Free sample paper for QSO 510 Module 9
Bid High, Return Two Coaches, Hire Weekend Drivers: The Decision Analysis Report for Prairie Wind Coach Lines
[Student Name]
Southern New Hampshire University
QSO 510: Quantitative Analysis for Decision Making
Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Bid High, Return Two Coaches, Hire Weekend Drivers: The Decision Analysis Report for Prairie Wind Coach Lines
Recommendations
Recommendations and expected effects
| Decision | Recommendation | Expected effect |
|---|---|---|
| University athletics contract | Bid high at about $1.95 million a year; do not buy competitor intelligence | About $260,000 expected profit over three years |
| Two leases ending in June | Return both coaches | About $192,000 a year saved, less about $32,000 expected subcontracting |
| Peak-day staffing | Hire three part-time weekend drivers | About $15,000 a year net |
| Short-trip pricing | Add a four-hour minimum charge, phased in at renewal | About $140,000 a year if accepted |
| Football Saturdays | Keep one spare coach and two standby drivers | About $16,500 a year less expected cost than no protection |
Together, the recommendations improve expected annual profit by roughly $420,000, counting a third of the university contract's three-year expected profit in each year. Each recommendation rests on a different analysis, but they point in a consistent direction: Prairie Wind has more coaches than it needs on its busiest days and fewer drivers, and some of its prices do not cover its costs.
The University Contract
A decision tree compared bidding high, bidding low and not bidding, with win chances depending on whether the main competitor bids aggressively, judged 40 percent likely. The high bid's expected value, about $260,000 after bid costs, is more than twice the low bid's. Howard (1988) describes decision analysis as making a decision's structure explicit so that alternatives can be compared on consistent terms. Here it showed that perfect knowledge of the competitor's plans would be worth only about $8,000, so a $15,000 consultant's report is not worth buying. The recommendation holds unless the competitor is more than about 93 percent likely to bid aggressively.
The Two Leases
A regression forecast with school-calendar and football variables, which beat seasonal naive and smoothing methods on a held-out year with an error of about 8.6 percent, puts next October's peak at about 690 charter days, with about a 15 percent chance of exceeding the 720 that 36 coaches can cover. At that probability, the expected cost of returning the coaches, about $32,000 in subcontracting, is far below the $192,000 a year the leases cost. The linear program for a peak Saturday reached the same conclusion from a different direction: it left six full-size coaches idle and gave them a shadow price of zero. If Prairie Wind wins the university contract, it will lease two coaches for that contract specifically, so the decision on the old leases does not change.
Weekend Drivers
According to the linear program, Prairie Wind's peak Saturdays are limited by the number of drivers, with each additional driver worth about $570 per peak day for up to about two drivers. A part-time weekend driver costs about $260 per day worked. Across about 22 peak Saturdays a year, three part-time drivers, one of them mainly a standby driver, would add about $15,000 a year in net value, the third driver less than the first two, and reduce subcontracting.
Short-Trip Pricing
A regression of revenue on trip features, explaining about 86 percent of the variation and predicting held-out trips within about $320, revealed that trips under four hours earn about $260 less than the pattern predicts, because drivers are paid a four-hour minimum the rate sheet ignores. A four-hour minimum charge on about 540 short trips a year would add about $140,000 if customers accept it. That is the most uncertain benefit in the report, since the regression describes past prices, not customers' willingness to pay.
Football Saturdays
A Monte Carlo simulation of 5,000 football Saturdays, with random trip lengths, breakdowns, driver absences and late add-on charters, showed that without protection about 77 percent of Saturdays need a subcontracted coach. One spare coach and two standby drivers cut that to about 20 percent and the expected cost by about $750 a Saturday. Two spares cut the chance further, to about 7 percent, at little extra expected cost, but tie up a coach that could be rented. The probability analysis in Module 2 had pointed the same way: absences are more frequent than breakdowns, so standby drivers matter most.
Assumptions and Sensitivity
Pannell (1997) makes the case that testing how answers move when inputs move tells decision makers more than any single result, because it shows which assumptions matter.
Key assumptions and their effect
| Assumption | Used | If wrong | Effect on recommendation |
|---|---|---|---|
| Competitor aggressive | 40% | Above about 93% | Low bid becomes better |
| High-bid win chance against a non-aggressive competitor | 52% | Below about 20% | Bids roughly equal |
| October demand above 720 charter days | 15% | Above about 42% | Keeping the leases becomes better |
| Customers accept a four-hour minimum | Yes | Some leave | Benefit falls; phase in and monitor |
| Late add-on charter on football Saturdays | 35% | 50% | A second spare coach becomes worthwhile |
Most recommendations are robust: they hold over wide ranges. The pricing change is the exception, depending on customers' response, which is why it should be phased in.
Implementation
The bid is due in May and should be submitted first. The lease decision is due by June 30. Recruiting weekend drivers should begin in July, in time for training before the football season. The spare and standby policy begins with the first football Saturday. The four-hour minimum should be introduced for new bookings in the fall and for school and church customers at renewal, with bookings and cancellations tracked to see whether customers leave.
Limits
Box (1976) warned that all models are simplifications and must be judged by whether they are useful for their purpose. These models rest on two years of data, managers' judgments of competitor behavior and assumptions of independence that a flu season or a cold snap would break. They should be refreshed each year with new data, and the forecast and simulation rerun before each football season.
