QSO 625 Module 8 Reliability Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 625 Module 8 Reliability Assignment sample fits Weibull models to equipment failure data, reads what the shape parameter says about how parts fail and chooses a maintenance policy by expected cost. SNHU QSO 625 (QSO-625) covers reliability in Module 8 of its MS Operations Management Black Belt course. The equipment is the induction units that feed the parcel sorter at Pellbrook Fulfillment, an invented warehouse where every stop risks a missed truck. The paper shows that belts and motors fail in opposite ways, that one long-standing maintenance rule makes things worse and what schedule would cut stops and cost.

CourseQSO 625 Six Sigma for Black Belt Certification
ModuleModule 8
Paper typegraduate assignment fitting Weibull models to equipment failure data, interpreting the shape parameter and choosing a maintenance policy by expected cost
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 625 Module 8

1

Belts Wear Out, Motors Fail Young: A Reliability Study of Pellbrook's Sorter

[Student Name]

Southern New Hampshire University

QSO 625: Six Sigma for Black Belt Certification

Reliability Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe failure data, models and policies at Pellbrook Fulfillment in this QSO 625 assignment are invented.
2

Belts Wear Out, Motors Fail Young: A Reliability Study of Pellbrook's Sorter

Introduction

Pellbrook Fulfillment's parcel sorter receives packed cartons from 64 induction units, short powered belt sections that space and scan each carton before it joins the sorter loop. When an induction unit fails, its lane stops until a technician repairs it, about 22 minutes on average. In the evening, a stop often means cartons miss the last carrier pickup. The maintenance team runs belts until they fail and replaces drive motors every 6,000 operating hours, a rule inherited from the equipment manual. This assignment analyzes eighteen months of failure records, fits life distributions to each failure mode and compares maintenance policies by expected cost.

What this page is doingStates the reliability problem.
3

Defining Failures and Costs

A failure is any event that stops an induction unit and requires a technician. The maintenance log for the past eighteen months records about 230 such events on drive belts, motors and photo-eye sensors. Sensor failures, about 10, were caused by impacts from cartons and are left for a guarding project. That leaves about 220 belt failures and 21 motor failures. Each failure costs about $1,900 in idle packing and sorting labor, overtime and contract penalties for missed cutoffs, according to the finance team's estimate from logged stops, plus the part. A belt costs about $240 and can be replaced in a scheduled window before shifts at no stop cost.

What this page is doingSets up the analysis.
4

Life Data

For each belt and motor, the operating hours from installation to failure were taken from the sorter's run-time counters. Belts and motors still running at the end of the period were included as censored observations, since their lives are known to be at least as long as their current hours; leaving them out would make parts look shorter-lived than they are.

What this page is doingPrepares the observations.
5

Belt Life

Weibull (1951) proposed a distribution flexible enough to describe many kinds of life data, with a shape parameter that sets how the failure rate changes with age and a scale parameter that sets the typical life. A Weibull fit to belt life gives a shape of about 2.6 and a scale of about 2,900 operating hours, with a probability plot that follows a straight line closely.

Belt reliability by operating hours

Operating hoursShare of belts still running
1,000About 94%
1,500About 84%
2,000About 68%
2,500About 51%
3,000About 34%

A shape well above one means the failure rate rises with age: belts wear out. Their mean life is about 2,600 hours, but failures spread from a few hundred hours to more than 4,000.

What this page is doingFits a wear-out pattern.
6

Motor Life

The 21 motor failures tell a different story. A Weibull fit gives a shape of about 0.8 and a scale of about 9,000 hours. A shape below one means the failure rate falls with age: motors are most likely to fail soon after they go into service. The records confirm it. Fourteen of the 21 failures occurred within 1,500 hours of a motor being installed, and most of those motors had just been rebuilt by an outside shop under the 6,000-hour replacement rule.

What this page is doingFinds an early-failure pattern.
7

Comparing Belt Policies

Dekker (1996) reviewed maintenance optimization models and noted that age-based replacement pays only when failures follow a wear-out pattern and unplanned failure costs much more than planned replacement, both true for belts. The expected cost per operating hour under age replacement at age T is the expected cost of a cycle, a planned replacement if the belt survives to T and a failure plus replacement if it does not, divided by the expected length of a cycle.

Expected belt cost per 1,000 induction-hours

PolicyExpected costPlanned replacements per failure
Run to failureAbout $830None
Replace at 2,000 hoursAbout $465About 2
Replace at 1,500 hoursAbout $385About 5
Replace at 1,200 hoursAbout $360About 9
Replace at 1,000 hoursAbout $360About 15

The cost curve is flat between about 1,000 and 1,300 hours, so small errors in the cost estimates would not move the best interval much. Replacing belts at 1,200 hours, about every ten weeks at current run time, keeps most of the saving with fewer planned changes. With 64 units running about 6,000 hours a year, the change cuts expected belt cost from about $320,000 to about $140,000 a year and avoids about 115 unplanned stops.

What this page is doingCalculates expected cost.
8

Motor Policy

For a part with a falling failure rate, replacing it on a schedule removes a seasoned motor and installs a new one at the start of its riskiest period. The 6,000-hour replacement rule is therefore adding failures rather than preventing them. The recommendation is to end age-based motor replacement, require the rebuild shop to run each motor for 48 hours on a test stand before return and track failures by rebuild batch. Jardine et al. (2006) review condition-based maintenance, in which measurements such as vibration and temperature trigger maintenance when they indicate developing faults; adding vibration sensors to the 64 motors, about $19,000, would allow motors to be replaced when their condition warrants rather than by age.

