QSO 510 Module 2 Probability Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 510 Module 2 Probability Assignment sample applies probability distributions to a business risk and uses the results to set a policy. SNHU QSO 510 (QSO-510) assigns probability in Module 2 of its MS Operations Management quantitative analysis course. The risk belongs to Prairie Wind Coach Lines, an invented Iowa charter bus company whose coaches sometimes break down far from home and whose drivers sometimes fail to report. The paper estimates the chance of a breakdown on one trip and on a busy weekend, the chance of a missing driver and what each is worth protecting against on its busiest weekends.

CourseQSO 510 Quantitative Analysis for Decision Making
ModuleModule 2
Paper typegraduate assignment applying probability distributions to a business risk and using the results to set a policy
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 510 Module 2

1

Two Percent per Trip, Twenty-Three Percent per Weekend: Breakdown and Absence Probabilities at Prairie Wind

[Student Name]

Southern New Hampshire University

QSO 510: Quantitative Analysis for Decision Making

Probability Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe breakdown, absence and cost figures for Prairie Wind Coach Lines in this QSO 510 assignment are invented.
2

Two Percent per Trip, Twenty-Three Percent per Weekend: Breakdown and Absence Probabilities at Prairie Wind

Introduction

Prairie Wind Coach Lines runs charters across the Midwest, often hundreds of miles from its Cedar Rapids garage. When a coach breaks down on the road, Prairie Wind must send a replacement or hire one from another operator, and the passengers, often a team on its way to a game, wait. When a driver fails to report on a busy day, a trip may go uncovered. The owner wants to know how likely these events are on a typical trip and on a busy weekend, and whether keeping a spare coach and a standby driver on peak weekends is worth the cost.

What this page is doingStates the risk and the decision.
3

Breakdowns as a Poisson Process

Road breakdowns are rare, occur one at a time and depend mainly on how far coaches travel. A Poisson distribution, which describes the number of rare, independent events in a fixed interval at a constant average rate, fits that description. Last year Prairie Wind's coaches drove about 2.1 million miles and had 46 road calls that required a replacement coach, a rate of about 2.19 per 100,000 miles.

Breakdown probabilities

ExposureExpected breakdownsProbability of at least oneProbability of two or more
One 900-mile round trip0.020About 2.0%Under 0.1%
Football weekend, 30 trips, about 12,000 miles0.263About 23.1%About 2.9%

For a single trip, the probability of at least one breakdown is one minus e to the minus 0.020, about 2 percent. Across a football weekend with about 12,000 miles of driving, the expected number of breakdowns is 0.263 and the probability of at least one is about 23 percent, nearly one weekend in four. The probability of two or more is about 3 percent. Tversky and Kahneman (1974) showed that people tend to misjudge how probabilities combine across many events; the owner's sense that breakdowns are rare is right for one trip and wrong for a weekend.

What this page is doingChooses and estimates the distribution.
4

Driver No-Shows as a Binomial Process

Each scheduled driver either reports or does not. Over the past year, about 2 percent of scheduled driver assignments ended in a no-show or a same-day call-out. With 30 drivers scheduled on a football weekend, the number of no-shows follows a binomial distribution with 30 trials and a probability of 0.02.

Driver absence probabilities, 30 scheduled drivers

OutcomeProbability
No absencesAbout 54.5%
At least one absenceAbout 45.5%
Two or more absencesAbout 12.1%

Nearly half of busy weekends will have at least one missing driver, a far more frequent problem than breakdowns.

What this page is doingModels absences.
5

Checking the Assumptions

Kleijnen (2005) stresses that model results should be tested against the assumptions behind them, since conclusions can be sensitive to inputs that seem minor. Three assumptions matter here. First, breakdowns are assumed independent of each other and proportional to miles. That is broadly true, but older coaches break down more often: the 12 coaches over eight years old had about 60 percent of road calls. On a weekend using mostly older coaches, the rate would be higher. Second, the rate is assumed constant through the year, but cold weather raises it; January and February had about 30 percent more road calls per mile. Third, driver absences are assumed independent. A flu outbreak would break that assumption, and two weekends last winter had three absences each, more than the binomial model predicts. The probabilities above are therefore a reasonable baseline and likely an underestimate for winter weekends and older coaches.

What this page is doingTests whether the models fit.
6

A Winter Weekend

Because the baseline probabilities understate winter risk, the same calculations were repeated for a January basketball tournament weekend with the same 30 trips and about 12,000 miles. Raising the breakdown rate by 30 percent, to about 2.85 per 100,000 miles, gives an expected 0.34 breakdowns and about a 29 percent chance of at least one. Winter call-outs last year ran at about 3 percent of assignments rather than 2, and at that rate the chance of at least one missing driver among 30 rises from about 45 percent to about 60 percent, and the chance of two or more from about 12 percent to about 23 percent. The expected number of uncovered trips without protection rises from about 0.86 to about 1.24, or roughly $1,800 in replacement costs before any loss of goodwill. Even this adjusted figure assumes that absences are independent, which a flu outbreak would violate, so winter weekends deserve the most protection. The policies below are compared at the baseline rates, which makes the case for protection conservative.

What this page is doingAdjusts the estimates for harder conditions.
7

Expected Costs of Protection

Howard (1988) describes the value of decision analysis as turning uncertain consequences into a choice among alternatives with explicit costs and probabilities. When a breakdown or absence leaves a trip uncovered, Prairie Wind must hire a coach and driver from an affiliated operator, which costs about $1,450 for a weekend day including the operator's premium, and risks the customer's goodwill. Keeping a spare coach fueled and ready at the garage on a peak weekend costs about $180 in lost rental income and readiness, and paying a standby driver about $220.

