QSO 625 Module 6 Designed Experiment Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 625 Module 6 Designed Experiment Assignment sample plans and analyzes a two-level fractional factorial screening experiment with two responses and chooses settings that balance quality against productivity. SNHU QSO 625 (QSO-625) assigns designed experiments in Module 6 of its MS Operations Management Black Belt course. The process is order picking at Pellbrook Fulfillment, an invented warehouse with five promising changes and no time to test them one by one. The paper explains how sixteen runs can screen five factors without confusing their effects, reads which changes matter for errors and for speed and picks a combination that improves both.

CourseQSO 625 Six Sigma for Black Belt Certification
ModuleModule 6
Paper typegraduate assignment planning and analyzing a two-level fractional factorial screening experiment with two responses and choosing settings that balance quality and productivity
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 625 Module 6

1

Sixteen Shifts, Five Factors: Screening Pick-Process Changes at Pellbrook

[Student Name]

Southern New Hampshire University

QSO 625: Six Sigma for Black Belt Certification

Designed Experiment Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe experiment, results and settings at Pellbrook Fulfillment in this QSO 625 assignment are invented.
2

Sixteen Shifts, Five Factors: Screening Pick-Process Changes at Pellbrook

Introduction

The analysis in Module 5 pointed to several possible changes to Pellbrook Fulfillment's picking process: confirming each item by scanning it at the pick, separating look-alike items so they are not stored side by side, extending voice-directed picking, color-coding totes by client and changing the number of orders per picking cart. Testing each change separately would take weeks and would miss interactions. This assignment designs a fractional factorial experiment to screen all five at once, measuring both mis-picks and productivity.

What this page is doingStates the experiment's purpose.
3

Factors, Levels and Responses

Factors and levels

FactorLow levelHigh level
A: Scan to confirm each item at the pickOffOn
B: Look-alike items separated by at least one slotNoYes
C: Voice-directed pickingOffOn
D: Color-coded totes by clientNoYes
E: Orders per picking cart816

Two responses were measured for each run: mis-picks per 10,000 lines, detected by full scan verification at packing, and lines picked per picker-hour. Each run was one zone for one full shift, about 16,000 lines. Look-alike separation was set up the day before a run by moving items in the run's zone; the other factors were switched on scanners, headsets and cart configurations at the start of the shift.

What this page is doingDefines the experiment.
4

The Design

A full two-level factorial in five factors needs 32 runs. A half fraction needs 16. Defining the fifth factor as the product of the first four, E equals ABCD, gives a resolution V design, in which every main effect is confounded only with a four-factor interaction and every two-factor interaction only with a three-factor interaction. Since interactions among four or three of these factors are very unlikely to matter, the design can estimate all five main effects and all ten two-factor interactions clearly. The sixteen runs were spread over two comparable zones and eight shifts, with run order randomized and each zone carrying eight runs balanced across factor levels, so zone differences would not be mistaken for factor effects.

What this page is doingChooses the fraction and explains aliasing.
5

Running the Experiment

A designed experiment on a live warehouse floor needs care. Each run's settings were posted at the zone entrance, and a team member checked at the start and middle of every shift that scanners, headsets and cart setups matched the run sheet. Pickers were assigned to zones by the normal roster, not chosen for the experiment, so that skill levels were similar across runs. Two runs had to be repeated: one because a scanner software update failed overnight, and one because a client's delayed shipment changed the mix of items picked that day. Mis-picks were counted only at packing, by scan, so the measurement did not depend on which factors were set. The supervisors who ran the zones were told the purpose but not the predictions, to avoid steering the results.

