QSO 420 Integrated Cost and Schedule Control sample papers, module by module

Reviewed by Portia Lambrick, MBA

QSO 420 covers how project managers plan, measure and control cost and schedule as one system: estimates and budgets, control accounts, performance measurement baselines, earned value and earned schedule, variance analysis, forecasting and change control. The samples follow one public construction project from its first budget to the month its board asks for a new baseline.

QSO 420 is SNHU’s Integrated Cost and Schedule Control course. It centers on integrated cost and schedule control: cost estimating and budgeting, contingency and management reserve, work breakdown structures and control accounts, the performance measurement baseline, earned value measurement methods, cost and schedule variances and indexes, variance thresholds and analysis reports, earned schedule, estimates at completion and the to-complete index, corrective action, change control and baseline integrity. Every module below opens a full sample paper or takes a free request for one; searches like "qso 420 module 3", "QSO420 sample paper" and "QSO 420 milestone example" land on this page.

What QSO 420 is really about

Within SNHU's project management coursework, QSO 420 goes deeper than an introduction to earned value. Credit goes to work that builds budgets from the work breakdown structure up, separates contingency from management reserve, chooses an honest way to measure progress for each kind of work, explains variances by cause rather than by restating them, forecasts with methods suited to those causes and protects the baseline from being quietly rewritten.

The papers study the Sauk Bend Park District, a made-up Illinois park district building a family aquatic center with a construction manager at risk under a guaranteed maximum price of $11.9 million, a winter shutdown for concrete and a fixed opening date. The district, its contractors, its board and every figure in these QSO 420 samples are fictional.

What QSO 420’s modules ask for

QSO 420 commonly asks for discussions on integrating cost and schedule, measurement methods, earned schedule and baseline changes, a budgeting assignment, Project One building an integrated baseline, a variance analysis assignment and Project Two, a forecast and corrective action report with estimates at completion, recovery options and change control.

Where students lose points in QSO 420

QSO 420 papers lose points when budgets are top-down guesses, contingency and reserve are lumped together, progress is measured by money spent, variances are restated instead of explained, every forecast assumes the same cost performance, SPI is trusted near the end of a job and the baseline is changed to make variances disappear.

The QSO 420 drawers

Module 1

QSO 420 Module 1 Discussion example

The opening QSO 420 post sets up the single project every later module returns to, the Sauk Bend Park District's $14.6 million outdoor aquatic center in an invented Illinois town, which must open for Memorial Day weekend 2028, and shows why its budget report and its schedule report, tracked by different people, could both look fine while the project slips: by month seven the district had spent 98 percent of its planned money while finishing only about 91 percent of the planned work; it draws on Kwak and Anbari on earned value in government projects, Anbari on earned value as an integration of scope, cost and schedule and Odeck on the size of overruns in public construction. Full sample paper, read it free.

Read the sample →
Module 2

QSO 420 Module 2 Budgeting Assignment example

The Module 2 assignment builds the budget for the Sauk Bend Park District's $14.6 million aquatic center at the invented Illinois park district: six construction control accounts inside the $11.9 million guaranteed maximum price, from $1.65 million of site work to $4.2 million of pools and mechanical systems, $1.5 million of owner costs, a $700,000 owner contingency sized from a simulation of expected changes to cover them with about 95 percent confidence and a $500,000 management reserve held by the board; it time-phases the construction budget into a monthly S-curve that flattens during the December to February concrete shutdown, explains who may release each reserve and draws on Globerson on how the work breakdown structure shapes control, Touran's probabilistic model for contingency and Odeck on public construction overruns. Full sample paper, read it free.

Read the sample →
Module 3

QSO 420 Module 3 Project One example

Project One builds the performance measurement baseline for the Sauk Bend Park District's aquatic center at the invented Illinois park district: the critical path from excavation through pool shells, piping tests, plaster, fill and health inspection to a Memorial Day opening, with the December to February concrete shutdown as a hard window; the six control accounts loaded onto the schedule; an earned value measurement method for each, from quantities for site work and weighted milestones for the pools to percent complete by schedule of values for the bathhouse; variance thresholds of 10 percent or $100,000 for cost and $150,000 for schedule; and a baseline review and change control process; it draws on Kim, Wells and Duffey on what makes earned value implementations succeed, Anbari on earned value methods and Kwak and Anbari on government practice. Full sample paper, read it free.

