QSO 328 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This QSO 328 Module 4 Discussion sample weighs closed-loop supply chains and whether a manufacturer should take back product scrap from its customers. SNHU QSO 328 (QSO-328) introduces closed loops and the circular economy in this module of its BS Operations Management sustainable operations course. Cumberland Clay Tile, an invented Tennessee tile maker, could collect the 7 to 10 percent of each tile order that installers cut away and grind it into new tile. The post weighs the value of recovered material against collection costs and contamination, using research on the evolution of closed-loop supply chains, on which kinds of pollution reduction pay and on sustainable supply chain management, and proposes a pilot.

CourseQSO 328 Sustainable Operations
ModuleModule 4
Paper typeundergraduate discussion post on closed-loop supply chains and whether a manufacturer should take back product scrap from customers
LengthAbout 370 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 328 Module 4

1

Module Four Discussion

Offcuts in the Dumpster, Clay in the Mill

Cumberland Clay Tile already throws away 11,500 tons of fired scrap a year at the plant. But our tile creates more waste after it leaves us. Installers buy 7 to 10 percent more tile than a floor needs, because tile must be cut around walls and fixtures and some breaks, and those offcuts go into job-site dumpsters. On our 19 million square feet a year, that is roughly 1.5 million square feet, perhaps 3,500 tons, of tile we fired and shipped that ends in a landfill. Project One proposed grinding our own fired scrap into new tile bodies. Could installers' offcuts join that stream?

What this page is doingThe waste we never see.
2

Research on closed-loop supply chains has moved from a technical niche to a business focus on recovering value profitably from returned products (Guide & Van Wassenhove, 2009). Their emphasis on value is the right test here. Fired porcelain ground into powder can replace some raw clay and feldspar, worth perhaps $25 a ton to us, plus the landfill fee avoided. But collecting offcuts from thousands of residential jobs would cost far more than that, offcuts mixed with mortar or other brands' tile cannot be used because they would change the body's chemistry and color, and most homeowners' jobs produce a few boxes at most. Firms that cut pollution by not creating waste tended to profit from it, King and Lenox (2002) reported, while cleanup after the fact showed no such return, which suggests we should first prevent offcuts, for example by helping installers order more precisely, before building an expensive return system.

What this page is doingWhat a loop would take.
3

Commercial projects are different. A hospital or airport job uses tens of thousands of square feet, generates offcuts in one place and is run by installers who want to earn green building credits. Sustainable supply chain management, in one widely used framework, depends on cooperation among partners and on attention to both supplier risk and product-based strategies (Seuring & Müller, 2008). A pilot with three commercial installers, providing clean collection bins for our tile only and a credit on the next order, would test volume, contamination and cost over six months.

What this page is doingWhere it could work.
4

Which product in your industry could be recovered after use, and what would make collecting it too expensive?

What this page is doingOver to the group.
5

References

Guide, V. D. R., Jr., & Van Wassenhove, L. N. (2009). The evolution of closed-loop supply chain research. Operations Research, 57(1), 10-18. https://doi.org/10.1287/opre.1080.0628

King, A., & Lenox, M. (2002). Exploring the locus of profitable pollution reduction. Management Science, 48(2), 289-299. https://doi.org/10.1287/mnsc.48.2.289.258

Seuring, S., & Müller, M. (2008). From a literature review to a conceptual framework for sustainable supply chain management. Journal of Cleaner Production, 16(15), 1699-1710. https://doi.org/10.1016/j.jclepro.2008.04.020

What the QSO 328 Module 4 instructions ask for

The QSO 328 Module 4 discussion often asks students to consider closed-loop supply chains, reverse logistics or the circular economy: recovering products, parts or materials after use and returning them to production. Students usually evaluate whether a take-back or recycling program makes sense for a product they know. Strong posts estimate the value of what could be recovered, the costs of collecting, sorting and processing it and the quality risks, and they recognize that loops work best where volumes are concentrated and materials are clean. They use research on closed-loop supply chains and propose a realistic first step. Peers tend to press on contamination and freight, the two costs most often left out.

How this QSO 328 Module 4 discussion example is built

The post considers job-site offcuts at Cumberland Clay Tile, a made-up tile maker. Installers typically cut away 7 to 10 percent of tile purchased, and those pieces go to dumpsters. The plant already plans to grind its own fired scrap into new tile bodies, and clean offcuts of its own tile could join that stream. But collection from thousands of scattered job sites is costly, offcuts mixed with mortar or other brands are unusable and only large commercial jobs produce enough volume. Guide and Van Wassenhove's history of closed-loop supply chain research, King and Lenox's finding that waste prevention pays and Seuring and Müller's framework for sustainable supply chains support a pilot with three commercial installers before any broad program.

Where the QSO 328 Module 4 rubric puts the points

Grading for the QSO 328 closed-loop thread follows whether the post estimates the value of recovery, counts collection, sorting and quality costs, recognizes when loops are and are not workable, uses closed-loop or reverse logistics research correctly and proposes a realistic first step, along with replies that test classmates' assumptions. Posts that score highest show that the loop's economics depend on volume and cleanliness and design a pilot that tests those conditions. Points drop when posts assume recycling always pays, ignore contamination and transport, propose national programs without a pilot or reply without engaging. Proper citations and readable writing complete the grade.

QSO 328 Module 4 help: the mistakes that cost points

Describe the product or material you would recover and where it ends up now. Estimate how much is available, where it is and how clean it is. Then list the steps of a return loop: collecting, transporting, sorting, cleaning and reprocessing, and estimate the cost of each against the value of the recovered material. Research suggests that closed loops pay best when the recovered material is valuable, volumes are concentrated and quality can be controlled, and that preventing waste in the first place often pays more than recovering it. A common mistake is focusing on the environmental benefit and ignoring logistics; another is designing a loop that accepts mixed or dirty material. Propose a small pilot and ask classmates where a loop would work in their industries.

Get QSO 328 Module 4 written to your instructions

Share the QSO 328 Module 4 prompt and a product whose waste you would like to recover. A writer weighs the value of recovery against collection, sorting and quality costs, applies research on closed-loop supply chains, proposes where a take-back program could work first and asks QSO 328 classmates a question about loops in their own industries. Your first QSO 328 closed-loop post is free, in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 328 papers and related BS Operations Management samples

QSO 328 Module 4 questions, answered

Where can I find a free QSO 328 Module 4 Discussion sample?

Read the whole QSO 328 Module 4 post above, which asks whether an invented tile maker should take back installers' offcuts and grind them into new tile.

What is a closed-loop supply chain?

A supply chain designed to recover products, components or materials after use and return them to production, as well as delivering new products.

When do take-back programs make economic sense?

When recovered materials are valuable, returns are concentrated enough to collect cheaply and their quality can be controlled well enough to reuse.

What is reverse logistics?

The process of moving goods or materials from customers back to the producer or a recycler for return, repair, remanufacturing, recycling or disposal.

Is preventing waste better than recycling it?

Usually. Research finds that preventing waste at the source is more often profitable than treating or recovering it afterward, since nothing must be collected or reprocessed.