| Course | OL 663 Leading Change |
|---|---|
| Module | Module 10 |
| Paper type | graduate critical reflection journal on what the course taught the writer about leading change, how the writer's assumptions changed and how the learning will be applied |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 663 Module 10
Module Ten Journal
What I Believed About Change in Week One
In my Module 1 post I described the 2023 email that sank our first attempt to change Tallgrass University Press, and I thought the problem was the email: too short, no numbers, bad timing. I believed that a sound plan, well announced, would carry a change. I now think the email was a symptom. The deeper problem was that two people decided everything and forty-four found out afterward.
Three moments did it. In Module 3, analyzing the coalition, I saw that the 2023 plan had position power and nothing else. In Module 6, the warehouse working group redesigned the retraining plan in ways none of us on the coalition had imagined. And in Module 8, a specialist I had hired resigned because I designed her job alone.
Kotter's steps were useful, but they did not arrive in order. Pollack and Pollack (2015), applying the eight stages in a real change program, found stages overlapping and running in parallel, which matches what happened to us: we were still building urgency with the board while removing obstacles in production. Burnes (2004) showed that Lewin's work, often reduced to three steps, centered on groups and participation, which describes what actually moved our staff better than any step did. Stouten et al. (2018) found that steps shared across practitioner models have support in research but warned against mechanical use. I came close to that, treating each milestone as a box to fill. My Milestone Two vision went through four drafts because I kept polishing the sentence instead of asking whether the warehouse crew would recognize themselves in it. The model also says little about the people who carry a change day to day, which is where our real trouble came from. Kotter's framework told me what to do next; it did not tell me who would pay for it in late nights.
First, I will decide who is in the room before I decide what the plan says. Second, I will tell people plainly which decisions are theirs and which are not, and then report back what their input changed. Third, I will check workloads during a change as closely as budgets, because the person carrying the change can break before the plan does.
References
Burnes, B. (2004). Kurt Lewin and the planned approach to change: A re-appraisal. Journal of Management Studies, 41(6), 977-1002. https://doi.org/10.1111/j.1467-6486.2004.00463.x
Pollack, J., & Pollack, R. (2015). Using Kotter's eight stage process to manage an organisational change program: Presentation and practice. Systemic Practice and Action Research, 28(1), 51-66. https://doi.org/10.1007/s11213-014-9317-0
Stouten, J., Rousseau, D. M., & De Cremer, D. (2018). Successful organizational change: Integrating the management practice and scholarly literatures. Academy of Management Annals, 12(2), 752-788. https://doi.org/10.5465/annals.2016.0095
What the OL 663 Module 10 instructions ask for
The closing OL 663 journal asks for a critical reflection on the course as a whole. Expect to describe what you believed about leading change when you started, what changed and why, and how you will apply what you learned. A critical reflection goes beyond summary: it examines assumptions, tests them against evidence, acknowledges limits in the models studied and in your own thinking and draws conclusions you can act on. Use specific moments from the course or your change plan as evidence, and connect them to research. The voice is your own, in the first person, though organization and APA citation still count. Make the closing commitments observable, the kind a coworker would notice you keeping or breaking.
How this OL 663 Module 10 journal example is built
The entry comes from the associate director for operations at Tallgrass University Press, an invented Midwestern university press whose change plan the writer has built across the course. The writer started the course believing that change succeeded when leaders wrote a sound plan and announced it clearly, and the 2023 email that sank the press's first attempt seemed simply poorly written. Ten modules later, the writer believes change depends on who is in the room and what they may decide. Pollack and Pollack's experience of overlapping stages, Burnes's reappraisal of Lewin's group-centered approach and Stouten and colleagues' integration of evidence test that new belief, and the entry closes with three practices for future changes.
Where the OL 663 Module 10 rubric puts the points
Grading of the final OL 663 journal generally rewards a clear account of the writer's assumptions at the start, honest analysis of how and why they changed, critical engagement with the course's models including their limits, use of research and specific evidence from the course, and concrete commitments for future practice. Reflections that question a model they found useful, not just praise it, earn the most credit. Marks fall for journals that summarize course content without examining the writer's thinking, that list lessons without evidence, that accept every model uncritically or that close with general resolutions. Clear organization and correct citation still count, even in a personal entry.
OL 663 Module 10 help: the mistakes that cost points
Start by writing down, as honestly as you can, what you believed about leading change at the beginning of the course; your first discussion post can help. Identify the moments that challenged those beliefs, such as a reading, feedback on a milestone or something that happened at work. Explain what you believe now and why, using research and your change plan as evidence. Be critical of the models as well: where did Kotter's steps fit your case awkwardly, and what did other research add? Avoid summarizing the course module by module. End with two or three practices you will carry into your next change, each concrete enough that a colleague would notice whether you followed through.
Get OL 663 Module 10 written to your instructions
Paste the OL 663 Module 10 journal prompt and tell us what you expected from the course and what surprised you. We write a first-person critical reflection that traces how your assumptions about leading change shifted, tests them against research on Kotter and planned change and closes with habits you can show in your next change. Your first OL 663 reflection is free; expect it in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 663 papers and related MS Organizational Leadership samples
- OL 663 Module 1 Discussion: Why Change Efforts Stall
- OL 663 Module 2 Presentation: Kotter's Eight Steps Applied
- OL 663 Module 3 Milestone One: Urgency and the Guiding Coalition
- OL 663 Module 4 Discussion: Resistance as Information
- OL 663 Module 5 Milestone Two: Strategic Vision and Communication
- OL 663 Module 6 Discussion: Participation in Change
- OL 663 Module 7 Milestone Three: Empowering Action and Short-Term Wins
- OL 663 Module 8 Journal: Leading From the Middle of a Change
- OL 663 Module 9 Final Project: Complete Change Plan
- MKT 555 Module 4 Discussion: Content That Earns Attention
- MKT 500 Module 7 Milestone Seven: Segmentation, Targeting and Positioning
- OL 620 Module 6 Discussion: Employee Benefits Design
- ACC 692 Module 9 Milestone Three: Preparing to Testify as an Expert
OL 663 Module 10 questions, answered
Where can I find a free OL 663 Module 10 Journal sample?
This page holds the full OL 663 Module 10 critical reflection on leading change, written from a university press's change plan.
What is a critical reflection?
A reflection that examines the writer's assumptions, tests them against evidence and experience, recognizes limits and draws conclusions that change future practice.
What are the limits of Kotter's model?
It is based mainly on practice rather than controlled research, presents steps as a sequence when they often overlap and can be applied mechanically without attention to context.
What did Lewin contribute to change management?
Lewin studied how groups shape behavior and how research can be done alongside practitioners; his famous three phases, unfreezing, moving and refreezing, were only one part of that work.
How do you end a critical reflection journal?
With specific practices you will adopt, tied to what you learned, rather than general statements about communicating better.