| Course | QSO 680 Seminar in Project Management |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment quantifying project risks with expected values, a decision tree and a cost simulation, choosing a response by risk efficiency rather than expected cost alone and setting contingency from the results |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Project Management |
| Updated | October 2026 |
Free sample paper for QSO 680 Module 8
Steel, Paint and a Decision Tree: Quantitative Risk for the Meridian Isle Dry Dock
[Student Name]
Southern New Hampshire University
QSO 680: Seminar in Project Management
Quantitative Risk Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Steel, Paint and a Decision Tree: Quantitative Risk for the Meridian Isle Dry Dock
Introduction
Forty-seven entries sit in the risk register for this January dock period. Ranked by color, most look alike: amber boxes for steel, paint, pods and the ballast water system. This paper moves to numbers. It ranks the main risks by expected cost, uses a decision tree for the most important risk-related decision, how to install the ballast water treatment system, and simulates cost to check whether the $4.7 million contingency is enough. Ward (1999) argued that an effective risk process must do more than list risks: it must support decisions, be integrated with planning and produce information that changes what people do. Each section therefore ends in a decision.
Ranking by Expected Cost
Main risks ranked by expected cost
| Threat | Chance | Hit if it happens | Chance times hit | Where the numbers came from |
|---|---|---|---|---|
| Steel renewal above 70 tonnes | 45% | $650,000 | $292,500 | Hull gauging history on sister ships |
| Ballast water system commissioning delays undocking a day | 30% (loose components) | $1.6 million | $480,000 | Supplier and two other lines' experience |
| Humidity stops coating more than one shift | 35% | $420,000 | $147,000 | Gulf Coast January dew point records |
| Pod bearing damage found on opening | 15% | $900,000 | $135,000 | Manufacturer's service data |
| Cabin materials late from supplier | 20% | $250,000 | $50,000 | Supplier's on-time record |
The ballast water risk stands out because it can cost a whole day, which means a canceled sailing.
The Ballast Water Decision
The ship must have an approved ballast water treatment system installed in this dry dock. There are three ways to do it. Option A buys the system as loose components that the yard installs and the supplier commissions in dock, at $3.9 million; based on experience on two other ships, there is about a 30 percent chance that commissioning problems delay undocking by a day. Option B buys a skid-mounted module tested at the factory, at $4.4 million, which reduces in-dock work and lowers the chance of a delay to about 8 percent. Option C fits pipework and foundations at sea by riding crew before the dry dock, then installs loose components in dock, at $4.1 million; this needs the classification society's approval for work at sea, which the marine team puts at 60 percent. If approved, the chance of delay falls to about 12 percent; if not, the ship reverts to option A at an extra $150,000 for wasted preparation.
Howard (1988) described decision analysis as a way of making a decision's structure, uncertainties and preferences explicit so that the choice follows from them. Solving the tree from right to left, using only the canceled-sailing revenue of $1.6 million as the cost of a lost day:
Decision tree results, revenue cost of a lost day only
| Option | Calculation | Expected cost |
|---|---|---|
| A: Loose components | $3.9 million + 0.30 x $1.6 million | $4.38 million |
| B: Factory-tested skid | $4.4 million + 0.08 x $1.6 million | $4.53 million |
| C: Pre-fit at sea | $4.1 million + 0.6 x (0.12 x $1.6 million) + 0.4 x ($0.15 million + 0.30 x $1.6 million) | $4.47 million |
On these numbers, option A has the lowest expected cost.
What the Narrow Calculation Leaves Out
A canceled cruise costs more than its revenue. Guests are refunded and offered future credit, travel agents rebook them elsewhere, and reviews and social media carry the story. Coral Lantern's commercial team estimates the added cost of a canceled sailing at about $600,000 beyond lost revenue, based on future credits redeemed and the drop in bookings after its last cancellation. Using $2.2 million as the cost of a lost day, option A's expected cost becomes $4.56 million, option B's $4.58 million and option C's about $4.58 million. The three options are now within about $20,000 of each other.
