QSO 450 Module 2 Mode and Carrier Selection Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 450 Module 2 Mode and Carrier Selection Assignment sample chooses transportation modes and carriers for a shipment profile on total cost, service and damage, with a carrier scorecard and a procurement approach. SNHU QSO 450 (QSO-450) assigns mode and carrier selection in Module 2 of its BS Operations Management transportation course. The shipper is Bristol Creek Coach Components, an invented Elkhart, Indiana, maker of RV doors, windows and steps that sends 61,000 aftermarket shipments a year to dealers. The paper finds that big, light doors cost more and break more by parcel, moves them to palletized freight and cuts 140 occasional carriers to four.

CourseQSO 450 Transportation Management
ModuleModule 2
Paper typeundergraduate assignment choosing transportation modes and carriers for a shipment profile on total cost, service and damage, with a carrier scorecard and procurement approach
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 450 Module 2

1

Sixty-Eight Pounds That Bill as 174: Mode and Carrier Selection for Bristol Creek's Aftermarket Freight

[Student Name]

Southern New Hampshire University

QSO 450: Transportation Management

Mode and Carrier Selection Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe shipment profile, rates and damage figures for Bristol Creek Coach Components in this QSO 450 assignment are invented.
2

Sixty-Eight Pounds That Bill as 174: Mode and Carrier Selection for Bristol Creek's Aftermarket Freight

Introduction

Bristol Creek Coach Components ships about 61,000 aftermarket orders a year to RV dealers and service centers across the country: replacement entry doors, windows, steps and hardware. These shipments cost about $2.7 million a year. Parcel takes $1.1 million; less-than-truckload, or LTL, takes the other $1.6 million, spread across about 140 carriers chosen order by order by whoever is shipping. Dealers complain about damage and late deliveries. This assignment profiles the shipments, compares modes for each kind of shipment on total cost, designs a carrier scorecard and recommends a procurement approach.

What this page is doingSets out the aftermarket problem.
3

Shipment Profile

Aftermarket shipment profile, last twelve months

SegmentShipmentsTypical sizeCurrent modeFreight cost
Entry doors, boxed9,80084 x 36 x 8 inches, 68 lbParcel$568,000
Windows and small parts37,200Under 40 lbParcel$532,000
Steps and multi-item orders9,600150 to 600 lbLTL$1,080,000
Pallets of mixed parts to large dealers4,400600 to 2,500 lbLTL$520,000
Total61,000$2,700,000

The profile shows that the parcel spend is dominated by doors, although they are only about one in five parcel shipments.

What this page is doingSegments the shipments.
4

Comparing Modes for Doors

A boxed entry door is 84 by 36 by 8 inches, about 24,200 cubic inches. Parcel carriers bill large packages by dimensional weight, the volume divided by a divisor of 139, so the door bills as about 174 pounds although it weighs 68. It also incurs oversize surcharges. Including those, Bristol Creek paid an average of about $58 per door last year.

Doors shipped by parcel also break. Of 9,800 parcel door shipments, about 6.1 percent were damaged, mostly corners crushed or glass cracked in sortation equipment. Each damaged door costs about $310 to replace, reship and handle, so damage added about $185,000.

The alternative is to palletize doors and ship them by LTL with a regional carrier, either one per pallet for urgent orders or consolidated with a dealer's weekly order. Quotes from two regional carriers average about $52 per door with residential and liftgate charges where needed, and Bristol Creek's own LTL door shipments to large dealers show damage of about 1.8 percent.

Annual cost of shipping 9,800 doors

CostParcelLTL, palletized
Freight$568,000$510,000
Damage, at $310 per damaged door$185,000$55,000
Total$753,000$565,000

Moving doors to LTL saves about $188,000 a year. Transit time rises by about one day on average, which dealers accepted in a short survey if the doors arrive intact. Windows and small parts stay with parcel, where they are cheap, fast and rarely damaged.

