins within the first year or two. Ours could be five open titles published within twelve months, with reader counts that show a monograph read in forty countries instead of sold to 250 libraries. The first signed library partnership should be announced to staff and the board. Wins have to be real and clearly connected to the change, or they will look like publicity.

What this page is doingShows progress.
9

Slide 8: Steps 7 and 8, Build On Gains and Anchor the Change

Use early credibility to change the warehouse and contracts

Hire and promote for digital and open-access skills

Make open publication the default in board policy

Speaker notes: The last two steps are where many changes slip. After early wins, leaders are tempted to declare success. Step 7 uses the credibility of those wins to tackle harder changes, such as moving warehouse work to a distributor while retraining the crew. Step 8 anchors the change: board policy that makes open publication the default, hiring criteria that value digital skills and stories we tell new staff about why the press changed.

What this page is doingSustains it.
10

Slide 9: What the Model Does Not Settle

Many single steps are well supported

The model as a whole is rarely tested

In practice, stages overlap and repeat

Speaker notes: Kotter's model is a guide, not a proof. Appelbaum et al. (2012), reviewing research on the model, concluded that research backs a good number of the separate steps, while studies testing all eight together, in sequence, remain rare. Pollack and Pollack (2015), describing its use in an organizational change program, found the stages overlapping and running in parallel rather than following one another in order. For us, that means we will build urgency and the coalition together, and keep communicating long after step four.

What this page is doingNotes its limits.
11

Slide 10: What I Am Asking Today

Name the guiding coalition by month's end

Open the complete budget to all 46 staff next week

Draft the vision together in a working session

Speaker notes: I am asking for three things. First, agreement on who will sit on the guiding coalition, with invitations out by the end of the month. Second, permission to put the complete budget, not a summary, in front of all 46 of us next week. Third, a working session where this coalition drafts the vision together, so it belongs to more than one office. That is how we start differently from 2023.

What this page is doingCloses with the request.
12

References

Appelbaum, S. H., Habashy, S., Malo, J.-L., & Shafiq, H. (2012). Back to the future: Revisiting Kotter's 1996 change model. Journal of Management Development, 31(8), 764-782. https://doi.org/10.1108/02621711211253231

Kotter, J. P. (1996). Leading change. Harvard Business School Press.

Pollack, J., & Pollack, R. (2015). Using Kotter's eight stage process to manage an organisational change program: Presentation and practice. Systemic Practice and Action Research, 28(1), 51-66. https://doi.org/10.1007/s11213-014-9317-0

What the OL 663 Module 2 instructions ask for

The Module 2 assignment in OL 663 asks for a short presentation explaining Kotter's eight-step process for leading change and applying it to an organization, usually the student's own workplace or an assigned case. Expect a slide for each of the eight steps, from urgency and the coalition through vision, communication, empowerment and early wins to building on gains and making the change part of the culture, each with an example of what it would look like in practice. Slides should carry brief points while the speaker notes hold the explanation and citations. Strong presentations also note what research says about the model's strengths and limits rather than presenting it as a guaranteed recipe.

How this OL 663 Module 2 presentation example is built

The presentation is addressed to the senior staff of Tallgrass University Press, a fictional 110-year-old press at a Midwestern public university whose campus subsidy will fall from $1.8 million to $600,000 over three years. Ten slides open with the decision the press faces and then give one slide to each of Kotter's steps, showing what it would mean for a move from print monographs to open digital books: the numbers that create urgency, a coalition that includes the faculty board and the warehouse supervisor, a vision in one sentence, early wins such as the first open titles and a culture in which open access is normal. Appelbaum and colleagues' review and Pollack and Pollack's experience of using the model in practice shape the closing slide.

Where the OL 663 Module 2 rubric puts the points

OL 663 Module 2 presentations are usually graded on an accurate explanation of all eight steps, a specific application of each step to the organization, slides that are concise and readable, speaker notes that explain rather than repeat the slides, attention to research on the model and correct citation. Decks that show how the steps connect, and where the model is weaker, earn the most credit. Marks are lost for slides crowded with paragraphs, for generic examples that could apply to any organization, for skipping the later steps that sustain change, or for presenting the model as proven in every setting. Speaker notes that cite sources in APA style count toward the writing criterion.

OL 663 Module 2 help: the mistakes that cost points

List the eight steps and, for each one, write one concrete action your organization would take, using names of groups, dates and numbers where you can. Keep slide text to three or four short lines; put the reasoning in the speaker notes. Open with the decision or problem so the audience knows why the model matters, and close with what the model does not settle. Read at least one review of the evidence on Kotter's approach so you can say where it is well supported and where it is mostly practitioner wisdom. Check that later steps, consolidating gains and anchoring change, get as much thought as the first ones. Rehearse aloud to see whether the notes fit the time limit.

Get OL 663 Module 2 written to your instructions

Send the OL 663 Module 2 directions and tell us which organization your slides must cover. We build a slide deck that explains each of Kotter's eight steps, applies it to your case with concrete actions, adds speaker notes grounded in research on the model and keeps the slides short enough to present. Your first OL 663 deck costs nothing; most are finished within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 663 papers and related MS Organizational Leadership samples

OL 663 Module 2 questions, answered

Where can I find a free OL 663 Module 2 Presentation sample?

The complete OL 663 Module 2 deck, slide text and speaker notes, is on this page, applying Kotter's eight steps to a university press.

What are Kotter's eight steps?

In order: make the need for change felt, assemble a strong leading team, set a vision with a strategy, share it widely, clear obstacles so people can act, deliver early wins, build on them toward bigger changes and lock the new ways into the culture.

Is Kotter's model supported by research?

Reviews find support for many individual steps but little direct testing of the model as a whole, so it is best treated as a well-grounded guide rather than a proven formula.

Do Kotter's steps have to happen in order?

Kotter presented them as a sequence, but accounts of real programs find that several stages run at the same time and some are revisited.

How long should speaker notes be?

Long enough to explain each slide in your own words with citations, typically 80 to 150 words per slide, so the slides themselves can stay short.