Free sample paper for OL 663 Module 3
One Email Is Not Urgency: Kotter's First Two Steps at Tallgrass University Press
[Student Name]
Southern New Hampshire University
OL 663: Leading Change
Milestone One: Urgency and the Guiding Coalition
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
One Email Is Not Urgency: Kotter's First Two Steps at Tallgrass University Press
Introduction
Tallgrass University Press has published scholarship for 110 years from a Midwestern public university, with 46 staff, a faculty editorial board and its own warehouse. In 2023 its director tried to move the press to a digital-first model; within a year the effort had stalled and been dropped. Then in 2025 the university said the subsidy would shrink by two thirds over three years, so the press has to try again. This milestone examines Kotter's first two steps in the 2023 attempt: what actually happened in establishing urgency and forming a guiding coalition, and what should have been done instead.
Kotter's First Two Steps
Kotter (1996) argued that change begins with a sense of urgency strong enough that enough people, including a majority of managers, believe the status quo is more dangerous than the unknown. Step two puts that urgency in the hands of a guiding coalition, which in his account needs four ingredients in combination, formal authority, relevant knowledge, standing with colleagues and the capacity to lead, held together by mutual trust and one shared aim. Without both, Kotter argued, even good plans are absorbed by the organization's routines. Research on readiness adds detail. Armenakis et al. (1993) treated readiness as the set of beliefs that comes before support or resistance, and proposed building it with a message telling people both why the present cannot continue and why the organization is able to change, carried by persuasion, active involvement and voices from outside.
What Happened: Establishing Urgency
The press's financial position had been deteriorating for years. Average sales per monograph had fallen from about 600 copies in 2010 to about 250, and the subsidy was covering a growing share of costs. Staff knew sales were down but had heard such warnings before and had seen the subsidy continue. In May 2023 the director sent a single message to staff and board: the press was going digital-first, would print far fewer books and would contract out its warehouse by late 2024. The email gave no figures, no reason for the timing and no invitation to discuss. Staff responses ranged from confusion to anger. The faculty board's chair protested to the provost over the lack of consultation; a delay was requested in a petition carrying seven editors' signatures; the twelve warehouse workers concluded they would be laid off, and two left within months.
What Happened: The Guiding Coalition
The plan was developed by the director and the business manager over several months, with advice from a consultant. Neither the managing editor, the acquisitions editors, the faculty board, the library nor the warehouse supervisor took part. Judged against Kotter's four qualities, the group had position power, since the director could approve the change, and some expertise in finance, but lacked expertise in acquisitions and production, had little credibility with faculty authors and editors and included no one who could speak for the warehouse staff. When the director retired in early 2024, there was no one left to carry the plan.
Why the Start Failed
Armenakis and Harris (2009), reflecting on decades of their research, listed five things people must come to believe before they back a change. They must accept that the present course cannot hold (discrepancy), judge the chosen fix a sensible one (appropriateness), trust that the press can pull it off (efficacy), see leaders standing behind it (principal support) and know what they personally gain or lose (personal valence). The 2023 email attempted only appropriateness, and without numbers. It did not establish discrepancy, offered no reason to believe the press could succeed, showed no support beyond the director and left personal valence to rumor, which in the warehouse meant layoffs. In a review spanning sixty years of survey and experimental studies of how employees respond to change, Oreg et al. (2011) found that reactions depend not only on the content of a change but on the process, including communication and participation, and on how much people trust management. Staff who were told nothing and asked nothing reacted as that research would predict.
What Should Have Happened: Urgency
Urgency should have been built before any solution was announced. Every staff member and board member should have seen the same figures: sales per title, the share of costs the subsidy covered and the trend that would leave the press dependent on a single budget line the university was already questioning. Open sessions, one with the board and two with staff, should have invited people to test the figures and add their own, such as editors' reports that authors were asking for open-access options. Hearing from outside voices, such as a librarian explaining why the library was buying fewer monographs, would have made the problem harder to dismiss. Only then should the director have proposed a direction, explaining why digital publication fit the problem and what it would mean for each group.
What Should Have Happened: The Coalition
A coalition of eight should have led the change: the director; the managing editor; two senior acquisitions editors respected by faculty authors; the faculty board chair; the dean of the university library, whose budget could support open access; the warehouse supervisor; and the business manager. That group would have combined the director's position power with expertise in acquisitions, production, finance and libraries, credibility with authors and the board and a voice for warehouse staff. It should have met as a working team, away from the regular staff meeting, and taken time to agree on the problem before discussing solutions, which is how trust forms among people with different stakes.
Applying the Lessons in 2025
The 2025 subsidy announcement gives the press an outside source of urgency it lacked in 2023, but outside pressure alone does not make people believe the press can succeed. The new director has opened the books to all 46 employees, held open sessions in which staff added their own evidence and invited the faculty board chair, the library dean and the warehouse supervisor onto a guiding team before any plan was drafted. The warehouse question was answered first: every member of the crew keeps a job at the press or the university, even if the job itself looks different. That promise speaks to personal valence before rumor gets the chance.
Limits of the Analysis
The account of 2023 relies on staff recollections and the documents that survive, and the former director's own reasoning is known only through the consultant's report. It is possible that the director shared more with some individuals than the record shows. The analysis also assumes that an earlier, broader coalition would have held together; editors and the warehouse staff may have disagreed about the plan's details even with a seat at the table.