What this page is doingDescribes the practical arrangements.
6

Results for Mis-Picks

Estimated effects on mis-picks per 10,000 lines, design average about 20

EffectEstimate
A: Scan to confirmAbout minus 16
B: Separate look-alikesAbout minus 6
AB interactionAbout plus 5
C: Voice-directed pickingAbout minus 3
E: Orders per cartAbout plus 2
D: Color-coded totesAbout 0
Other two-factor interactionsUnder 1.5 each

With one run per combination, there is no direct estimate of error. Daniel (1959) proposed plotting the absolute values of effects on a half-normal plot, where effects that are only noise fall along a straight line and real effects stand off it. Here A, B and AB stand clearly off the line. C and E lie near it, so their effects on errors cannot be distinguished from noise in this experiment. The expected noise was also checked from the count data: with about 32 mis-picks per run, random variation alone gives an effect standard error of about 1.8, which agrees with the plot.

The AB interaction means that separating look-alikes helps much more when items are not scanned: without scanning, separation cuts mis-picks by about 11 per 10,000; with scanning, by about 1. Scanning catches most look-alike errors on its own.

What this page is doingIdentifies the real effects.
7

Results for Productivity

Estimated effects on lines per picker-hour, design average about 112

EffectEstimate
A: Scan to confirmAbout minus 8
C: Voice-directed pickingAbout plus 10
E: 16 orders per cartAbout plus 8
B, D and all interactionsUnder 2 each

Scanning each item costs about 8 lines per hour, about 7 percent, because pickers stop to scan. Voice-directed picking, which tells pickers the next location and lets them confirm by speaking a check digit, adds about 10, and larger carts add about 8 by reducing walking per order.

What this page is doingAnalyzes the second response.
8

Choosing Settings

The settings chosen are A on, B on, C on, D off and E at 16 orders. Scanning provides most of the error reduction. Separating look-alikes adds little once scanning is in place, but it costs nothing in productivity and protects against scanner failures and skipped scans, so it is kept. Voice picking does not clearly reduce errors but more than offsets scanning's productivity cost. Larger carts add productivity with no clear effect on errors. Color-coded totes do nothing for either response and are dropped. Nair et al. (1992), discussing parameter design, emphasize choosing settings that make performance robust to noise; keeping look-alike separation alongside scanning is a choice of that kind. The fitted models predict about 11 mis-picks per 10,000 lines, down from about 20, and about 117 lines per picker-hour, up from about 112.

What this page is doingBalances the two responses.
9

Confirmation

Four confirmation shifts at the chosen settings in two zones gave an average of about 10.4 mis-picks per 10,000 lines and about 116 lines per picker-hour, in line with the predictions. Montgomery and Woodall (2008) stress that Six Sigma improvements must be confirmed with data before adoption, and these results support rolling the settings out to all six zones, which requires scanners for every picker and voice headsets for the four zones that lack them.

What this page is doingPlans the check.
10

Conclusion

A sixteen-run resolution V half fraction screened five picking changes, estimating every main effect and two-factor interaction cleanly on two responses. Scanning at the pick and separating look-alikes reduce mis-picks, with an interaction showing that scanning makes separation less necessary; voice picking and larger carts raise productivity. The chosen combination roughly halves mis-picks while slightly increasing lines per hour, and confirmation runs agreed with the predictions.

What this page is doingSummarizes the experiment.
11

References

Daniel, C. (1959). Use of half-normal plots in interpreting factorial two-level experiments. Technometrics, 1(4), 311-341. https://doi.org/10.1080/00401706.1959.10489866

Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329-346. https://doi.org/10.1111/j.1751-5823.2008.00061.x

Nair, V. N., Abraham, B., MacKay, J., Box, G., Kacker, R. N., Lorenzen, T. J., Lucas, J. M., Myers, R. H., & Vining, G. G. (1992). Taguchi's parameter design: A panel discussion. Technometrics, 34(2), 127-161. https://doi.org/10.1080/00401706.1992.10484904

What the QSO 625 Module 6 instructions ask for

The QSO 625 Module 6 assignment usually asks students to design and analyze an experiment at a level beyond the basic full factorial. Expect to choose factors and levels, select a design such as a fractional factorial for screening, explain its resolution and which effects are aliased, randomize the runs, analyze main effects and interactions, identify significant factors and recommend settings, sometimes for more than one response. Strong assignments justify the fraction and resolution, check that the effects of interest are not aliased with each other, account for nuisance variation such as zones or days, use half-normal plots or replicate-based error to decide which effects are real, interpret interactions in operational terms, weigh trade-offs between responses and plan confirmation runs.

