QSO 450 Module 5 Routing Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 450 Module 5 Routing Assignment sample applies the savings method and vehicle routing principles to redesign delivery routes with truck capacity and time windows. SNHU QSO 450 (QSO-450) assigns routing in Module 5, the point where its BS Operations Management students move from choosing carriers to planning trucks. The routes are the daily milk runs from Bristol Creek Coach Components, an invented Elkhart, Indiana, maker of RV doors and windows, to 42 assembly plants. The paper works the method by hand on eight plants, scales the result to the whole network with a routing tool and turns fewer routes and fuller trucks into savings.

CourseQSO 450 Transportation Management
ModuleModule 5
Paper typeundergraduate assignment applying the savings method and vehicle routing principles to redesign delivery routes, with capacity and time windows
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 450 Module 5

1

One Hundred Forty-Seven Miles to 134: Rerouting Bristol Creek's Milk Runs With the Savings Method

[Student Name]

Southern New Hampshire University

QSO 450: Transportation Management

Routing Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe plants, distances, loads and results for Bristol Creek Coach Components in this QSO 450 assignment are invented.
2

One Hundred Forty-Seven Miles to 134: Rerouting Bristol Creek's Milk Runs With the Savings Method

Introduction

Every working day, Bristol Creek Coach Components sends doors, windows and steps from Elkhart to the RV assembly plants it supplies in northern Indiana and southern Michigan. Its 14 trucks repeat the same routes and departure times whatever the day's orders, run about 58 percent full and drive 41 percent of their miles empty. This assignment applies the Clarke and Wright savings method to redesign the routes, first by hand on eight plants to show how it works and then across all 42 with a routing tool, and compares the result with current routes.

What this page is doingDescribes the plant deliveries.
3

The Method

Clarke and Wright (1964) proposed a way to plan trips for a fleet that starts and ends at one depot and must serve a large number of customers. It starts by imagining that every stop has its own truck making an out-and-back trip. Joining two stops, i and j, on one trip saves the distance from the depot to i plus the distance from the depot to j, minus the distance between i and j. The method calculates that saving for every pair, sorts them from largest to smallest and joins stops into routes in that order, provided the combined load fits the truck and both stops are at the ends of their current routes. Laporte (1992) reviewed exact and approximate methods for the vehicle routing problem and noted that the savings method is still popular in practice for its simplicity and speed, though better heuristics exist for large or complex problems.

What this page is doingExplains the savings logic.
4

Worked Example

Eight plants in the Goshen and Middlebury area, A to H, are served from Elkhart by trucks with a capacity of 100 cube units, a measure of the space each day's parts take up. Their road distances from Elkhart and their daily loads are below.

Routes from the savings method

PlantMiles from ElkhartDaily load, cube units
A10.730
B15.725
C17.735
D16.220
E21.930
F14.625
G13.540
H10.130
RouteStopsLoadMiles
1Elkhart, A, B, C, Elkhart9040
2Elkhart, D, E, Elkhart5044
3Elkhart, F, G, H, Elkhart9549
Total235133

Serving each plant by its own round trip would take 241 miles. The current fixed routes use four trucks: A, D and E on one; B and C on a second; F and G on a third; and H alone on a fourth, for 147 miles.

The largest savings come from pairs that are far from Elkhart but close to each other. D and E save about 31.9 miles when joined, B and C about 27.1, B and E about 26.0 and A and B about 21.0. Working down the list, D and E join first, with a load of 50. B and C join next, with 60. B and E would save 26.0 miles, but joining the two routes would put 110 units on one truck, over capacity, so the pairing is skipped; the same happens for C and E. A then joins B at the front of B and C, giving a route of A, B and C with a load of 90. On the west side, F, G and H join into one route with a load of 95.

Three trucks cover 133 to 134 miles, against four trucks and 147 miles today. The improvement comes mainly from pairing plants by geography rather than by habit: today's first route sends one truck east to A and then north to D and E, while today's route for H uses a whole truck for 30 units.

What this page is doingApplies the method to eight plants.
5

Scaling to 42 Plants

The full network adds time windows: most plants want deliveries within a two-hour window, and some want two deliveries a day. A routing tool that starts from savings-method routes and then adjusts them to meet windows was run on four weeks of order data. The results are an average across those weeks.

Current and redesigned routes, all 42 plants

MeasureCurrentRedesigned
Daily routes1411
Daily milesAbout 1,690About 1,370
Average fill by cube58%About 76%
Plants served late in the test weeks3.9% of stops1.6% of stops, simulated

Daily miles fall by about 19 percent and three routes are eliminated. Late stops fall in the simulation because routes are built around windows rather than fixed sequences, though that figure must be confirmed in practice.

What this page is doingApplies the method across the network.
6

Dispatch Changes

Routes built from each day's orders are useless if trucks still leave at fixed times. Under the redesign, routes are rebuilt each afternoon from the next day's plant releases, departure times are set by the earliest window on each route and drivers receive their routes on a tablet. Two drivers are kept as floaters for second deliveries and absences, so no driver loses a job; the three trucks no longer needed are returned at the end of their leases.

Mason et al. (2007) describe how shippers can lower transport costs by coordinating with customers, for example on delivery timing. Bristol Creek will ask the six plants with the tightest windows whether a 30-minute widening would let it combine their deliveries, which the routing tool suggests would save one more route.

