| Course | QSO 510 Quantitative Analysis for Decision Making |
|---|---|
| Module | Module 6 |
| Paper type | graduate assignment comparing time series forecasting methods on held-out data, choosing a method and using the forecast for a capacity decision |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 510 Module 6
Six Hundred Ninety Charter Days in October: Forecasting Demand at Prairie Wind
[Student Name]
Southern New Hampshire University
QSO 510: Quantitative Analysis for Decision Making
Forecasting Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Six Hundred Ninety Charter Days in October: Forecasting Demand at Prairie Wind
Introduction
By June, the owner has to decide whether to renew leases on two of the company's 38 coaches. The decision depends on how many charter days next year's peak months will need. This assignment forecasts monthly charter days, a charter day being one coach used for one day, by comparing three methods on a held-out year, choosing the most accurate and using the forecast and its uncertainty to inform the lease decision.
The Series
Three years of monthly charter days show a strong seasonal pattern and a slight upward trend. Demand peaks in May, with school trips and graduations, and in October, with football and fall tours; it falls to its lowest in January and July. The October peak varies with the number of home football games at the two universities Prairie Wind serves, which changes from year to year, and spring demand depends on school calendars, including whether spring break falls in March or April.
Methods
The first is a seasonal naive forecast, which simply repeats last year's figure for each calendar month. The second is Holt-Winters exponential smoothing with multiplicative seasonality; Gardner (1985) reviewed exponential smoothing methods and found them robust and widely effective for series with level, trend and seasonal components. The third is a regression of monthly charter days on a trend, monthly dummy variables, the number of home football games at the two universities that month and an indicator for spring break.
Accuracy on the Held-Out Year
Each method was fitted on the first two years and used to forecast the third.
Accuracy on the held-out year
| Method | Mean absolute error, charter days | MAPE | Mean absolute scaled error |
|---|---|---|---|
| Seasonal naive | 71 | 17.8% | 1.00 |
| Holt-Winters | 41 | 10.9% | 0.58 |
| Regression with calendar and football | 33 | 8.6% | 0.47 |
Hyndman and Koehler (2006) recommend scaled errors, which compare a method's mean absolute error with that of a naive benchmark, because they are reliable across series and do not break down when values are small. Both Holt-Winters and the regression beat the naive benchmark by a wide margin. The regression does best because it knows something the others do not: how many home games each October will have and when spring break falls, both known a year ahead. Makridakis and Hibon (2000) found in a large forecasting competition that sophisticated methods did not consistently beat simpler ones; here, the advantage comes not from complexity but from adding drivers that are known in advance.
Checking the Errors
Accuracy summaries can hide a method that is wrong in a consistent direction, so the regression's twelve held-out errors were examined one by one. Their average was about 4 charter days too high, a small bias relative to monthly demand of 300 to 700 days. The largest misses were in March and April, when the timing of Easter shifted several church and school trips between the two months in a way the spring break variable did not capture; adding an Easter indicator reduced those two errors but made no difference elsewhere, so it was added for next year's forecast. The errors showed no run of months above or below the actual figures, which suggests that the model is not missing a trend.
An average of the Holt-Winters and regression forecasts was also tested, since Makridakis and Hibon (2000) found that combining forecasts often improves accuracy. Here the combination had a MAPE of about 9.1 percent, slightly worse than the regression alone, because Holt-Winters had no way to know the football schedule. The regression was kept on its own.
Forecast for Next Year
The regression was refitted on all three years and used to forecast next year, using the published football schedules and school calendars.
Forecast for the peak months
| Month | Forecast charter days | 80% prediction interval |
|---|---|---|
| May | 640 | 590 to 690 |
| September | 580 | 535 to 625 |
| October | 690 | 640 to 740 |
| November | 560 | 515 to 605 |
The peak month is October, with about 690 charter days forecast and an 80 percent interval of about 640 to 740.
Capacity and the Lease Decision
With 38 coaches available about 20 days each in October, after maintenance and spares, capacity is about 760 charter days; with 36 coaches, about 720. The point forecast of 690 fits within 36 coaches. But the upper end of the 80 percent interval, 740, exceeds 36-coach capacity, and the regression's errors suggest about a 15 percent chance that October demand exceeds 720.
Combining that probability with the costs from Module 4, about $210,000 if two coaches are returned and demand is high and about $150,000 if they are kept and demand is low, the expected cost of returning the coaches falls to about $32,000, against about $128,000 for keeping them. The forecast, which narrowed the chance of a busy peak from the managers' 40 percent to about 15 percent, changes the expected costs enough to make the choice clear: return the two coaches and plan to subcontract on the few October days when demand exceeds capacity.
Limits
The forecast assumes that the university contract, if won, adds demand mostly outside October; if it adds October trips, the forecast must be revised. A recession that cuts school travel budgets would lower spring demand, and a change in the universities' conference schedules could move football games between September and November. The prediction intervals reflect only the errors seen in three years of history, so they understate the uncertainty from events of this kind, which the history does not contain. For that reason the lease decision should be revisited if any of these changes is announced before June. The model should be refitted each quarter and its accuracy checked against actual months.
Conclusion
A regression with known calendar drivers forecasts Prairie Wind's charter days more accurately than seasonal naive or smoothing methods, missing by about 8.6 percent on average across a held-out year. Its forecast and interval show about a 15 percent chance that October will need more than 36 coaches, which supports returning the two leased coaches and planning to subcontract on the busiest days.
