QSO 625 Module 3 Attribute Agreement Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 625 Module 3 Attribute Agreement Assignment sample validates a pass-fail inspection with an attribute agreement study, measures agreement with kappa statistics and redesigns the check. SNHU QSO 625 (QSO-625) assigns measurement of attribute data in Module 3 of its MS Operations Management Black Belt course. The inspection is the pack-out audit at Pellbrook Fulfillment, an invented warehouse whose auditors decide by eye whether an order holds the right items. The paper shows how often the auditors agreed with each other, with themselves and with the truth, why they missed what they missed and how the redesigned check performed.

CourseQSO 625 Six Sigma for Black Belt Certification
ModuleModule 3
Paper typegraduate assignment validating a pass-fail inspection with an attribute agreement study, measuring agreement with kappa statistics and redesigning the check
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 625 Module 3

1

Navy, Black and a Kappa of 0.58: Testing Pellbrook's Pack-Out Audit

[Student Name]

Southern New Hampshire University

QSO 625: Six Sigma for Black Belt Certification

Attribute Agreement Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe study, auditors and results at Pellbrook Fulfillment in this QSO 625 assignment are invented.
2

Navy, Black and a Kappa of 0.58: Testing Pellbrook's Pack-Out Audit

Introduction

Pellbrook Fulfillment's mis-ship project needs a reliable count of wrong items. Two sources exist: client returns coded as "wrong item received," which depend on customers reporting, and the pack-out audit, in which four auditors open about 600 sampled orders a day and judge whether each is correct. Before the audit can be used to measure the problem or to judge improvements, the team needs to know whether the auditors agree with each other, with themselves and with the truth. This assignment designs and analyzes an attribute agreement study, finds the causes of disagreement, redesigns the check and repeats the study.

What this page is doingStates the measurement question.
3

Study Design

Fifty orders were assembled from real client items. Twenty-five were correct. Twenty-five contained one known error each, chosen to reflect the errors in the returns data: nine wrong sizes, eight wrong colors, four wrong products of similar appearance, two missing items and two extra items. Many were deliberately hard: navy shirts in place of black, medium in place of large, a 12-ounce bottle in place of a 16-ounce bottle of the same lotion. The true status of each order was recorded by the inventory control analyst.

Each of the four auditors judged all 50 orders twice, a week apart, in a random order, at their normal audit stations and lighting. Orders carried a study number unrelated to the order number, so auditors could not recognize them, and the auditors did not know which orders were correct.

What this page is doingBuilds the test set.
4

Agreement Within Auditors

Each auditor's agreement with their own earlier judgment and with the standard

AuditorAgreed with selfAgreed with the standard, both trials
A92%80%
B86%72%
C78%62%
D88%70%

Even the most consistent auditor changed their judgment on about one order in twelve between trials, and the least consistent on more than one in five.

What this page is doingMeasures consistency.
5

Agreement Between Auditors

Raw agreement overstates reliability, because two auditors guessing at random on a 50-50 test would agree half the time. Cohen (1960) introduced the kappa coefficient, which measures agreement beyond what chance would produce, and Fleiss (1971) extended it to more than two raters. Across all four auditors and both trials, Fleiss kappa was about 0.58. Landis and Koch (1977) proposed benchmarks in which values from 0.41 to 0.60 indicate moderate agreement and values above 0.80 almost perfect agreement; most quality practitioners require at least 0.75 for an inspection to be trusted. The audit falls well short. Against the known standard, the four auditors together were correct on about 71 percent of their judgments.

What this page is doingUses kappa.
6

What the Auditors Missed

Errors missed by error type, all auditors and trials

Error typeOrders with this errorShare of judgments that missed it
Wrong color, dark shades658%
Wrong size, adjacent sizes941%
Similar product, different size or variant438%
Wrong color, distinct shades26%
Missing or extra item43%

Missing and extra items were almost always caught, and obvious color mistakes rarely missed. Subtle errors were missed often. Watching the auditors work showed why: they compared items with the packing slip by eye, size tags are small and often folded inside garments, and the audit stations sit under a mezzanine where light is about half the level at the packing tables. Navy and black are hard to tell apart there. The auditors also flagged some correct orders as wrong, mostly when a client's product photo on the slip did not match the current color name.

What this page is doingTraces the disagreements.
7

Redesigning the Check

Three changes were made. First, scan verification: auditors now scan each item's barcode, and the screen compares it with the order, so size, color and variant are checked by data rather than by eye. Second, photo standards: for the 300 look-alike items identified from the returns data, the screen shows a current photo with the color and size highlighted. Third, task lighting at each station was raised to the packing-table level. The auditors helped design the screen layout.

What this page is doingChanges the method and environment.
8

Repeat Study

The same design was repeated with a new set of 50 orders of similar difficulty.

Agreement before and after the redesign

MeasureBeforeAfter
Agreement within auditors, average86%98%
Fleiss kappa between auditorsAbout 0.58About 0.86
Agreement with the standardAbout 71%About 95%

Kappa of about 0.86 is in the almost perfect range on the Landis and Koch benchmarks. The remaining disagreements involved two items whose barcodes were mislabeled by the client, a data problem now reported to clients.

What this page is doingTests the redesigned check.
9

Ongoing Checks

A measurement system that passes one study can drift. The scanners can be misconfigured after a software update, photo standards fall behind when clients change their product lines and new auditors join with less experience. Three checks were added. Each week, the inventory control analyst slips five seeded orders with known errors into the audit stream without telling the auditors, and any seeded error missed is reviewed the same day. Each month, the photo standards are compared with the clients' current catalogs. And the full agreement study will be repeated every six months, and whenever a new auditor is trained, so that the kappa figure on which the project's numbers rest is kept current.