Conclusion
The 2023 attempt failed at its first two steps: the urgency was the director's alone, and the coalition could approve a plan but not carry one. A credible, shared case and a guiding team that includes the people who influence authors, faculty and the warehouse give the press a starting point. Milestone Two turns to the vision that team must write and how it will be communicated.
References
Armenakis, A. A., & Harris, S. G. (2009). Reflections: Our journey in organizational change research and practice. Journal of Change Management, 9(2), 127-142. https://doi.org/10.1080/14697010902879079
Armenakis, A. A., Harris, S. G., & Mossholder, K. W. (1993). Creating readiness for organizational change. Human Relations, 46(6), 681-703. https://doi.org/10.1177/001872679304600601
Kotter, J. P. (1996). Leading change. Harvard Business School Press.
Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. The Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550
What the OL 663 Module 3 instructions ask for
Milestone One of the OL 663 final project asks students to analyze a change case on Kotter's first two steps. For establishing a sense of urgency, describe what leaders actually did and how people responded, then explain what should have been done. For forming a guiding coalition, identify who led the change, whether that group had enough power, expertise, credibility and leadership, and who should have been included. The milestone rewards a clear separation between what occurred and what ought to have occurred, with evidence from the case for the first and reasoning from Kotter and research for the second. It also prepares the ground for Milestone Two, so the analysis should leave the organization ready to form a vision.
How this OL 663 Module 3 milestone one example is built
The paper analyzes Tallgrass University Press, a made-up 110-year-old press at a Midwestern public university. In its 2023 attempt, urgency rested on a single email announcing a digital-first future, with no figures, while the only people leading the change were the director and the business manager. The faculty board, the senior editors and the warehouse staff learned of the plan with everyone else, and it stalled within a year. The paper explains what should have happened: the subsidy schedule and sales per title shared with all staff, open sessions to test the case and a coalition of eight with the board chair, two senior editors, the library dean and the warehouse supervisor. Armenakis's readiness research and Oreg's review of reactions to change frame it.
Where the OL 663 Module 3 rubric puts the points
Milestone One in OL 663 is generally scored on an accurate account of what actually happened on urgency and on the guiding coalition, a well-reasoned explanation of what should have been done for each, use of evidence from the case, correct application of Kotter's first two steps, support from research and clear writing in APA style. Papers that test the coalition against Kotter's four criteria, authority, know-how, reputation and the ability to lead, earn the most. Marks are lost for mixing what happened with what should have happened, for coalitions made only of senior executives, for urgency that amounts to fear, or for skipping the people most affected by the change. A short link to the vision work in Milestone Two also helps.
OL 663 Module 3 help: the mistakes that cost points
Read the case twice, once for what leaders did and once for how people responded, and keep the two lists apart. For urgency, record exactly what people were told, by whom, with what evidence, and what they did next. For the coalition, list who led and ask whether, together, they had the authority, know-how, standing and leadership ability the change required. Then write what should have happened, explaining why each change would have worked, with support from research on readiness and reactions to change. Watch for the difference between urgency and fear: people need to see the problem and believe it can be solved. Include the groups who could block the change in your coalition. Close by showing how a better start would set up the vision.
Get OL 663 Module 3 written to your instructions
Upload the OL 663 Milestone One guidelines and your case study. We analyze what actually happened on Kotter's first two steps, what should have happened instead and why, with evidence from the case and research on readiness for change, in a paper that sets up the later milestones cleanly. The first OL 663 Milestone One is free and normally back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 663 papers and related MS Organizational Leadership samples
- OL 663 Module 1 Discussion: Why Change Efforts Stall
- OL 663 Module 2 Presentation: Kotter's Eight Steps Applied
- OL 663 Module 4 Discussion: Resistance as Information
- OL 663 Module 5 Milestone Two: Strategic Vision and Communication
- OL 663 Module 6 Discussion: Participation in Change
- OL 663 Module 7 Milestone Three: Empowering Action and Short-Term Wins
- OL 663 Module 8 Journal: Leading From the Middle of a Change
- OL 663 Module 9 Final Project: Complete Change Plan
- OL 663 Module 10 Journal: Critical Reflection on Leading Change
- ACC 610 Module 3 Milestone One: A Bundled Drone Contract Under ASC 606
- TAX 655 Module 10 Discussion: Selling the Company Someday
- MKT 675 Module 2 Claims Substantiation Assignment: Auditing Health and Quality Claims
- MBA 687 Module 1 Correspondence on a Failed Change: Why the last rollout at Veritane failed
OL 663 Module 3 questions, answered
Where can I find a free OL 663 Module 3 Milestone One sample?
The full OL 663 Milestone One is on this page: urgency and the guiding coalition in a university press's failed 2023 change, and what should have happened.
What is a guiding coalition?
Kotter's name for the group that steers a change: people with the authority, knowledge, reputation and leadership skill to move the organization, who trust one another and want the same outcome.
How do leaders create a sense of urgency?
By making the gap between current results and what is needed visible and credible, often with hard data, frank discussion and exposure to customers or outside views, without creating panic.
What is readiness for change?
How far the people in an organization think a change is necessary and feel able to make it work, which shapes whether they support it or push back.
What should a change message include?
Research points to five components: why change is needed, why this change is right, confidence it can succeed, support from leaders and what is in it for the people affected.