Conclusion
Prairie Wind should bid high on the university contract, return two leased coaches, hire weekend drivers, charge a four-hour minimum and protect football Saturdays with a spare coach and standby drivers. The analyses agree that the company's constraint on its busiest days is drivers, not coaches, and that some prices do not cover costs; acting on both should add roughly $420,000 a year in expected profit.
References
Box, G. E. P. (1976). Science and statistics. Journal of the American Statistical Association, 71(356), 791-799. https://doi.org/10.1080/01621459.1976.10480949
Howard, R. A. (1988). Decision analysis: Practice and promise. Management Science, 34(6), 679-695. https://doi.org/10.1287/mnsc.34.6.679
Pannell, D. J. (1997). Sensitivity analysis of normative economic models: Theoretical framework and practical strategies. Agricultural Economics, 16(2), 139-152. https://doi.org/10.1016/S0169-5150(96)01217-0
What the QSO 510 Module 9 instructions ask for
The QSO 510 final project usually asks students to apply several quantitative methods to a business situation and present the results to decision makers. Expect to define the decisions, apply suitable techniques such as decision trees, regression, forecasting, optimization and simulation, interpret the results, explain how the analyses connect, state assumptions and test sensitivity, quantify the expected effect of the recommendations and present them in a form managers can act on. Strong reports lead with recommendations, explain methods only as much as needed to trust them, show where results from different methods reinforce or qualify each other, are honest about uncertainty and state the conditions under which each recommendation would change.
How this QSO 510 Module 9 final project example is built
The project combines Prairie Wind Coach Lines' analyses into a report for its owner. Prairie Wind, a fictional charter bus company in Cedar Rapids, Iowa, should bid high on a university contract worth about $260,000 in expected profit and skip paying for intelligence on the competitor. It should return two leased coaches, since the forecast gives only about a 15 percent chance October needs them and the linear program shows coaches are not the binding resource. It should hire three part-time weekend drivers, each worth about $570 per peak Saturday, add a four-hour minimum charge worth about $140,000 a year and keep one spare coach and two standby drivers on football Saturdays. Expected profit improves by roughly $420,000 a year. Howard, Pannell and Box frame the report.
Where the QSO 510 Module 9 rubric puts the points
Instructors grading the QSO 510 final project look for clearly defined decisions, techniques suited to each, correct and interpreted results, an explanation of how the analyses connect, stated assumptions and sensitivity tests, a quantified expected effect, recommendations a manager could act on and the conditions that would change them. Reports that score highest show where one analysis confirms or qualifies another. Credit drops when methods are described at length without decisions, results are pasted from software, analyses stand apart, uncertainty is hidden or the report gives no conditions for revisiting its advice. Tables, clarity and APA citations count too.
QSO 510 Module 9 help: the mistakes that cost points
Lead with the recommendations, one per decision, each with its expected value or effect. Then, for each, summarize the analysis behind it in a few paragraphs: what you modeled, the key result and how sure you are. Look for connections, such as a forecast that informs a capacity choice or an optimization that confirms which resource is short, and say whether the analyses agree. Gather the main assumptions in one place and show what happens if each is wrong. Add up the expected financial effect, avoiding double counting. Close with how to implement the recommendations and what new information would make you revisit them. A common mistake is a report that walks through methods in order instead of answering the manager's questions; another is hiding uncertainty.
Get QSO 510 Module 9 written to your instructions
Upload the QSO 510 final project guidelines along with the analyses you completed in earlier modules. A writer turns them into one decision report: recommendations first, the analysis behind each, how the results interact, key assumptions and sensitivities, expected financial effect, implementation and the conditions that would change each decision, written for a manager and supported by research. Your first QSO 510 project is free, ready within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 510 papers and related MS Operations Management samples
- QSO 510 Module 1 Discussion: Which Model for Which Decision
- QSO 510 Module 2 Probability Assignment: Breakdowns on the Road
- QSO 510 Module 3 Decision Tree Assignment: Bidding on the University Contract
- QSO 510 Module 4 Discussion: What a Demand Forecast Is Worth
- QSO 510 Module 5 Regression Assignment: What Drives Charter Revenue
- QSO 510 Module 6 Forecasting Assignment: Monthly Charter Days
- QSO 510 Module 7 Linear Programming Assignment: Assigning Coaches and Drivers
- QSO 510 Module 8 Simulation Assignment: A Saturday With Three Football Games
- QSO 510 Module 10 Discussion: Models a Manager Should Not Trust
- QSO 630 Module 1 Discussion: From Farm Pond to Store Tank
- MKT 635 Module 2 Website Usability Assignment: Website Usability and Design Evaluation
- MKT 678 Module 7 Discussion: Licensing and Brand Dilution
- SPT 501 Module 2 Research Problem Assignment: The Problem and the Questions
QSO 510 Module 9 questions, answered
Where can I find a free QSO 510 Module 9 Final Project sample?
This page holds the complete QSO 510 Final Project: a decision analysis report for an invented charter bus company.
How should a decision analysis report be organized?
Recommendations first, then the analysis supporting each, the connections between analyses, assumptions and sensitivity, expected effects, implementation and conditions for revisiting.
Why combine several quantitative methods?
Because different decisions need different tools, and results from one method, such as a forecast, often feed or check another, such as a capacity or staffing model.
How should uncertainty be presented to managers?
With ranges, probabilities and the conditions under which recommendations would change, rather than single numbers presented as certain.
What is a robust recommendation?
One that remains the best choice across a wide range of plausible values for the uncertain inputs, so that it does not depend on any one estimate being exact.