QSO 680 Module 7 Discussion Example

Reviewed by Portia Lambrick, MBA

This QSO 680 Module 7 Discussion sample examines a conflict over one scarce expert shared by several projects, explains why such conflicts recur wherever many projects run at once and proposes program-level rules to resolve them. SNHU QSO 680 (QSO-680) covers multi-project management in its MS Project Management seminar. The organization is Coral Lantern Cruises, an invented Miami line running a fleet program of three dry docks, where in a single week three projects needed the company's only propulsion superintendent. The writer describes the late-night phone calls that followed and the rules the program board adopted so that the next conflict is settled before it starts.

CourseQSO 680 Seminar in Project Management
ModuleModule 7
Paper typegraduate discussion post examining a conflict over a scarce expert shared by several projects, explaining why such conflicts recur in multi-project settings and proposing program-level rules to resolve them
LengthAbout 380 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Project Management
UpdatedOctober 2026

Free sample paper for QSO 680 Module 7

1

Module Seven Discussion

One Pod Expert, Three Ships, One Week

Coral Lantern has one propulsion superintendent, a marine engineer with twenty years on the pod system our ships use. In the week the Meridian Isle entered dry dock, three projects needed that person at once. The Meridian Isle's project manager needed the superintendent on board to approve each step of the pod overhaul, which sits near the critical chain. The Palmetto Star's project manager needed technical review of three shipyard bids due that Friday for the October dry dock. And the Corsair Bay, carrying guests in the Caribbean, reported vibration in its starboard pod. Each project manager was right about their own need, and by Tuesday night the vice president of marine operations was taking calls from all three.

What this page is doingWhat happened.
2

Payne (1995) estimated that up to 90 percent of projects, by value, are carried out alongside other projects, sharing resources, and that the hard problems come from the interfaces between them. Engwall and Jerbrant (2003) studied two multi-project organizations and described a resource allocation syndrome, in which managers spend much of their time renegotiating who gets which people, and traced it to how projects are planned and prioritized rather than to individuals. Laslo and Goldberg (2008) modeled how project and functional managers in a matrix pursue different allocation goals under uncertainty and found that conflict is largely built into the structure. That fits us: each dry dock was planned as if the superintendent belonged to it alone.

What this page is doingWhy it keeps happening.
3

This time, the vice president sent the superintendent to the Corsair Bay by video link first, since a fault on a ship with guests aboard is a safety matter, then to the Meridian Isle, with the Palmetto Star's bid review moved to day 11 of the dry dock. More important, the program board adopted three rules. Safety on a ship in service comes first, then work inside a dry-dock window, then planning for future dry docks. The superintendent's time is now booked through the program manager, not requested separately by each project. And a second engineer is shadowing the superintendent through the Meridian Isle's overhaul so that by the Corsair Bay's dry dock there will be two people who can sign off pod work.

What this page is doingWhat we decided.
4

Does your organization settle these conflicts by rule or by whoever calls the boss first?

What this page is doingFor classmates.
5

References

Engwall, M., & Jerbrant, A. (2003). The resource allocation syndrome: The prime challenge of multi-project management? International Journal of Project Management, 21(6), 403-409. https://doi.org/10.1016/S0263-7863(02)00113-8

Laslo, Z., & Goldberg, A. I. (2008). Resource allocation under uncertainty in a multi-project matrix environment: Is organizational conflict inevitable? International Journal of Project Management, 26(8), 773-788. https://doi.org/10.1016/j.ijproman.2007.10.003

Payne, J. H. (1995). Management of multiple simultaneous projects: A state-of-the-art review. International Journal of Project Management, 13(3), 163-168. https://doi.org/10.1016/0263-7863(94)00019-9

What the QSO 680 Module 7 instructions ask for

The seventh QSO 680 discussion generally asks students to examine managing multiple projects, often through resource conflicts, prioritization or the role of programs and portfolios. Expect to describe a situation in which projects compete for people, equipment or money, explain why the conflict arose and recommend how it should be resolved. Good posts recognize that such conflicts are built into multi-project organizations rather than caused by difficult individuals, separate the immediate decision from the rules that would prevent the next one, and propose practices such as agreed priority criteria, central booking of scarce experts and developing backups. They also acknowledge what each project manager reasonably wanted. Replies should test whether a classmate's rule would hold when two high-priority projects collide.

How this QSO 680 Module 7 discussion example is built

The post describes a resource conflict in Coral Lantern Cruises' fleet program, a fictional Miami line's three dry docks. In the week the Meridian Isle enters dry dock, the company's only propulsion superintendent is needed for its pod overhaul, for the Palmetto Star's shipyard bid evaluation due the same week and on the Corsair Bay, in service, where a pod is vibrating. Each project manager's claim was reasonable, and the dispute reached the vice president by phone at night. The writer explains why such conflicts recur and reports the board's rules: in-service safety first, then dry-dock work, then planning; the bid evaluation moved; a deputy in training; and central booking of the expert. Payne, Engwall and Jerbrant and Laslo and Goldberg are cited.

Where the QSO 680 Module 7 rubric puts the points

Credit in the seventh QSO 680 thread usually goes to a concrete conflict with its stakes, an explanation that treats the conflict as a feature of the multi-project setting, a distinction between the immediate decision and lasting rules, practical allocation practices, fairness to each project's legitimate needs and research on multi-project management. Posts do well when the proposed rules would actually have prevented the conflict described. They lose marks for blaming individuals, for resolving the case by seniority without rules, for priority schemes so vague every project ranks first or for ignoring the long-term fix of building more capacity. Replies that test a classmate's rule against a harder collision earn the most credit. APA citations complete the grade.

QSO 680 Module 7 help: the mistakes that cost points

Describe one conflict between projects in specific terms: who needed what, when, and what each would lose without it. Then step back and ask why it happened. Usually the cause is structural: several projects planned independently against the same scarce people. Decide what should have happened this time and why. Then propose rules that would settle the next conflict before it starts, such as priority criteria agreed in advance, a single person who books scarce experts across projects and a plan to build backup capacity. Be fair to every project manager involved. Posts often end with "better communication"; the useful ones name a rule, who owns it and what it would have decided in the case described.

Get QSO 680 Module 7 written to your instructions

Paste the QSO 680 Module 7 prompt and describe a resource conflict between projects. A writer analyzes why the conflict arose, separates the scheduling problem from the organizational one, proposes priority rules and allocation practices at program or portfolio level and supports the post with multi-project research, then poses a question for the class. The opening QSO 680 post is written free, generally inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 680 papers and related MS Project Management samples

QSO 680 Module 7 questions, answered

Where can I find a free QSO 680 Module 7 Discussion sample?

The full QSO 680 Module 7 post is on this page: three invented cruise ship projects competing for one propulsion expert.

What is multi-project management?

Managing several projects that share resources, people or goals so that priorities and resources are set across them rather than project by project.

Why do projects fight over resources?

Because projects are usually planned independently against the same scarce people and equipment, so conflicts appear only when schedules collide.

How should resource conflicts between projects be resolved?

With priority rules agreed in advance at program or portfolio level, central allocation of scarce resources and investment in backup capacity.

What is the resource allocation syndrome?

A pattern in multi-project organizations where constant reshuffling of resources between projects becomes the main management problem.