Read the sample →
Module 4

QSO 420 Module 4 Discussion example

The Module 4 post settles an argument at the Sauk Bend Park District's aquatic center, at the invented Illinois park district, over how to credit progress on the pool shells: the construction manager wanted to report an estimated percent complete, which at month seven would have earned about $1.95 million, while the weighted milestones in the baseline, crediting rebar and shells only when finished and accepted, earned $1.72 million; it explains why the $230,000 gap matters on the critical path, when percent complete, physical units, weighted milestones and 0/100 each fit, and draws on Anbari on earned value methods, Kim, Wells and Duffey on trust in earned value data and Snow, Keil and Wallace on optimistic bias in status reports. Full sample paper, read it free.

Read the sample →
Module 5

QSO 420 Module 5 Variance Analysis Assignment example

The Module 5 assignment analyzes month seven of the Sauk Bend Park District's aquatic center at the invented Illinois park district: overall planned value of $5.10 million, earned value of $4.62 million and actual cost of $4.98 million give an SPI of 0.91 and a CPI of 0.93, but the totals hide four different stories; applying the baseline's thresholds, it writes variance reports for site work, where $140,000 of unforeseen rock belongs in a change order against owner contingency, the pools, $380,000 behind after two rejected rebar submittals and over cost by $120,000 under the construction manager's risk, the slides, slightly behind on tower foundations, and the bathhouse, over cost on masonry, and leaves electrical alone at exactly the threshold; it draws on Kwak and Anbari on government earned value practice, Anbari on indexes and Lipke, Zwikael, Henderson and Anbari on early indexes. Full sample paper, read it free.

Read the sample →
Module 6

QSO 420 Module 6 Discussion example

The Module 6 post shows why the Sauk Bend Park District's aquatic center at the invented Illinois park district cannot rely on the schedule performance index as opening day nears: because earned value and planned value both end at the $11.9 million budget, SPI drifts back toward 1.0 even if the project finishes late, so a project a full month late at the end of April 2028 would still show an SPI of about 0.97; earned schedule instead converts earned value into the time at which it was planned, giving a delay in months that matches what the crews see; the post draws on Vandevoorde and Vanhoucke's test of several ways to forecast a finish date, Lipke, Zwikael, Henderson and Anbari on earned schedule indexes and Vanhoucke and Vandevoorde's simulation study. Full sample paper, read it free.

Read the sample →
Module 7

QSO 420 Module 7 Project Two example

Project Two reports on the aquatic center the invented Sauk Bend Park District in Illinois is building, as of the end of November 2027, month ten: with the rock change order approved the budget is $12.04 million, and planned value of $7.715 million, earned value of $7.01 million and actual cost of $7.38 million give an SPI of 0.91, a CPI of 0.95 and an earned schedule 0.85 months behind; estimates at completion range from $12.41 million to $13.21 million, with $12.68 million chosen because the remaining overruns are performance-driven, and a to-complete index of 1.08 shows the budget cannot be met; three recovery options for the unfinished pool shells are compared against the winter shutdown and heated enclosures costing $185,000, shared 60 to 40 with the construction manager, are recommended to keep the Memorial Day opening; two further changes go through change control, and the report uses Lipke, Zwikael, Henderson and Anbari on forecasting, Vandevoorde and Vanhoucke on duration forecasts and Touran on contingency. Full sample paper, read it free.

Read the sample →
Module 8

QSO 420 Module 8 Discussion example

The closing QSO 420 post responds to a park board member at the invented Sauk Bend Park District who, tired of seeing an SPI of 0.91 and a CPI of 0.95 on the aquatic center, asks staff to reset the baseline to the current forecast so that the reports show the project on plan; it separates a legitimate re-plan of remaining work for approved changes from a rubber baseline that erases history, explains what the board would lose, draws on Flyvbjerg on misrepresentation in large projects, Kwak and Anbari on how government agencies protect baselines and Smith and Keil on the pressure that keeps bad news quiet, and proposes reporting both the original baseline and a separate forecast. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a QSO 420 sample the right way

Sauk Bend's QSO 420 projects follow the aquatic center through its baseline and its trouble: Project One builds the performance measurement baseline from six control accounts with measurement methods and thresholds, and Project Two forecasts the final cost and opening date at month ten, tests recovery options against the winter shutdown and decides which changes go through change control. Send your QSO 420 instructions and project; your first custom sample is free and usually ready in two days.

QSO 420 questions, answered

What does QSO 420 cover?

Integrated cost and schedule control: budgeting, contingency and reserves, control accounts, baselines, earned value and earned schedule, variance analysis, forecasting and change control.

What are the QSO 420 projects?

Project One builds an integrated cost and schedule baseline; Project Two analyzes performance, forecasts completion and plans corrective action and change control.

Is the Sauk Bend Park District real?

No. The Sauk Bend Park District, its aquatic center and its contractors were invented for these QSO 420 samples.