Expected weekend cost of uncovered trips, simplified

PolicyExpected uncovered tripsExpected cost
No spare, no standbyAbout 0.86About $1,250
Spare coach onlyAbout 0.63About $1,100
Standby driver onlyAbout 0.41About $810
Spare coach and standby driverAbout 0.18About $660

The expected number of uncovered trips without protection is the expected breakdowns plus expected absences, about 0.26 plus 0.60. A spare coach covers the first breakdown, and a standby driver covers the first absence; when a coach breaks down far away, the spare coach still needs a driver, so the two work together. The table simplifies by treating each event as one uncovered trip and adds the cost of the protection itself to each policy.

What this page is doingCompares the options.
8

Recommendation

Prairie Wind should keep a standby driver on every peak weekend, since driver absences are the more frequent problem, and a spare coach as well on football weekends and in winter, when breakdown risk is higher. Together they cut the expected weekend cost, including the protection itself, from about $1,250 to about $660 and protect customers who are unlikely to forgive a missed game. A simulation later in the course will test the policy with more realistic conditions.

What this page is doingStates the policy.
9

References

Howard, R. A. (1988). Decision analysis: Practice and promise. Management Science, 34(6), 679-695. https://doi.org/10.1287/mnsc.34.6.679

Kleijnen, J. P. C. (2005). An overview of the design and analysis of simulation experiments for sensitivity analysis. European Journal of Operational Research, 164(2), 287-300. https://doi.org/10.1016/j.ejor.2004.02.005

Tversky, A., & Kahneman, D. (1974). Judgment under uncertainty: Heuristics and biases. Science, 185(4157), 1124-1131. https://doi.org/10.1126/science.185.4157.1124

What the QSO 510 Module 2 instructions ask for

The QSO 510 Module 2 assignment usually asks students to apply probability concepts and distributions to a business situation. Expect to identify the uncertain events, choose appropriate distributions such as binomial, Poisson or normal, estimate their parameters from data, calculate probabilities of interest, interpret them for decision makers and, in many versions, use them with costs to compare options. Strong assignments justify the choice of distribution from the nature of the process, show the parameter estimates and calculations, check whether assumptions such as independence and constant rates hold, distinguish the probability of an event on one occasion from its probability across many and turn probabilities into an expected-cost comparison that supports a decision.

How this QSO 510 Module 2 probability assignment example is built

The assignment applies probability to breakdowns and driver absences at Prairie Wind Coach Lines, a fictional charter bus company in Cedar Rapids, Iowa. With 46 road calls on 2.1 million miles, breakdowns follow a Poisson rate of about 2.2 per 100,000 miles: about a 2 percent chance on a 900-mile round trip, but about a 23 percent chance of at least one on a football weekend of 30 trips and 12,000 miles, and about 3 percent of two or more. A binomial model of a 2 percent no-show rate gives a 45 percent chance that at least one of 30 drivers fails to report. A spare coach and a standby driver are compared on expected cost. Tversky and Kahneman, Howard and Kleijnen inform the analysis.

Where the QSO 510 Module 2 rubric puts the points

The QSO 510 probability assignment is commonly graded on correctly identified uncertain events, distributions justified by the process, parameters estimated from data, accurate calculations shown in full, a check of assumptions, clear interpretation for managers and a decision supported by expected costs. The strongest assignments show how a small probability per occasion becomes a large one across many occasions. Credit drops when distributions are chosen without reason, calculations are not shown, independence is assumed without comment, probabilities are reported without meaning or the analysis stops before the decision. Tables, clear writing and APA citations complete the grade.

QSO 510 Module 2 help: the mistakes that cost points

Start by naming the uncertain events and asking how they arise: a count of yes-or-no outcomes among a fixed number of trials suggests a binomial distribution; a count of rare events over time or distance suggests a Poisson; a measured quantity that varies around an average may be normal. Estimate each parameter from your data and show the arithmetic. Calculate the probabilities a manager cares about, such as at least one event in a busy period, not just the chance on a single occasion. Check whether events are independent and rates constant. Then attach costs to outcomes and compare options by expected cost. A common mistake is reporting a probability without saying what it means for the decision; another is forgetting how quickly small risks add up.

Get QSO 510 Module 2 written to your instructions

Send the QSO 510 Module 2 prompt along with the records or case facts you were given. A writer chooses suitable distributions, estimates their parameters from data, calculates the probabilities that matter, checks the assumptions, compares protective options on expected cost and recommends a policy, citing quantitative methods research. Your first QSO 510 paper is free, sent within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 510 papers and related MS Operations Management samples

QSO 510 Module 2 questions, answered

Where can I find a free QSO 510 Module 2 Probability Assignment sample?

The complete QSO 510 Module 2 assignment is on this page: breakdown and absence probabilities at an invented charter bus company.

When is the Poisson distribution used?

To model the number of rare, independent events occurring in a fixed interval of time, distance or space at a constant average rate, such as breakdowns per mile.

When is the binomial distribution used?

To model the number of successes or failures in a fixed number of independent trials with the same probability, such as driver no-shows among scheduled drivers.

How do you calculate the probability of at least one event?

Subtract the probability of zero events from one; for a Poisson rate lambda, that is one minus e to the minus lambda.

What is expected cost in decision making?

The sum of each outcome's cost multiplied by its probability, used to compare options when outcomes are uncertain.