Half the Tolerance in the Tester: Measuring Cloverdell's Baseline
[Student Name]
Southern New Hampshire University
QSO 620: Six Sigma Quality Management
Measure Phase Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Half the Tolerance in the Tester: Measuring Cloverdell's Baseline
Introduction
The define phase settled the characteristic that matters for the sports caps: a removal torque of no less than 12 and no more than 18 inch-pounds, read a day after capping. The plant's hourly audits already record torque, and those records showed a standard deviation of about 1.35 inch-pounds. Before using that figure, the team needed to know how much of it came from the caps and how much from the way they were measured. This assignment reports the gauge study, the repairs it prompted, the baseline data collected afterward and the process's capability.
Operational Definition
Removal torque is measured on the bottler's standard 500-milliliter bottle, capped on the lab's capper set to the force in Cloverdell's product sheet, conditioned for 24 hours at room temperature and opened on a torque tester that records the peak twisting force needed to break the seal. The definition matters because torque falls over the first day as the plastic relaxes; a reading taken at one hour would be several inch-pounds higher.
Gauge Study
Burdick et al. (2003) review methods for measurement systems analysis and recommend designs that separate repeatability, how much one technician's readings of a single cap scatter, from reproducibility, how far different technicians' averages drift apart. Ten caps from across the normal range were selected, each capped on identical bottles prepared in triplicate, and three lab technicians measured each one three times in random order on the plant's hand-held testers.
Gauge study results, hand-held testers
| Source | Standard deviation, inch-pounds | Share of tolerance, six standard deviations over 6 inch-pounds |
|---|---|---|
| Repeatability | About 0.41 | About 41% |
| Reproducibility | About 0.32 | About 32% |
| Total measurement system | About 0.52 | About 52% |
A measurement system that uses more than about 30 percent of the tolerance is generally considered unacceptable for judging parts, and this one used more than half. Watching the technicians showed why. Bottles slipped in the fixture when gripped by hand, and each technician twisted at a different speed; faster twists gave higher peaks.
Fixing the Measurement
The lab installed a clamp fixture that holds the bottle at its base, replaced the hand-held testers with a motorized tester that twists at a constant speed and added monthly calibration against a reference standard. The study was repeated with the same design.
Gauge study results after repair
| Source | Standard deviation, inch-pounds | Share of tolerance |
|---|---|---|
| Repeatability | About 0.14 | About 14% |
| Reproducibility | About 0.08 | About 8% |
| Total measurement system | About 0.16 | About 16% |
At about 16 percent of tolerance, the system is adequate for judging caps and for the analysis to come. It also explains part of the original problem: the plant had been rejecting some good lots and passing some bad ones on the strength of readings that were partly noise.
Data Collection
With the repaired system, five caps were taken from one randomly chosen cavity of each running mold every hour for 40 production hours across all shifts and all four molds, giving 40 subgroups of five. Taking the five caps close together in time makes each subgroup a snapshot of the process at that hour, so that variation within subgroups shows short-term noise and variation between subgroups shows shifts over time. Mold, cavity, shift and resin lot were recorded for every cap for use in the analyze phase.
Stability
An average and range chart of the 40 subgroups showed two subgroups above the upper limit on the averages chart, both taken in the first hour after a mold was reinstalled following maintenance, when the mold had not yet reached operating temperature. These have an identifiable cause and were excluded. The remaining 38 subgroups showed no points outside the limits and no unusual runs, so the process was judged stable enough to estimate its capability. A histogram of the 190 readings was roughly symmetric and a normal probability plot showed no strong departure from normality.
Capability
From the stable data, the mean removal torque is about 15.6 inch-pounds and the standard deviation about 1.15. Wu et al. (2009) review capability indices and caution that they assume a stable, approximately normal process and should be interpreted with their sampling uncertainty.
Baseline capability
| Measure | Value |
|---|---|
| Cp, specification width divided by six standard deviations | About 0.87 |
| Cpk, gap from the average to the closer limit over three standard deviations | About 0.70 |
| Expected share above 18 inch-pounds | About 1.84% |
| Expected share below 12 inch-pounds | About 0.09% |
| Defects per million caps | About 19,300 |
| Sigma level, with the conventional 1.5-sigma shift | About 3.6 |
The process has two problems. Its spread is too wide to fit the window even if centered, since Cp is below 1, and its mean sits 0.6 inch-pounds above the center, so nearly all defects are caps that are too tight. Montgomery and Woodall (2008) note that the sigma level is a convention that assumes a long-term drift of 1.5 standard deviations; the defect rate per million is the more direct measure and is reported first.
What the Gauge Repair Changed
The repaired tester also changes how the plant should read its past. With the old testers, about one lot in five that failed the hourly audit would have passed a retest, and some lots that passed would have failed. The 14 lots held for resorting last year were therefore not all bad, and some lots shipped without holds probably were. The plant has stopped using single audit readings to hold lots; a lot is now held only when a subgroup average on the repaired tester falls outside the window.
Baseline Against the Goal
The charter's target is a Cpk of 1.33 or higher. With the mean centered at 15, that requires a standard deviation of about 0.75 inch-pounds or less, about two-thirds of the current figure. Centering alone would raise Cpk only to about 0.87. The project therefore needs both to center the process and to reduce its variation by about a third.
Conclusion
The torque testers originally used about half the tolerance, which made earlier data unreliable; a clamp fixture, motorized tester and calibration brought measurement error to about 16 percent. With trustworthy data, the molding process is stable, centered too high and too variable, with a Cpk of about 0.70 and about 19,300 caps per million outside the window. The analyze phase will look for the sources of both the high mean and the spread.