What this page is doingCalculates the total cost.
5

Steps and Pallets

Steps and multi-item orders, 9,600 shipments a year, already move by LTL and should stay there; at 150 to 600 pounds they are too heavy for parcel and too small for truckload. Their problem is carrier choice, not mode: on-time delivery on these shipments was only about 89 percent, and the same lanes were served by dozens of carriers with different transit times. Pallets of mixed parts to the largest dealers, 4,400 shipments a year, are a candidate for a different change. About 60 dealers receive a pallet nearly every week, and grouping their orders on two fixed weekly days by region would let some of them travel together on a multi-stop truckload, which regional carriers price well below separate LTL shipments. That option is left for the bid, where carriers can quote it.

What this page is doingChecks the LTL segments.
6

Dealer Requirements

A short survey of 120 dealers asked what mattered most when ordering replacement parts. Arrival without damage ranked first, followed by a reliable delivery date and then speed. Only about one dealer in six said that a one-day difference in transit mattered for a door, usually because a customer's RV was waiting in the service bay, and those orders can be flagged for expedited single-pallet shipment. The survey supports the weights in the scorecard below.

What this page is doingChecks what customers need.
7

Carrier Selection Criteria

Murphy et al. (1997) found that shippers and carriers did not always agree on which selection criteria mattered most, with carriers sometimes overestimating the weight shippers place on price. Bristol Creek's dealers care most about doors and steps arriving on time and undamaged, so the criteria reflect that.

LTL carrier scorecard

CriterionWeightMeasure
On-time delivery30%Share of shipments delivered by the promised date
Damage and claims25%Damaged shipments per hundred, claim settlement time
Cost25%Total cost on Bristol Creek's lanes, including accessorials
Billing accuracy10%Share of invoices matching the quoted rate
Coverage and capacity10%Direct service to Bristol Creek's dealer zip codes
What this page is doingDefines and weights what matters.
8

Procurement Approach

Bristol Creek's 140 carriers carry an average of about 100 shipments a year each, too few for any of them to price Bristol Creek's freight well or for Bristol Creek to measure them. Caplice and Sheffi (2003) show how a shipper can collect lane-by-lane bids and then use an optimization model, fed with service data as well as prices, to decide which carrier gets which freight at the lowest total cost that still meets service rules. Bristol Creek's volume is too small for a complex auction, but it can follow the same logic: package its LTL freight into lane groups, invite twelve carriers to bid with a full shipment history, score bids with the scorecard and award to one national carrier, two regional carriers and one specialty carrier for oversized doors and steps.

Before the bid, Bristol Creek will benchmark its current costs against quotes for consolidated volume. Sheffi (2004) describes how carriers can price packages of lanes more sharply when the packages fit their networks, which is why the bid will group dealer zip codes by region rather than inviting carriers to price single shipments. Bristol Creek's analysis suggests its scattered LTL spend costs about 9 percent more than consolidated pricing for comparable shippers would, which on $1.6 million of LTL is about $144,000 a year.

What this page is doingPlans the bid.
9

Measuring After Award

Each carrier will receive a quarterly scorecard. A carrier below 95 percent on-time or above 2 percent damage for two quarters will lose volume to the others. Bristol Creek will also audit invoices against contracted rates, since billing accuracy is weighted in the scorecard and errors are common when rates are complex.

What this page is doingKeeps carriers accountable.
10

Conclusion

Bristol Creek should ship doors palletized by LTL, saving about $188,000 a year in freight and damage, keep windows and small parts with parcel and consolidate its LTL freight from about 140 carriers to four through a scored bid, worth about $144,000 more. Together, the changes cut aftermarket transportation cost by about 12 percent and should reduce dealer complaints about damage.

What this page is doingSummarizes the choices.
11

References

Caplice, C., & Sheffi, Y. (2003). Optimization-based procurement for transportation services. Journal of Business Logistics, 24(2), 109-128. https://doi.org/10.1002/j.2158-1592.2003.tb00048.x

Murphy, P. R., Daley, J. M., & Hall, P. K. (1997). Carrier selection: Do shippers and carriers agree, or not? Transportation Research Part E: Logistics and Transportation Review, 33(1), 67-72. https://doi.org/10.1016/S1366-5545(96)00003-8