References
Gardner, E. S., Jr. (1985). Exponential smoothing: The state of the art. Journal of Forecasting, 4(1), 1-28. https://doi.org/10.1002/for.3980040103
Hyndman, R. J., & Koehler, A. B. (2006). Another look at measures of forecast accuracy. International Journal of Forecasting, 22(4), 679-688. https://doi.org/10.1016/j.ijforecast.2006.03.001
Makridakis, S., & Hibon, M. (2000). The M3-Competition: Results, conclusions and implications. International Journal of Forecasting, 16(4), 451-476. https://doi.org/10.1016/S0169-2070(00)00057-1
What the QSO 510 Module 6 instructions ask for
The QSO 510 Module 6 assignment usually asks students to forecast a business time series. Expect to describe the series and its components, such as trend and seasonality, apply several methods, from simple averages and smoothing to Holt-Winters or regression with time and seasonal variables, compare their accuracy using measures such as MAD, MAPE or RMSE, select a method, produce forecasts and say which decision the forecast feeds. Strong assignments test methods on data held out from fitting, include a naive benchmark, choose error measures that suit the series, report prediction intervals as well as point forecasts and show how the uncertainty in the forecast affects the decision.
How this QSO 510 Module 6 forecasting assignment example is built
The assignment forecasts monthly charter days at Prairie Wind Coach Lines, a fictional charter bus company in Cedar Rapids, Iowa, from three years of history with peaks in May and October. Tested on a held-out year, a seasonal naive forecast misses by about 17.8 percent, Holt-Winters exponential smoothing by about 10.9 percent and a regression with school-calendar and home-football variables by about 8.6 percent, with scaled errors of 0.58 and 0.47 for the last two. The chosen forecast puts next year's peak month at about 690 charter days, against capacity of about 760 with 38 coaches and 720 with 36. Prediction intervals, not the point forecast, decide whether to renew two leases. Gardner, Makridakis and Hibon and Hyndman and Koehler support the method.
Where the QSO 510 Module 6 rubric puts the points
The QSO 510 forecasting assignment is commonly graded on how well the series is described, sensible methods including a naive benchmark, accuracy compared on held-out data, error measures that suit the series, a justified choice of method, forecasts with prediction intervals and a clear link to the decision. The strongest assignments show how the forecast's uncertainty, not only its point value, changes the decision. Credit drops when accuracy is measured on fitted data, no benchmark is used, the chosen method is not justified, intervals are missing or the forecast is not connected to any decision. Tables, clear writing and APA citations complete the grade.
QSO 510 Module 6 help: the mistakes that cost points
Plot the series and describe it: is there a trend, a seasonal pattern, a link to known events? Hold back the most recent year. Fit at least three methods on the earlier data, including a naive benchmark such as the same month last year, an exponential smoothing method suited to the pattern and, if you know what drives demand, a regression with those drivers. Forecast the held-back year with each and measure accuracy in more than one way. Choose the method that does best and explain why it fits the series. Refit it on all the data and forecast ahead with a prediction interval. Finally, show how the decision depends on where in that interval demand falls. A common mistake is choosing a method by its fit to the past; another is reporting a single number.
Get QSO 510 Module 6 written to your instructions
Share the QSO 510 Module 6 instructions and your time series. A writer describes the series' pattern, fits naive, smoothing and regression or other methods, compares them on held-out data with suitable error measures, produces the forecast with prediction intervals and connects it to the decision it informs, citing forecasting research. Your first QSO 510 paper is free, delivered within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 510 papers and related MS Operations Management samples
- QSO 510 Module 1 Discussion: Which Model for Which Decision
- QSO 510 Module 2 Probability Assignment: Breakdowns on the Road
- QSO 510 Module 3 Decision Tree Assignment: Bidding on the University Contract
- QSO 510 Module 4 Discussion: What a Demand Forecast Is Worth
- QSO 510 Module 5 Regression Assignment: What Drives Charter Revenue
- QSO 510 Module 7 Linear Programming Assignment: Assigning Coaches and Drivers
- QSO 510 Module 8 Simulation Assignment: A Saturday With Three Football Games
- QSO 510 Module 9 Final Project: The Decision Analysis Report
- QSO 510 Module 10 Discussion: Models a Manager Should Not Trust
- HRM 630 Module 9 Discussion: Keeping the Gains
- ACC 640 Module 6 Milestone Two: Inventory at Someone Else's Warehouse
- MBA 580 Module 1 Innovation and Performance Discussion: An automaker improving the wrong thing
- OL 751 Module 9 Final Project: The HR Strategy Proposal
QSO 510 Module 6 questions, answered
Where can I find a free QSO 510 Module 6 Forecasting Assignment sample?
The complete QSO 510 Module 6 assignment is on this page: forecasting monthly charter days at an invented charter bus company.
What is Holt-Winters exponential smoothing?
A forecasting method that smooths a series' level, trend and seasonal pattern, giving more weight to recent observations, suited to seasonal data.
What is a holdout sample in forecasting?
A recent part of the data kept out of model fitting and used to test how accurately each method forecasts periods it has not seen.
What is a prediction interval?
The band a future observation is likely to land in, given at a stated confidence such as 80 percent, around a point forecast.
What is MAPE?
Mean absolute percentage error: the average of absolute errors as a percentage of actual values, easy to interpret, though it breaks down when actual values are close to zero.