| Course | QSO 450 Transportation Management |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate project analyzing an organization's transportation operations by flow with costs, service measures, problems and quantified opportunities |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 450 Module 3
Five Flows, $9.6 Million and a Fleet That Runs 58 Percent Full: Transportation Analysis at Bristol Creek
[Student Name]
Southern New Hampshire University
QSO 450: Transportation Management
Project One: Transportation Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Five Flows, $9.6 Million and a Fleet That Runs 58 Percent Full: Transportation Analysis at Bristol Creek
Introduction
Bristol Creek Coach Components builds RV doors, windows and entry steps in Elkhart, Indiana, selling to the assembly plants that build the vehicles and to dealers who repair them. Freight cost the company about $9.6 million last year, and that spending has outpaced sales growth for three straight years. This project analyzes every transportation flow: volumes, modes, carriers and costs; cost and service measures; problems and their causes; and the opportunities that would do the most good.
Freight Flows
Transportation flows, last twelve months
| Flow | Volume | Mode and carriers | Cost |
|---|---|---|---|
| Inbound aluminum, glass and hardware | 1,850 truckloads equivalent | Truckload from Midwest mills; intermodal containers from Asia via Chicago | $2,400,000 |
| Outbound to 42 RV assembly plants | About 74,000 stops | Private fleet, 14 trucks and 17 drivers | $3,900,000 |
| Aftermarket to dealers, parcel | 47,000 shipments | Two parcel carriers | $1,100,000 |
| Aftermarket to dealers, LTL | 14,000 shipments | About 140 carriers | $1,600,000 |
| Expedites | 1,280 shipments | Hot-shot trucks and air | $600,000 |
| Total | $9,600,000 |
The plant deliveries are the core of the business, accounting for about four-fifths of Bristol Creek's sales. RV plants build to order and hold little inventory, so Bristol Creek delivers to most of them daily, often within a two-hour window.
Cost and Service by Flow
Measures by flow
| Flow | Cost per unit | Key service measure | Efficiency measure |
|---|---|---|---|
| Inbound | About $1,300 per load equivalent | 92% received on schedule | Container detention about $48,000 |
| Private fleet to plants | About $53 per stop | 96.1% on time to window | 58% of cube used; 41% empty miles |
| Parcel to dealers | About $23 per shipment | 97% on time | Doors damaged 6.1% |
| LTL to dealers | About $114 per shipment | 89% on time | No invoice audit |
| Expedites | About $470 per shipment | Used after 1,280 missed or short deliveries | 7% of total spend |
Freight cost at 6.8 percent of sales is high for a manufacturer delivering most of its product within 60 miles. A share closer to 5 percent would be more typical for a short-haul manufacturer with dense, repeated deliveries, which suggests the problem lies in how the freight is run rather than in where the customers are. McKinnon and Piecyk (2009) note that measuring road freight performance requires reliable data on loads, distances and vehicle use, which many companies lack; Bristol Creek's private-fleet measures had to be reconstructed from driver logs and the dispatch spreadsheet.
Private Fleet
The private fleet costs $3.9 million and runs 14 trucks on fixed daily routes that were last redrawn when the company served 33 plants, although the plants served, their order patterns and their locations have changed since. On a two-week sample, trucks left the plant about 58 percent full by cube on average, and 41 percent of miles were driven empty, mostly returning to Elkhart after the last stop. Drivers start at fixed times regardless of orders, so some trucks wait for parts while others leave half loaded.
Hubbard (2003) found that trucking firms that adopted on-board computers improved capacity utilization because dispatchers could see where trucks were and match loads to them better. Bristol Creek's dispatchers have neither real-time location nor a routing tool. They also cannot see, until a driver calls in, that a plant has changed its release for the afternoon, which is when most late deliveries begin. The fleet's on-time rate of 96.1 percent sounds good, and drivers are proud of it, but RV plants charge about $1,500 an hour if a missing part stops an assembly line, and 3.9 percent late on 74,000 stops is about 2,900 late deliveries a year. About 900 of them led to hot shots.