What this page is doingKeeps the audit honest.
10

What This Means for the Baseline

The old audit missed about 29 percent of erroneous orders in the study, mostly subtle ones, so it had been undercounting errors. Client returns data are not a full count either, since many customers keep a wrong item or never report it. The baseline mis-ship rate must therefore be measured again with the redesigned audit, which is expected to show a rate somewhat higher than the 41 per 10,000 in the charter. The charter's goal will be restated against the new baseline, with the champion's and finance's agreement.

What this page is doingRevisits the defect count.
11

Conclusion

An attribute agreement study showed that Pellbrook's pack-out auditors agreed only moderately with each other, kappa about 0.58, and correctly judged about 71 percent of orders, missing subtle size and color swaps under poor light. Scan verification, photo standards for look-alike items and better lighting raised kappa to about 0.86 and accuracy to about 95 percent. The redesigned audit will now be used to measure the true baseline before the analysis begins.

What this page is doingSummarizes the study.
12

References

Cohen, J. (1960). A coefficient of agreement for nominal scales. Educational and Psychological Measurement, 20(1), 37-46. https://doi.org/10.1177/001316446002000104

Fleiss, J. L. (1971). Measuring nominal scale agreement among many raters. Psychological Bulletin, 76(5), 378-382. https://doi.org/10.1037/h0031619

Landis, J. R., & Koch, G. G. (1977). The measurement of observer agreement for categorical data. Biometrics, 33(1), 159-174. https://doi.org/10.2307/2529310

What the QSO 625 Module 3 instructions ask for

The QSO 625 Module 3 assignment usually asks students to analyze a measurement system for attribute data, such as pass-fail or defect-type judgments. Expect to design a study in which several appraisers judge the same items more than once without knowing which items they are judging, include items whose true status is known, calculate agreement within appraisers, between appraisers and with the standard, use kappa statistics to account for chance agreement and decide whether the system is adequate. Strong assignments choose items that include borderline cases, randomize and blind the trials, report both percentages and kappa, examine which items and which appraisers cause disagreement, connect the findings to how defects have been counted and test the improved system again.

How this QSO 625 Module 3 attribute agreement assignment example is built

The assignment tests the pack-out audit at Pellbrook Fulfillment, a fictional Louisville warehouse, where four auditors judge whether a sampled order is correct. Fifty orders, 25 correct and 25 with known errors, many subtle size or color swaps, are each judged twice by each auditor in random order. Auditors agree with themselves on 78 to 92 percent of orders, with one another at a Fleiss kappa of about 0.58, moderate by common benchmarks, and with the known answer on about 71 percent, missing mostly navy-for-black and medium-for-large swaps under poor light. After barcode scan verification, photo standards and brighter lighting, a repeat study gives a kappa of about 0.86 and about 95 percent agreement with the standard. Cohen, Fleiss and Landis and Koch inform the analysis.

Where the QSO 625 Module 3 rubric puts the points

The QSO 625 attribute agreement assignment typically rewards a study design with known standards, borderline items, multiple appraisers and blind repeat trials, correct calculation of within-appraiser, between-appraiser and standard agreement, appropriate use and interpretation of kappa, analysis of which items and appraisers drive disagreement, causes traced in the work environment, a redesigned check and a repeat study, and a clear statement of what the findings mean for defect counts. The strongest papers show that the inspection had been undercounting defects. Credit drops when items are all easy, appraisers know which item they are judging, only raw percentages are reported, kappa is misread or no improvement is tested. Tables, clear writing and APA citations complete the grade.

QSO 625 Module 3 help: the mistakes that cost points

Pick about 30 to 50 items, roughly half good and half bad, including the hard cases that cause real disagreements, and settle the true status of each with an expert or a definitive test. Have each appraiser judge every item at least twice, in random order and without labels that reveal which item it is. Calculate how often each appraiser agrees with their own earlier judgment, how often appraisers agree with each other and how often they agree with the true answer, and use kappa to remove the agreement chance alone would produce. Look at which items were missed and why, for example lighting or look-alike products. Change the check and repeat the study. Papers often use only obvious defects, which makes any inspection look reliable.

Get QSO 625 Module 3 written to your instructions

Share the QSO 625 Module 3 instructions and describe the inspection you need to test. A writer designs an attribute agreement study with known standards, blind repeat trials and multiple appraisers, calculates agreement within and between appraisers and against the standard with kappa statistics, interprets the results, traces disagreements to causes, redesigns the check and repeats the study, citing measurement research. Your first QSO 625 paper is free, delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 625 papers and related MS Operations Management samples

QSO 625 Module 3 questions, answered

Where can I find a free QSO 625 Module 3 Attribute Agreement Assignment sample?

The complete QSO 625 Module 3 assignment is on this page: testing a pass-fail order audit at an invented fulfillment center.

What is an attribute agreement study?

A study in which several appraisers judge the same items more than once, used to test how consistent and accurate pass-fail or category judgments are.

What does kappa measure?

Agreement between judgments beyond what would be expected by chance, from 0 for chance-level agreement to 1 for perfect agreement.

Why include borderline items in an agreement study?

Because real disagreements happen on hard cases, and a study of easy items would overstate how well the inspection works.

Why repeat the study after changes?

To confirm that the redesigned inspection actually agrees better with itself and with the truth before its results are used to count defects.