| Course | QSO 620 Six Sigma Quality Management |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment identifying root causes with stratification, Pareto analysis, cause-and-effect brainstorming, regression and hypothesis tests and verifying each cause with data |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 620 Module 5
Nine Cavities, a Winter Setting and a Habit: Analyzing Cloverdell's Torque Spread
[Student Name]
Southern New Hampshire University
QSO 620: Six Sigma Quality Management
Analyze Phase Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Nine Cavities, a Winter Setting and a Habit: Analyzing Cloverdell's Torque Spread
Introduction
The measure phase showed the sports caps' torque centered near 15.6 inch-pounds, too high, and spread too widely, about 1.15 inch-pounds from typical cap to typical cap. The analyze phase asks why. In DMAIC this phase is diagnosis, narrowing a broad field of possible causes to those that demonstrably explain the problem (de Mast & Lokkerbol, 2012). This assignment reports that diagnosis.
Possible Causes
The team, including two press operators, a process technician and a maintenance technician, produced a cause-and-effect diagram with 31 possible causes under six headings: materials, such as resin lot, moisture and colorant; methods, such as cooling time, hold pressure and how operators adjust; machines, such as mold wear, cooling channels and press condition; people, such as training and shift; measurement, already addressed; and environment, such as chilled water and plant temperature. Asked which cause they suspected most, eight of nine team members chose resin moisture, because problems seemed to come in batches.
Where Defects Concentrate
The baseline data recorded mold, cavity, shift and resin lot for every cap. Each of the four molds has 32 cavities, 128 in all. A further sample of five caps from every cavity, taken over three days, gave cavity-level averages.
Too-tight caps by cavity group, three-day cavity sample
| Cavity group | Number of cavities | Average torque, inch-pounds | Share of caps above 18 |
|---|---|---|---|
| Nine cavities on molds 2 and 4, outer positions | 9 | About 17.4 | About 58% of all too-tight caps |
| Remaining cavities on molds 2 and 4 | 55 | About 15.4 | About 27% |
| Molds 1 and 3 | 64 | About 15.3 | About 15% |
Nine cavities, about 7 percent of the total, produced well over half of the too-tight caps. A Pareto chart of too-tight caps by cavity showed the same nine at the top. When the maintenance technician opened the cooling circuits for those cavities, scale had partly blocked the water channels at the outer edges of both molds. Cavities that run hotter shrink more as the parts cool, giving smaller thread diameters and tighter caps.
Thread Diameter and Torque
To check the mechanism, the lab measured the thread diameter of 120 caps from across all cavities and tested their torque. A regression of torque on thread diameter showed a strong relationship, with an R-squared of about 0.55: torque rose by about 1.6 inch-pounds for each 0.1-millimeter reduction in diameter. The nine hot cavities produced caps about 0.12 millimeters smaller on average than the rest.
Shift and Adjustment
An analysis of variance of baseline subgroup averages by shift found a difference: the night shift's mean was about 15.9 inch-pounds, against about 15.5 on the other two, with a p-value of about 0.01. Logs showed that the night shift adjusted hold pressure about twice as often as the day shifts, consistent with the over-adjustment found in Module 4, and the experiment in that module showed that removing the adjustments cut the spread.
Chilled Water and Cooling Time
Torque varied with the season. Over the past year, monthly average torque rose from about 15.2 in winter to about 16.1 in July and August. The chilled water that cools the molds runs about 4 degrees Celsius warmer in summer, and the cooling time on the presses, 3.5 seconds, had been set in January and never changed. A regression of daily average torque on chilled water temperature found an increase of about 0.2 inch-pounds per degree, with a p-value below 0.001.
A Rejected Suspect
The team's favorite suspect, resin moisture, was tested by comparing torque across the 14 resin lots used during the baseline, with moisture measured at the dryer outlet for each. An analysis of variance found no difference between lots beyond chance, with a p-value of about 0.41, and moisture readings showed no relationship with torque. The batches of problems the team remembered had in fact followed hot weeks and mold changes, not resin deliveries. Choo et al. (2007) found that quality teams learn most when a structured method lets them test and revise their beliefs; the resin result changed the team's view of the problem more than any other.
How the Causes Interact
The three causes are not independent. In summer, warmer chilled water makes every cavity run hotter, and the nine cavities with partly blocked channels run hotter still, so the blocked cavities' torque rose more in July than the others', by about 1.2 inch-pounds against 0.7. Operators saw more high readings in summer and adjusted more often, which is why the night shift's over-adjustment was worst in hot weeks. A regression of daily average torque on chilled water temperature, the share of production from the nine cavities and the number of pressure adjustments accounted for roughly seven-tenths of how much daily averages moved, and each term remained significant with the others included. This matters for the improve phase: cleaning the channels alone would leave the summer effect, and setting cooling time alone would leave the blocked cavities, so the fixes must be made together.
How Much Each Cause Explains
Verified causes and their estimated contribution
| Cause | Evidence | Estimated effect |
|---|---|---|
| Partly blocked cooling channels in nine cavities | Stratification, inspection, thread diameter regression | About 40% of too-tight caps; raises overall mean about 0.3 inch-pounds |
| Cooling time not adjusted for warmer summer water | Seasonal pattern, chilled water regression | Raises mean about 0.8 inch-pounds in summer |
| Over-adjustment of hold pressure | Shift analysis of variance, Module 4 comparison | Raises standard deviation by about 0.2 inch-pounds |
Zu et al. (2008) describe Six Sigma's structured procedures as a distinctive contribution to quality management, and here the structure moved the team from a confident wrong answer to three causes, each supported by data and a physical explanation.