Inbound Freight
Inbound truckloads from Midwest mills are well run, with steady carriers, scheduled pickups and very few damage claims on the extrusions or glass. Intermodal containers from Asia arrive at a Chicago rail ramp, where Bristol Creek's drayage carrier picks them up. Because Bristol Creek's receiving dock does not schedule appointments, containers often sit beyond the free time and incur detention, about $48,000 last year. Mason et al. (2007) describe how shippers can combine vertical collaboration with suppliers and customers and horizontal collaboration with other shippers to fill trucks and reduce empty running; Bristol Creek's drayage trucks return to Chicago empty, as do several other Elkhart manufacturers' trucks on the same road.
Aftermarket Freight
The mode and carrier analysis found that doors shipped by parcel cost about $188,000 a year more, in freight and damage, than palletized LTL, and that consolidating 140 LTL carriers to four would save about $144,000. No one checks LTL invoices against quoted rates; a sample of 400 invoices found about 3.5 percent overbilling through wrong freight classes and accessorials, about $56,000 a year.
Opportunities
Opportunities ranked by annual value
| Opportunity | Cause addressed | Annual value |
|---|---|---|
| Re-route the private fleet with a routing tool and order-based departures | Fixed routes, low fill, empty miles | About $430,000 |
| Cut expedites by fixing late plant deliveries | Routing and dispatch | About $210,000 |
| Ship doors palletized by LTL | Wrong mode for oversized items | About $188,000 |
| Consolidate LTL carriers through a scored bid | Scattered spend | About $144,000 |
| Audit freight invoices | No audit | About $56,000 |
| Appointment scheduling for inbound containers | Detention at the ramp | About $36,000 |
| Shared backhaul with another Elkhart shipper | Empty drayage returns | Not yet estimated |
| Total quantified | About $1,064,000 |
The fleet routing estimate assumes that rerouting would raise fill from 58 to about 75 percent and allow the same stops with 11 trucks instead of 14, saving about $430,000 in drivers, fuel and lease costs. The expedite estimate assumes that routing and dispatch changes halve the 900 fleet-related hot shots and that late-delivery penalties fall accordingly.
Conclusion
The largest opportunities in Bristol Creek's freight are not in carrier rates but in how its own trucks are routed and dispatched, which drives both the private fleet's cost and most expedites. Together with the aftermarket changes, invoice audit and inbound scheduling, the opportunities add up to roughly $1.07 million annually, a little over a tenth of what Bristol Creek spends on freight. Project Two will turn them into a plan with owners and dates.
References
Hubbard, T. N. (2003). Information, decisions, and productivity: On-board computers and capacity utilization in trucking. American Economic Review, 93(4), 1328-1353. https://doi.org/10.1257/000282803769206322
Mason, R., Lalwani, C., & Boughton, R. (2007). Combining vertical and horizontal collaboration for transport optimisation. Supply Chain Management: An International Journal, 12(3), 187-199. https://doi.org/10.1108/13598540710742509
McKinnon, A. C., & Piecyk, M. I. (2009). Measurement of CO2 emissions from road freight transport: A review of UK experience. Energy Policy, 37(10), 3733-3742. https://doi.org/10.1016/j.enpol.2009.07.007
What the QSO 450 Module 3 instructions ask for
QSO 450 Project One usually asks students to analyze an organization's transportation operations. Expect to describe the company's supply chain and freight flows, report volumes, modes, carriers and costs for each, measure service and efficiency with indicators such as cost per unit, on-time delivery, damage, utilization and empty miles, compare them with targets or benchmarks, identify problems and their causes and recommend opportunities for improvement. Strong projects build the analysis from data by flow, calculate measures consistently, look for causes rather than symptoms, quantify the value of each opportunity, connect transportation performance to customer requirements and set up the plan to follow.
