QSO 510 Module 7 Linear Programming Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 510 Module 7 Linear Programming Assignment sample formulates and solves a linear program for assigning resources and interprets its sensitivity results. SNHU QSO 510 (QSO-510) assigns optimization in Module 7 of its quantitative analysis course in the MS Operations Management. The problem belongs to Prairie Wind Coach Lines, an invented Iowa charter bus company with more trips than drivers on a busy Saturday. The paper sets out the decision variables, objective and constraints, finds the lowest-cost assignment and reads the shadow prices, which show that the company is short of drivers rather than coaches on the busiest days of its fall season.

CourseQSO 510 Quantitative Analysis for Decision Making
ModuleModule 7
Paper typegraduate assignment formulating and solving a linear program for resource assignment and interpreting its sensitivity results
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 510 Module 7

1

Six Idle Coaches and a $570 Driver: A Linear Program for Prairie Wind's Peak Saturday

[Student Name]

Southern New Hampshire University

QSO 510: Quantitative Analysis for Decision Making

Linear Programming Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe trips, fleet, costs and results for Prairie Wind Coach Lines in this QSO 510 assignment are invented.
2

Six Idle Coaches and a $570 Driver: A Linear Program for Prairie Wind's Peak Saturday

Introduction

On the second Saturday in October, Prairie Wind Coach Lines has 34 charter trips booked: 18 large groups needing a full-size 56-seat coach, 6 university team trips that the athletics departments want in one of the company's four 40-seat executive coaches and 10 small groups of under 26 passengers. Available that day are 24 full-size coaches after maintenance and spares, 4 executive coaches, 8 minibuses and 30 drivers. Trips that Prairie Wind cannot cover itself can be subcontracted to an affiliated operator. This assignment formulates a linear program to cover all trips at the lowest cost and interprets its results.

What this page is doingStates the problem.
3

Costs

Cost per trip by assignment

Trip typeOwn full-size coachOwn executive coachOwn minibusSubcontract
Large group$780Not allowedNot allowed$1,450
Team trip$930, including a $150 service credit$820Not allowed$1,500
Small group$780Not allowed$520$1,100

Own costs include driver wages, fuel and wear for a typical trip of each type. A team trip in a full-size coach carries a $150 credit to the athletics department under the contract terms. Revenue is fixed by the bookings, so minimizing cost maximizes profit.

What this page is doingSets the objective's coefficients.
4

Formulation

Let L be large-group trips on own full-size coaches and SL large-group trips subcontracted; TE team trips on executive coaches, TF team trips on full-size coaches and ST team trips subcontracted; and SM small-group trips on minibuses, SF small-group trips on full-size coaches and SS small-group trips subcontracted.

The objective is to minimize 780L + 1,450SL + 820TE + 930TF + 1,500ST + 520SM + 780SF + 1,100SS.

The constraints are: every large-group trip covered, L + SL = 18; every team trip covered, TE + TF + ST = 6; every small-group trip covered, SM + SF + SS = 10; full-size coaches, L + TF + SF ≤ 24; executive coaches, TE ≤ 4; minibuses, SM ≤ 8; drivers, L + TE + TF + SM + SF ≤ 30; and all variables nonnegative. Dantzig (2002), recalling the origins of linear programming, describes exactly this kind of problem, allocating limited resources among competing activities to optimize an objective.

What this page is doingDefines variables, objective and constraints.
5

Solution

Optimal assignment

Trip typeOwn coachSubcontracted
Large groups18 on full-size coaches0
Team trips4 on executive coaches2
Small groups8 on minibuses2
Total30 trips covered in house4 subcontracted

The minimum cost is about $26,680: $21,480 for 30 trips covered in house and $5,200 for four subcontracted trips. The solution uses all 30 drivers, all four executive coaches and all eight minibuses, but only 18 of the 24 full-size coaches.

The solution makes practical sense. With 34 trips and 30 drivers, at least four trips must be subcontracted. The model subcontracts the trips where Prairie Wind's own cost advantage is smallest: two team trips that would otherwise go in full-size coaches with a service credit, saving $570 each, and two small groups that would otherwise need a full-size coach, saving only $320 each.

What this page is doingReports the optimal plan.
6

Sensitivity

Shadow prices of resources

ResourceUsedAvailableShadow price
Drivers3030About $570
Executive coaches44About $110
Minibuses88About $10
Full-size coaches1824$0

The driver constraint is binding and has the largest shadow price: one more driver would let Prairie Wind cover one more team trip in a full-size coach instead of subcontracting it, saving about $570, within an allowable range of about two more drivers, after which the next saving would be the $320 on small groups. The executive coaches and minibuses are also fully used, but an extra one would be worth little, since it would need a driver the company does not have. Full-size coaches have slack: six sit idle and are worth nothing more on this day.

Pannell (1997) argues that sensitivity analysis is often the most useful part of an optimization model for decision makers, because it shows which assumptions and resources matter. Here it shows something the bookings sheet does not: Prairie Wind is limited on a peak Saturday by drivers, not coaches.

What this page is doingReads the shadow prices.
7

Testing the Assumptions

Kleijnen (2005) stresses testing how results depend on model assumptions. Three assumptions matter. The model treats trips as interchangeable within a type, although some start too early for one driver to cover two; on a typical Saturday each driver covers one trip, so that holds. It assumes the affiliated operator has enough coaches, which is less certain on football Saturdays. And it assumes costs are linear, which fits per-trip costs. Running the model with 32 drivers lowers the cost to about $25,540 and leaves only two small groups subcontracted; running it with 22 full-size coaches changes nothing, confirming that coaches are not the constraint.