What this page is doingStops a harmful rule.
9

Assumptions

The analysis assumes that operating hours, not calendar time, drive wear, that each belt failure costs about the same and that scheduled replacements cause no stops. In November and December, when the sorter runs about 40 percent more hours, belts will reach 1,200 hours sooner, so the interval should be set in hours, not weeks. The motor sample is small; the 0.8 shape estimate has a wide interval, but the concentration of failures after rebuilds is clear in the records. The analysis will be repeated after another year of data, by which time the belt policy will also have been running long enough to check that failures fell as predicted.

What this page is doingStates what the analysis depends on.
10

Conclusion

Belts on Pellbrook's sorter inductions wear out, with a Weibull shape near 2.6, and replacing them every 1,200 operating hours would save about $180,000 a year and prevent about 115 lane stops. Motors fail young, with a shape near 0.8, so the rule replacing them every 6,000 hours should end in favor of tested rebuilds and vibration monitoring. The same data called for opposite policies for two parts of one machine.

What this page is doingSummarizes the recommendations.
11

References

Dekker, R. (1996). Applications of maintenance optimization models: A review and analysis. Reliability Engineering & System Safety, 51(3), 229-240. https://doi.org/10.1016/0951-8320(95)00076-3

Jardine, A. K. S., Lin, D., & Banjevic, D. (2006). A review on machinery diagnostics and prognostics implementing condition-based maintenance. Mechanical Systems and Signal Processing, 20(7), 1483-1510. https://doi.org/10.1016/j.ymssp.2005.09.012

Weibull, W. (1951). A statistical distribution function of wide applicability. Journal of Applied Mechanics, 18(3), 293-297. https://doi.org/10.1115/1.4010337

What the QSO 625 Module 8 instructions ask for

The QSO 625 Module 8 assignment usually asks students to apply reliability concepts to a product or process. Expect to define failure, collect time-to-failure data, fit a life distribution such as the exponential or Weibull, estimate measures such as reliability at a given time and mean time to failure, interpret the failure pattern and recommend actions such as maintenance intervals or design changes. Strong assignments separate failure modes before fitting, handle units that have not yet failed as censored observations, interpret the Weibull shape as early-life, random or wear-out failure, compare maintenance policies by expected cost rather than by intuition, recognize when age-based replacement cannot help, consider condition monitoring and state the assumptions behind each recommendation.

How this QSO 625 Module 8 reliability assignment example is built

The assignment studies failures on the 64 induction units that feed the sorter at Pellbrook Fulfillment, a fictional Louisville warehouse, where each failure stops a lane for about 22 minutes and costs about $1,900 plus a $240 part. Eighteen months of records give about 220 belt failures and 21 motor failures. Belt life fits a Weibull shape near 2.6 and a scale near 2,900 operating hours, a wear-out pattern, so replacing belts every 1,200 hours instead of running them to failure cuts expected cost from about $830 to about $360 per 1,000 induction-hours, about $180,000 a year. Motor life gives a shape near 0.8, failures concentrated soon after rebuilds, so the 6,000-hour motor replacement rule adds risk. Weibull, Dekker and Jardine and colleagues inform it.

Where the QSO 625 Module 8 rubric puts the points

Graders of the QSO 625 reliability assignment look for a clear definition of failure, life data prepared by failure mode with censored units handled correctly, appropriate distributions fitted and checked, correct interpretation of shape and scale, reliability and mean life estimated, maintenance policies compared by expected cost, recognition of when age-based replacement helps and when it harms, consideration of condition monitoring and recommendations with stated assumptions. The strongest papers show that one failure mode needs the opposite policy from another. Credit drops when failure modes are mixed, unfailed units are ignored, the exponential model is assumed without checking, intervals are chosen by intuition or preventive replacement is recommended for early-life failures. Tables, clear writing and APA citations complete the grade.

QSO 625 Module 8 help: the mistakes that cost points

Start by defining a failure and separating the ways the equipment fails, since each mode may follow its own pattern. For each mode, record the operating time from installation or repair to failure, and for units still running, the time so far, which counts as a censored observation. Fit a Weibull distribution and read its shape: below one means failures are most likely early, near one means they occur at random and above one means wear-out. Only wear-out failures can be reduced by replacing parts before they fail. For those, compare the expected cost per operating hour of running to failure with replacement at several ages and choose the cheapest. For early failures, look at installation and repair quality instead. Papers often recommend regular replacement for every part, which helps only when parts wear out.

Get QSO 625 Module 8 written to your instructions

Share the QSO 625 Module 8 instructions and your failure records. A writer prepares life data with censored units, fits Weibull or other life distributions, interprets shape and scale for each failure mode, compares run-to-failure, age-based and condition-based policies by expected cost, recommends intervals and actions and states the assumptions, citing reliability and maintenance research. Your first QSO 625 paper is free, returned within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 625 papers and related MS Operations Management samples

QSO 625 Module 8 questions, answered

Where can I find a free QSO 625 Module 8 Reliability Assignment sample?

The complete QSO 625 Module 8 assignment is on this page: Weibull analysis of sorter failures at an invented fulfillment center.

What is the Weibull distribution?

A flexible life distribution whose shape parameter describes whether failures tend to occur early, at random or through wear-out, and whose scale sets the typical life.

What does a Weibull shape below one mean?

That the failure rate falls with age, so failures cluster early in life, often from manufacturing, installation or repair defects.

When does age-based preventive replacement make sense?

When failures come from wear-out, shown by a shape above one, and an unplanned failure costs much more than a planned replacement.

What is a censored observation in reliability data?

A unit that has not yet failed when the data are collected, whose run time shows only that its life is at least that long.