How this QSO 450 Module 3 project one example is built
The project analyzes all of Bristol Creek Coach Components' transportation. Bristol Creek, a fictional RV parts maker in Elkhart, Indiana, spends $9.6 million a year across five flows: inbound aluminum and glass by truckload and intermodal, $3.9 million of private-fleet milk runs to 42 RV plants, aftermarket parcel and LTL and $600,000 of expedites. The private fleet runs 58 percent full with 41 percent empty miles and is 96.1 percent on time to plants that charge $1,500 an hour when a line stops. Container detention at the Chicago ramp costs about $48,000, and no one audits freight bills. Seven opportunities worth about $1.07 million a year are ranked. McKinnon and Piecyk, Hubbard and Mason and colleagues inform the analysis.
Where the QSO 450 Module 3 rubric puts the points
Instructors grading QSO 450 Project One look first at a clear map of the company's freight flows, volumes, modes and costs by flow, consistently calculated cost and service measures, comparison with targets or benchmarks, problems traced to causes, opportunities quantified and ranked and a link to customer requirements. Projects that score highest show that the analysis would change what the company does first. Credit drops when transportation is treated as one total, measures are missing or inconsistent, problems are listed without causes, opportunities are not valued or the analysis ignores what customers require. Tables, clarity and APA citations count too.
QSO 450 Module 3 help: the mistakes that cost points
Start by drawing the freight flows: what comes in, what moves between sites and what goes out, by what mode and carrier. For each flow, gather a year of volume and cost and calculate cost per unit shipped. Add service and efficiency measures: on-time delivery, damage, how full vehicles are, empty miles and expediting. Compare each with a target or benchmark and with what customers require. For every gap, ask why, and trace it to a cause such as routing by habit, the wrong mode or missing data. Put a value on fixing each cause and rank them. A common mistake is a project full of descriptions with no numbers; another is listing problems without asking why they happen.
Get QSO 450 Module 3 written to your instructions
Upload the QSO 450 Project One guidelines and your company's freight data or case. A writer maps every transportation flow, calculates cost per unit and service measures, benchmarks them, identifies the causes of cost and service problems, quantifies and ranks opportunities and sets up the improvement plan, citing transportation research. Your first QSO 450 project is free, delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 450 papers and related BS Operations Management samples
- QSO 450 Module 1 Discussion: What Transportation Costs and Why It Matters
- QSO 450 Module 2 Mode and Carrier Selection Assignment: Doors, Windows and Steps to 2,600 Dealers
- QSO 450 Module 4 Discussion: Private Fleet or Dedicated Carriage?
- QSO 450 Module 5 Routing Assignment: Milk Runs to 42 RV Plants
- QSO 450 Module 6 Discussion: What a Transportation Management System Would Change
- QSO 450 Module 7 Project Two: The Transportation Improvement Plan
- QSO 450 Module 8 Discussion: Electric Trucks on the 60-Mile Routes
- BUS 225 Module 8 Discussion: What the First Project Taught Me
- QSO 330 Module 8 Discussion: Nearshoring Cabinet Boxes for Resilience
- INT 220 Module 7 Final Project: Where Harlan Should Grow Next
- OL 324 Module 7 Final Project: Quality Management Plan
QSO 450 Module 3 questions, answered
Where can I find a free QSO 450 Module 3 Project One sample?
This page holds the complete QSO 450 Project One: a flow-by-flow transportation analysis for an invented RV parts maker.
What is a milk run?
A delivery or pickup route in which one vehicle visits several locations in sequence on a regular schedule, often used to supply assembly plants frequently in small quantities.
What are empty miles?
Miles driven by a truck without freight, such as returning from a delivery, which add cost without moving goods.
What is detention in freight transportation?
A charge for holding a carrier's equipment, such as a container or trailer, beyond the free time allowed for loading or unloading.
What measures are used to evaluate transportation performance?
Cost per unit or per shipment, freight cost as a share of sales, on-time delivery, damage and claims, vehicle utilization, empty miles and expediting cost.