What this page is doingChecks what the model leaves out.
8

When Subcontractors Run Short

On the busiest football Saturdays, the affiliated operator may have only two coaches to spare instead of as many as Prairie Wind needs. Adding a limit of two subcontracted trips to the model makes it infeasible: 30 drivers plus two subcontracted coaches can cover only 32 of the 34 trips. That result is useful in itself. It tells the dispatcher that on such days the last two bookings cannot be served unless more drivers are found, and it shows that the question of extra drivers matters most exactly when outside help is scarce. It also gives the sales team a rule: on Saturdays when the affiliate has warned of short supply, new bookings should be accepted only up to the number of drivers on the roster plus the coaches the affiliate has promised. The solution was also checked for whole numbers; because of the structure of the constraints, the optimal plan uses whole trips without rounding.

What this page is doingTests the model under tighter supply.
9

What It Means for Decisions

The result supports two decisions already under discussion. Returning two leased coaches, as the forecast suggested, would leave four full-size coaches idle instead of six on a peak Saturday, so it costs nothing on days like this. And adding weekend drivers is worth about $570 per driver per peak Saturday, more than the roughly $260 a day a part-time weekend driver costs. Prairie Wind should recruit two or three part-time weekend drivers before the football season.

What this page is doingConnects to the year's choices.
10

Conclusion

The linear program covers 30 of 34 peak-Saturday trips in house at a total cost of about $26,680 and shows, through its shadow prices, that drivers, not coaches, limit Prairie Wind on its busiest days. Hiring part-time weekend drivers would pay; keeping extra coaches would not.

What this page is doingSummarizes the findings.
11

References

Dantzig, G. B. (2002). Linear programming. Operations Research, 50(1), 42-47. https://doi.org/10.1287/opre.50.1.42.17798

Kleijnen, J. P. C. (2005). An overview of the design and analysis of simulation experiments for sensitivity analysis. European Journal of Operational Research, 164(2), 287-300. https://doi.org/10.1016/j.ejor.2004.02.005

Pannell, D. J. (1997). Sensitivity analysis of normative economic models: Theoretical framework and practical strategies. Agricultural Economics, 16(2), 139-152. https://doi.org/10.1016/S0169-5150(96)01217-0

What the QSO 510 Module 7 instructions ask for

The QSO 510 Module 7 assignment usually asks students to set up and solve a linear program that allocates scarce resources. Expect to define decision variables, write an objective function to maximize or minimize, state the constraints, solve the model, often with spreadsheet software, report the optimal solution and its value and interpret the sensitivity report, including shadow prices, slack and allowable ranges. Strong assignments define variables precisely, include every real constraint, check that the solution makes practical sense, explain which constraints are binding, translate shadow prices into what an extra unit of a resource is worth and connect those values to decisions such as hiring or capacity.

How this QSO 510 Module 7 linear programming assignment example is built

The assignment formulates a linear program for Prairie Wind Coach Lines, a fictional charter bus company in Cedar Rapids, Iowa, to assign coaches and drivers on a peak Saturday. Thirty-four trips, 18 large groups, 6 university team trips that prefer the four executive coaches and 10 small groups, must be covered by 24 full-size coaches, 4 executive coaches, 8 minibuses and 30 drivers or subcontracted at $1,100 to $1,500 a trip. The solution covers 30 trips in house and subcontracts two team trips and two small groups for about $26,680. Six full-size coaches sit idle, and the shadow price of a driver is about $570 against nothing for a coach. Dantzig, Pannell and Kleijnen inform the analysis.

Where the QSO 510 Module 7 rubric puts the points

The QSO 510 linear programming assignment is commonly graded on precisely defined decision variables, a correct objective function, complete and correctly written constraints, a correct solution, a check that the solution is practical, interpretation of binding constraints, shadow prices and ranges and a link from the sensitivity results to management decisions. The strongest assignments explain what the shadow prices say about which resource limits the business. Credit drops when decision variables are loosely defined, a constraint is left out or written wrongly, the solution is reported without interpretation, shadow prices are misread or the analysis ignores what the model leaves out. Tables, clarity and APA citations complete the grade.

QSO 510 Module 7 help: the mistakes that cost points

Start by writing in words what you are choosing, what you want to minimize or maximize and what limits you. Then define variables precisely, for example the number of large-group trips assigned to full-size coaches. Write the objective as a sum of costs or profits times variables. Write a constraint for every limit: demand that must be covered, resources available, rules about which resource can serve which job. Solve, then check the answer makes practical sense. Read the sensitivity report: binding constraints are the ones that limit you, and their shadow prices tell you what one more unit is worth within the allowable range. Turn those values into decisions. A common mistake is leaving out a real constraint; another is reading a shadow price outside its range.

Get QSO 510 Module 7 written to your instructions

Share the QSO 510 Module 7 instructions and your problem data. A writer defines the decision variables, objective and constraints, solves the linear program, reports the optimal plan and its cost, interprets shadow prices and ranges and turns them into management decisions, with the formulation shown and assumptions tested, citing optimization research. Your first QSO 510 paper is free, written within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 510 papers and related MS Operations Management samples

QSO 510 Module 7 questions, answered

Where can I find a free QSO 510 Module 7 Linear Programming Assignment sample?

The complete QSO 510 Module 7 assignment is on this page: a linear program assigning coaches and drivers at an invented charter bus company.

What is a linear program?

A model that chooses values of decision variables to maximize or minimize a linear objective, such as cost, subject to linear constraints on resources and requirements.

What is a shadow price?

The change in the objective's optimal value from one more unit of a constrained resource, valid within the allowable range shown in the sensitivity report.

What is a binding constraint?

A constraint that is met exactly at the optimal solution, so the resource it represents is fully used and limits further improvement.

What does slack mean in a linear program?

The unused amount of a resource at the optimal solution; a constraint with slack has a shadow price of zero.