Choosing by Risk Efficiency
When expected costs are this close, the spread of outcomes decides. Chapman and Ward (2004) argue that good project practice seeks risk efficiency, the least risk for a given expected cost, and that managers should be wary of options that look cheap on average but expose the organization to large losses. Option A carries a 30 percent chance of losing a sailing; option B carries 8 percent; option C carries about 19 percent once the chance of rejection is included. For a company whose guests are already booked and whose brand depends on reliable departures, a 22-point drop in the chance of canceling a cruise is worth a few tens of thousands of dollars of expected cost. The project selects option B, the factory-tested skid, and the program will apply the same choice to the other two ships, where the bulk order lowers the skid's price.
Simulating Cost and Checking Contingency
Contingency covers growth work, chiefly steel renewal above the base estimate, coating delays, pod damage found on opening and smaller items. A Monte Carlo simulation of 10,000 runs used a triangular distribution for steel tonnage, from 40 to 70 to 140 tonnes at about $9,300 per tonne installed, and the probabilities and cost ranges from the ranking table for the other risks.
Simulated growth costs beyond the base estimate
| Percentile | Growth cost |
|---|---|
| 50th | about $2.9 million |
| 80th | about $4.4 million |
| 90th | about $5.3 million |
The $4.7 million contingency covers the 80th percentile with a small margin and falls short of the 90th. The steering group accepted that level: the remaining exposure is concentrated in steel renewal, which will be known on day 2 when the hull is gauged, and the program reserve can cover a shortfall. If gauging shows more than 110 tonnes, the project manager will ask the program manager to release reserve that same day.
Updating the Analysis
The analysis will be updated at three points: when hull gauging is complete on day 2, when the pods are opened on day 4 and at the halfway point. Each update replaces estimates with known values and reruns the simulation, so the contingency and the risk of a lost day are reported from current information.
Conclusion
Ranking by expected cost shows that the ballast water system and steel renewal dominate the dry dock's risk. A decision tree shows that installing loose components is cheapest on average if only lost revenue is counted, but once the full cost of a canceled cruise is included the options are nearly equal, and the factory-tested skid is chosen because it cuts the chance of losing a sailing from 30 to 8 percent. A cost simulation shows that the $4.7 million contingency covers about the 80th percentile, with the remaining exposure resolved early in the dry dock.
References
Chapman, C., & Ward, S. (2004). Why risk efficiency is a key aspect of best practice projects. International Journal of Project Management, 22(8), 619-632. https://doi.org/10.1016/j.ijproman.2004.05.001
Howard, R. A. (1988). Decision analysis: Practice and promise. Management Science, 34(6), 679-695. https://doi.org/10.1287/mnsc.34.6.679
Ward, S. (1999). Requirements for an effective project risk management process. Project Management Journal, 30(3), 37-43. https://doi.org/10.1177/875697289903000306
What the QSO 680 Module 8 instructions ask for
The QSO 680 Module 8 assignment usually asks students to perform quantitative risk analysis on a project. Expect to estimate probabilities and impacts, calculate expected monetary values, use a decision tree for at least one decision with uncertain outcomes and possibly run a Monte Carlo simulation of cost or schedule, then use the results to choose responses and set reserves. Strong papers explain where each probability and cost came from, draw the decision tree clearly and roll it back correctly, consider costs that a narrow calculation might leave out, recognize that the option with the lowest expected cost may carry unacceptable downside, use simulation percentiles rather than averages to size contingency and say how the analysis will be updated as information arrives.