References
Burdick, R. K., Borror, C. M., & Montgomery, D. C. (2003). A review of methods for measurement systems capability analysis. Journal of Quality Technology, 35(4), 342-354. https://doi.org/10.1080/00224065.2003.11980232
Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329-346. https://doi.org/10.1111/j.1751-5823.2008.00061.x
Wu, C.-W., Pearn, W. L., & Kotz, S. (2009). An overview of theory and practice on process capability indices for quality assurance. International Journal of Production Economics, 117(2), 338-359. https://doi.org/10.1016/j.ijpe.2008.11.008
What the QSO 620 Module 3 instructions ask for
In Module 3, QSO 620 students move from defining a problem to measuring it, and the first thing to measure is the measurement. Expect to write an exact definition of how the characteristic is read, plan who samples what and when, run a study in which several people test the same items more than once, judge whether the instrument is good enough, collect baseline data in small groups over time, look at a control chart before trusting any summary and express current performance as capability indices and defects per million. Strong papers repair a weak gauge and repeat the study, compare measurement error with both the tolerance and the spread of the process, explain what each index assumes and close by stating how far the baseline sits from the charter's target.
How this QSO 620 Module 3 measure phase assignment example is built
The assignment runs the measure phase of the torque project at Cloverdell Closures, a fictional bottle cap maker. A gauge study with ten caps, three operators and three repeat readings shows the plant's hand-held testers contributing a standard deviation of about 0.52 inch-pounds, about 52 percent of the six-inch-pound tolerance, because bottles slip in the fixture and operators twist at different speeds. A clamp fixture, a motorized tester and monthly calibration cut that to about 16 percent. With the repaired system, 40 hourly subgroups of five caps show a stable process apart from two subgroups after a mold change, with a mean of about 15.6 and a standard deviation of about 1.15. Cpk is about 0.70, implying about 19,300 caps per million outside the window. Burdick and colleagues, Wu and colleagues and Montgomery and Woodall inform it.
Where the QSO 620 Module 3 rubric puts the points
The QSO 620 measure phase assignment typically rewards clear operational definitions, a sound data collection plan, a properly designed and analyzed gauge study, measurement error judged against tolerance and process variation, corrective action on the gauge with a repeat study, a stability check before capability is calculated, correct capability indices and defect rates with stated assumptions and a baseline compared with the goal. The strongest papers show how measurement error distorted the original picture. Credit drops when data are used without a gauge study, capability is computed for an unstable process, indices are calculated from specification limits on a control chart, normality is assumed without checking or the paper never says how far the baseline falls short of the charter's target. Tables, clear writing and APA citations complete the grade.
QSO 620 Module 3 help: the mistakes that cost points
Write an exact definition of the measurement: what is measured, with which instrument, under which conditions and when. Before collecting baseline data, run a gauge study: several parts that span the normal range, measured repeatedly by several operators in random order. Separate the variation from repeated readings by one operator from the variation between operators, and compare the total with the tolerance and with the process spread. If the gauge uses too much of either, fix it and repeat the study. Then collect data in rational subgroups over time, plot a control chart and remove only causes you can identify. Calculate Cp and Cpk from the stable data and convert to defects per million. A common error is computing capability from data whose spread is half measurement noise.
Get QSO 620 Module 3 written to your instructions
Share the QSO 620 Module 3 instructions and describe your measurement and data. A writer designs and analyzes a gauge repeatability and reproducibility study, judges the measurement system against tolerance and process variation, plans data collection, checks stability with control charts, calculates capability indices and defects per million and states the baseline against the goal, citing quality research. Your first QSO 620 paper is free, done in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 620 papers and related MS Operations Management samples
- QSO 620 Module 1 Discussion: What Six Sigma Adds
- QSO 620 Module 2 Define Phase Assignment: The Charter and the Torque Window
- QSO 620 Module 4 Discussion: Why Adjusting After Every Reading Backfires
- QSO 620 Module 5 Analyze Phase Assignment: The Cavities and Settings Behind the Spread
- QSO 620 Module 6 Improve Phase Assignment: A Designed Experiment on the Molding Press
- QSO 620 Module 7 Discussion: Operators Who Trusted Their Feel
- QSO 620 Module 8 Control Phase Assignment: Control Charts and a Reaction Plan
- QSO 620 Module 9 Final Project: The DMAIC Project Report
- QSO 620 Module 10 Discussion: Keeping the Program Alive After the First Win
- MKT 660 Module 3 Milestone One: Target Audiences and Objectives
- MGT 550 Module 6 Discussion: One Announcement, Six Languages
- OL 640 Module 9 Final Project: Franchise Plan
- MBA 540 Module 8 Final Project Strategic Planning Proposal: Strategic proposal to enter Mexico
QSO 620 Module 3 questions, answered
Where can I find a free QSO 620 Module 3 Measure Phase Assignment sample?
The complete QSO 620 Module 3 assignment is on this page: a gauge study and baseline capability for cap removal torque at an invented manufacturer.
What is a gauge repeatability and reproducibility study?
A study in which several operators measure the same parts several times, separating variation from the instrument itself from variation between operators.
What is process capability?
How well a stable process fits within its specification limits, often summarized by indices such as Cp and Cpk.
How does Cp differ from Cpk?
Cp asks whether the process spread could fit inside the window at all; Cpk asks whether it actually does, given where the average sits.
Why check stability before calculating capability?
Because capability indices assume a stable, predictable process; an unstable process has no single capability to report.