Sheffi, Y. (2004). Combinatorial auctions in the procurement of transportation services. Interfaces, 34(4), 245-252. https://doi.org/10.1287/inte.1040.0075

What the QSO 450 Module 2 instructions ask for

The QSO 450 Module 2 assignment usually asks students to choose modes and carriers for a company's shipments. Expect to profile shipments by weight, dimensions, value, lanes and service needs, compare modes such as parcel, less-than-truckload, truckload and intermodal on cost and service, develop criteria for selecting carriers and weight them, and recommend a mode and carrier strategy with a procurement approach. Strong assignments segment shipments rather than treating them as one, account for dimensional weight, accessorial charges and damage in total cost, choose carriers on service as well as rate, keep the number of carriers manageable and explain how carriers will be measured after award.

How this QSO 450 Module 2 mode and carrier selection assignment example is built

The assignment chooses modes and carriers for Bristol Creek Coach Components' 61,000 aftermarket shipments a year. Bristol Creek, a fictional RV parts maker in Elkhart, Indiana, ships doors, windows and steps to 2,600 dealers. A boxed entry door weighs 68 pounds but bills at 174 by dimensional weight, so 9,800 door shipments cost about $58 each by parcel and arrive damaged 6.1 percent of the time. Palletized by less-than-truckload they cost about $52 and arrive damaged 1.8 percent of the time, saving about $188,000 a year. Windows and steps stay with parcel. A bid and a weighted scorecard cut 140 occasional LTL carriers to four, worth about $144,000 more. Murphy and colleagues, Caplice and Sheffi and Sheffi inform the method.

Where the QSO 450 Module 2 rubric puts the points

The QSO 450 mode and carrier selection assignment is commonly graded on a shipment profile segmented by weight, size, lane and service need, a mode comparison that includes dimensional weight, accessorials and damage, selection criteria with justified weights, a manageable carrier base, a clear procurement approach, performance measures after award and savings calculated with stated assumptions. The strongest assignments show that the cheapest rate is not always the cheapest choice. Credit drops when shipments are treated as one category, dimensional weight or damage is ignored, carriers are chosen by rate alone or the recommendation keeps dozens of carriers. Tables, clear writing and APA citations complete the grade.

QSO 450 Module 2 help: the mistakes that cost points

Start with the shipments themselves: sort them by weight, size, destination and how fast they must arrive. For each segment, compare modes on the full cost: rate, dimensional weight if the item is bulky, accessorial charges such as residential or liftgate delivery and the cost of damage. Choose the mode for each segment, not one mode for everything. Then choose carriers: write criteria such as on-time delivery, damage, cost, billing accuracy and coverage, weight them and score candidates, ideally through a bid. Keep the carrier base small enough to manage. Set measures for after the award. A common mistake is choosing by rate per pound; another is forgetting that a damaged shipment costs a second shipment and a customer's patience.

Get QSO 450 Module 2 written to your instructions

Share the QSO 450 Module 2 instructions and your shipment data or scenario. A writer profiles shipments by weight, size and lane, compares modes on rate, dimensional weight, accessorials and damage, designs a carrier scorecard with weights, plans the bid or procurement and calculates the savings, citing transportation research. Your first QSO 450 paper is free, sent within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 450 papers and related BS Operations Management samples

QSO 450 Module 2 questions, answered

Where can I find a free QSO 450 Module 2 Mode and Carrier Selection Assignment sample?

The complete QSO 450 Module 2 assignment is on this page: mode and carrier selection for an invented RV parts maker's aftermarket freight.

What is dimensional weight?

A billing weight based on a package's size rather than its actual weight, calculated by dividing its volume by a carrier's divisor, so large light items are charged as if heavier.

When should a shipper use LTL instead of parcel?

When shipments are heavy, bulky or fragile enough that palletized freight costs less in rate and damage than parcel, often above about 150 pounds or for oversized items.

What criteria are used to select carriers?

Typically on-time performance, damage and claims, cost, capacity and coverage, billing accuracy, communication and technology, weighted for the shipper's needs.

Why reduce the number of carriers?

A smaller carrier base gives the shipper more volume with each carrier, better rates and service, easier management and more consistent performance data.