What this page is doingTurns routes into practice.
7

Limits of the Method

The savings method does not guarantee the best possible routes; it builds good ones quickly. It handles capacity naturally but time windows only through later adjustment. It assumes known demand, while plant releases change during the day. And it treats every mile as equal, though some roads are slower in winter. The routes will therefore be reviewed weekly against actual times and rebuilt when plants are added or close.

What this page is doingExplains what it does not do.
8

Savings

Eliminating three routes saves about three trucks' lease and maintenance costs and the fuel for about 320 fewer miles a day. After keeping two floater drivers, the annual saving is estimated at about $430,000, plus about half the $210,000 of fleet-related expedites if late stops fall as simulated.

What this page is doingValues the redesign.
9

Conclusion

The savings method, applied by hand to eight plants and by a routing tool to all 42, shows that Bristol Creek's trucks can cover the same plants with 11 routes instead of 14, about 19 percent fewer miles and fuller trucks, if routes are rebuilt from each day's orders rather than repeated from habit.

What this page is doingSummarizes the redesign.
10

References

Clarke, G., & Wright, J. W. (1964). Scheduling of vehicles from a central depot to a number of delivery points. Operations Research, 12(4), 568-581. https://doi.org/10.1287/opre.12.4.568

Laporte, G. (1992). The vehicle routing problem: An overview of exact and approximate algorithms. European Journal of Operational Research, 59(3), 345-358. https://doi.org/10.1016/0377-2217(92)90192-C

Mason, R., Lalwani, C., & Boughton, R. (2007). Combining vertical and horizontal collaboration for transport optimisation. Supply Chain Management: An International Journal, 12(3), 187-199. https://doi.org/10.1108/13598540710742509

What the QSO 450 Module 5 instructions ask for

The QSO 450 Module 5 assignment usually asks students to plan delivery or pickup routes, often using a heuristic such as the Clarke and Wright savings method, the nearest-neighbor method or a routing tool. Expect to set out the depot, stops, demands, vehicle capacity and distances; calculate savings or apply the chosen method step by step; build routes that respect capacity and, where relevant, time windows; compare the result with current routes on distance, vehicles and utilization; and explain the operational changes needed. Strong assignments show the calculations clearly, check every constraint, compare against a baseline, explain the limits of heuristics and connect the routes to real dispatch practice.

How this QSO 450 Module 5 routing assignment example is built

The assignment redesigns the milk runs from Bristol Creek Coach Components, a fictional RV parts maker in Elkhart, Indiana, to RV assembly plants. A worked example with eight plants and trucks holding 100 cube units shows the Clarke and Wright savings method merging stops in order of the distance each pairing saves, subject to capacity, and replacing four current routes of 147 miles with three routes of 134. Applied to all 42 plants with two-hour windows by a routing tool, the method cuts daily routes from 14 to 11 and daily miles from about 1,690 to about 1,370 and lifts average fill from 58 to about 76 percent. Clarke and Wright, Laporte and Mason, Lalwani and Boughton support the method.

Where the QSO 450 Module 5 rubric puts the points

The QSO 450 routing assignment is commonly graded on a complete statement of the routing problem, correct application of the method with calculations shown, routes that respect capacity and time windows, a comparison with current routes on distance, vehicles and utilization, explanation of how results scale, honest discussion of the method's limits and practical changes to dispatch. The strongest assignments show where the method's result needed adjustment and why. Credit drops when savings are miscalculated, capacity is violated, no baseline is given, time windows are ignored or the routes could not be dispatched in practice. Tables, clear writing and APA citations complete the grade.

QSO 450 Module 5 help: the mistakes that cost points

Start by listing the depot, each stop, its demand and any delivery window, and the vehicle's capacity. Build a distance table. For the savings method, assume first that each stop gets its own out-and-back trip, then calculate for every pair of stops the miles saved by visiting both on one trip: the distance from the depot to each, minus the distance between them. Sort the savings from largest to smallest and join stops into routes in that order, as long as capacity is not exceeded and the stops are at the ends of their routes. Compare the result with current routes. Then check time windows and adjust. A common mistake is joining stops in the middle of a route; another is ignoring capacity.

Get QSO 450 Module 5 written to your instructions

Share the QSO 450 Module 5 instructions and your stops, demands and distances. A writer applies the savings method or another routing approach step by step, respects vehicle capacity and time windows, compares new routes with current ones on miles, vehicles and fill and explains how results scale and where the method falls short, citing routing research. Your first QSO 450 routing paper is free, finished in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 450 papers and related BS Operations Management samples

QSO 450 Module 5 questions, answered

Where can I find a free QSO 450 Module 5 Routing Assignment sample?

The complete QSO 450 Module 5 assignment is on this page: the savings method applied to an invented RV parts maker's milk runs.

What is the Clarke and Wright savings method?

A routing heuristic that starts with separate trips to each stop and repeatedly combines the pair of stops whose joining saves the most distance, subject to vehicle capacity.

How are savings calculated in the savings method?

For stops i and j, the saving is the depot-to-i distance plus the depot-to-j distance minus the i-to-j distance, the miles avoided by serving both on one route.

What is the vehicle routing problem?

The problem of designing routes for a fleet of vehicles from a depot to serve a set of customers at minimum cost, subject to constraints such as capacity and time windows.

Why use heuristics for routing?

Because finding the provably best routes is computationally hard for realistic numbers of stops, heuristics such as the savings method find good routes quickly.