How this QSO 680 Module 8 quantitative risk assignment example is built
The assignment quantifies the main risks in the Meridian Isle's 18-day dry dock at Coral Lantern Cruises, a fictional Miami line. A decision tree compares three ways to install the required ballast water system: loose components at $3.9 million with a 30 percent chance of a day's delay, a factory-tested skid at $4.4 million with an 8 percent chance and partial fitting at sea at $4.1 million if the classification society approves. Counting only lost revenue, loose components have the lowest expected cost; adding a canceled cruise's reputational cost brings the options close, and the skid is chosen for risk efficiency. A cost simulation puts the 80th percentile of contingency needs at about $4.4 million against $4.7 million held. Howard, Chapman and Ward and Ward are cited.
Where the QSO 680 Module 8 rubric puts the points
The QSO 680 quantitative risk rubric generally credits sourced probabilities and impacts, correct expected value calculations, a decision tree drawn and rolled back accurately, a cost or schedule simulation interpreted by percentiles, attention to consequences beyond direct cost, a choice that weighs downside risk as well as expected value, contingency set from the results and research on decision analysis and risk. Papers stand out when the numbers change a decision someone would otherwise have made. They lose credit for probabilities with no basis, for arithmetic errors in the tree, for using averages to size contingency or for choosing the lowest expected cost without asking what the worst case would do to the organization. The final points go to a tree a reader can follow and APA references that match.
QSO 680 Module 8 help: the mistakes that cost points
List your largest risks and estimate, for each, a probability and a cost, and say where the numbers came from: records, experts, suppliers. Multiply to rank them. For your biggest decision, draw a tree with choices as squares, chance events as circles and outcomes at the ends, then work backward from the right, averaging at circles and choosing at squares. Ask whether you have left out costs, such as reputation or customer goodwill. Compare options on expected cost and on how bad the bad outcomes are. If you can, simulate cost and read the 80th or 90th percentile to set contingency. Papers often stop at the expected value; the more useful question is which option the organization can live with if the unlucky branch happens.
Get QSO 680 Module 8 written to your instructions
Share the QSO 680 Module 8 instructions and your risk data. A writer ranks risks by expected value, builds a decision tree for the key choice, runs or interprets a cost simulation, explains the difference between lowest expected cost and risk efficiency, sets or checks contingency and supports the analysis with decision and risk research. A first QSO 680 assignment is free and normally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 680 papers and related MS Project Management samples
- QSO 680 Module 1 Discussion: Why a Dry Dock Is Complex
- QSO 680 Module 2 Program Assignment: Three Ships, One Fleet Program
- QSO 680 Module 3 Scope Selection Assignment: Choosing 610 of 812 Jobs
- QSO 680 Module 4 Discussion: A One-in-Three Chance of 18 Days
- QSO 680 Module 5 Resource Scheduling Assignment: Leveling Welders and Cranes
- QSO 680 Module 6 Critical Chain Assignment: Buffers Instead of Padding
- QSO 680 Module 7 Discussion: Two Ships, One Superintendent
- MKT 675 Module 10 Final Project: Marketing Ethics and Compliance Review
- FIN 620 Module 8 Derivatives Assignment: A Swap Offered to Fix a Variable-Rate Bond
- QSO 620 Module 3 Measure Phase Assignment: A Tester That Could Not Be Trusted
- MKT 660 Module 6 Milestone Two: Nonprofit Marketing Mix
QSO 680 Module 8 questions, answered
Where can I find a free QSO 680 Module 8 quantitative risk sample?
This page carries the full QSO 680 Module 8 assignment: a decision tree and contingency check for an invented cruise ship's dry dock.
What is a decision tree in project risk management?
A diagram of choices, chance events and outcomes, solved backward to find the choice with the best expected value.
What is risk efficiency?
Choosing options that give the lowest risk for a given expected cost, or the lowest expected cost for a given level of risk.
How is contingency set from a Monte Carlo cost simulation?
By taking the cost at a chosen confidence level, such as the 80th percentile, and subtracting the base estimate.
Why not always choose the lowest expected cost?
Because an option with a lower average can carry a higher chance of a severe outcome that the organization cannot absorb.