How this QSO 625 Module 6 designed experiment assignment example is built

The assignment screens five changes to picking at Pellbrook Fulfillment, a fictional Louisville warehouse, in a sixteen-run half fraction of a two-level design, each run one zone for one shift: scanning each item at the pick, moving look-alike items apart, voice-directed picking, color-coded totes and carts of 16 orders instead of 8. At resolution V, main effects and two-factor interactions are estimated clear of each other. On mis-picks per 10,000 lines, averaging about 20, scanning has an effect of about minus 16, separating look-alikes about minus 6 and their interaction about plus 5, while voice picking and totes show no clear effect. On lines per picker-hour, scanning costs about 8, voice adds about 10 and larger carts about 8. The analysis follows Daniel on half-normal plots, with Nair and colleagues and Montgomery and Woodall as further sources.

Where the QSO 625 Module 6 rubric puts the points

The QSO 625 designed experiment assignment is commonly graded on factors and levels drawn from the analysis, a justified fractional design and resolution, a clear statement of aliasing, sound randomization and handling of nuisance variation, correct effect estimates, an objective method for judging which effects are real, interpretation of interactions, a balance of competing responses, recommended settings and a confirmation plan. The strongest papers show how a well-chosen fraction answers the question with half the runs. Credit drops when aliasing is ignored, factors are tested one at a time, all estimated effects are treated as real, only one response is analyzed when trade-offs matter or settings are adopted without confirmation. Tables, clear writing and APA citations complete the grade.

QSO 625 Module 6 help: the mistakes that cost points

List the factors the analysis suggested and set two practical levels for each. With five factors, a full factorial needs 32 runs; a half fraction needs 16 and, if built with the right generator, still separates every main effect and two-factor interaction from one another, which is called resolution V. Write down which effects are aliased with which. Randomize run order, and if runs differ in nuisance ways, such as zone or day, balance or block them. Measure every response that matters, here errors and productivity. Estimate each effect, then use a half-normal plot or an error estimate to separate real effects from noise. Interpret interactions in plain terms. Choose settings that serve both responses and confirm them. Papers often analyze the error rate alone and recommend a change that quietly cuts productivity.

Get QSO 625 Module 6 written to your instructions

Share the QSO 625 Module 6 instructions and the factors you want to screen. A writer chooses a fractional factorial design and its resolution, explains the aliasing it accepts, plans randomization and blocking, analyzes effects on each response with half-normal plots and error estimates, interprets interactions, balances competing responses and recommends settings with confirmation, citing experimental design research. Your first QSO 625 paper is free, ready in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 625 papers and related MS Operations Management samples

QSO 625 Module 6 questions, answered

Where can I find a free QSO 625 Module 6 Designed Experiment Assignment sample?

The complete QSO 625 Module 6 assignment is on this page: a 16-run fractional factorial screening picking changes at an invented fulfillment center.

What is a fractional factorial design?

A designed experiment that runs a chosen fraction of all factor combinations, saving runs at the cost of confounding some higher-order effects.

What does resolution mean in a fractional factorial?

A measure of which effects are confounded; at resolution V, main effects and two-factor interactions are confounded only with higher-order interactions.

What is a half-normal plot?

A plot of the absolute values of estimated effects against expected values for noise, on which real effects stand out from the line formed by unimportant ones.

Why analyze more than one response in an experiment?

Because a change that improves one result, such as error rate, can worsen another, such as productivity, and the best settings must balance them.