Conclusion
The high and variable torque has three verified causes: partly blocked cooling channels in nine cavities, a cooling time set for winter water and operators' habit of adjusting hold pressure after individual readings. Resin moisture, the team's first suspect, does not affect torque. The improve phase will clean the channels, stop the adjustments and run a designed experiment to set cooling time, water temperature and hold pressure together.
References
Choo, A. S., Linderman, K. W., & Schroeder, R. G. (2007). Method and context perspectives on learning and knowledge creation in quality management. Journal of Operations Management, 25(4), 918-931. https://doi.org/10.1016/j.jom.2006.08.002
de Mast, J., & Lokkerbol, J. (2012). An analysis of the Six Sigma DMAIC method from the perspective of problem solving. International Journal of Production Economics, 139(2), 604-614. https://doi.org/10.1016/j.ijpe.2012.05.035
Zu, X., Fredendall, L. D., & Douglas, T. J. (2008). The evolving theory of quality management: The role of Six Sigma. Journal of Operations Management, 26(5), 630-650. https://doi.org/10.1016/j.jom.2008.02.001
What the QSO 620 Module 5 instructions ask for
The QSO 620 Module 5 assignment usually asks students to complete the analyze phase of a Six Sigma project. Expect to generate potential causes with tools such as cause-and-effect diagrams, prioritize them, collect or analyze data to test them with methods such as Pareto charts, scatter plots, regression, analysis of variance and hypothesis tests and identify the root causes that explain the problem. Strong assignments start broad and narrow with data, stratify results by machine, location, shift or material to see where problems concentrate, test each suspected cause with a suitable method, explain the physical mechanism behind each verified cause, report suspects that were rejected and say how much of the problem each verified cause explains.
How this QSO 620 Module 5 analyze phase assignment example is built
The assignment searches for causes of high and variable removal torque at Cloverdell Closures, a fictional bottle cap maker. A cause-and-effect diagram lists 31 possible causes, and data narrow them. Stratifying by cavity shows 9 of 128 cavities averaging above 17 inch-pounds and producing about 58 percent of too-tight caps; inspection finds scale partly blocking their cooling channels. A regression shows torque rising about 1.6 inch-pounds for each tenth of a millimeter of thread shrinkage. An analysis of variance finds the night shift's mean about 0.4 higher, traced to over-adjustment, and torque rises with chilled water temperature because cooling time was set for winter. Resin moisture, the team's favorite suspect, shows no effect. De Mast and Lokkerbol, Choo and colleagues and Zu and colleagues inform it.
Where the QSO 620 Module 5 rubric puts the points
The QSO 620 analyze phase assignment is commonly graded on a broad initial list of causes, sensible prioritization, stratification that locates where problems concentrate, appropriate statistical tests for each suspect, correct interpretation of results, physical verification of each statistical finding, honest reporting of rejected causes and an estimate of how much each verified cause explains. The strongest papers show data overturning a confident assumption. Credit drops when causes are chosen by vote, correlation is taken as proof without a mechanism, tests are misapplied, rejected suspects are omitted or the analysis stops at symptoms rather than causes. Tables, clear writing and APA citations complete the grade.
QSO 620 Module 5 help: the mistakes that cost points
Begin with a cause-and-effect diagram built with the people who run the process, grouping ideas under materials, methods, machines, people, measurement and environment. Then let data decide. Break the defect data down by every factor you recorded, such as machine, mold position, shift and material lot, and look for groups that stand out; a Pareto chart shows which few groups produce most defects. For each suspect, choose a test: regression for a continuous input, analysis of variance or a t-test for groups, a chi-square test for counts. Confirm each statistical finding by looking at the process itself, since a number without a mechanism may be coincidence. Report rejected suspects too. Analyses often go wrong when a team tests only the cause it already believes in.
Get QSO 620 Module 5 written to your instructions
Share the QSO 620 Module 5 instructions and your project data. A writer builds a cause-and-effect list with the team's input, stratifies the data to locate where defects concentrate, uses Pareto charts, regression, analysis of variance and hypothesis tests to confirm or reject each suspect, inspects the physical process to explain the findings and states the verified root causes, citing Six Sigma research. Your first QSO 620 paper is free, completed within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 620 papers and related MS Operations Management samples
- QSO 620 Module 1 Discussion: What Six Sigma Adds
- QSO 620 Module 2 Define Phase Assignment: The Charter and the Torque Window
- QSO 620 Module 3 Measure Phase Assignment: A Tester That Could Not Be Trusted
- QSO 620 Module 4 Discussion: Why Adjusting After Every Reading Backfires
- QSO 620 Module 6 Improve Phase Assignment: A Designed Experiment on the Molding Press
- QSO 620 Module 7 Discussion: Operators Who Trusted Their Feel
- QSO 620 Module 8 Control Phase Assignment: Control Charts and a Reaction Plan
- QSO 620 Module 9 Final Project: The DMAIC Project Report
- QSO 620 Module 10 Discussion: Keeping the Program Alive After the First Win
- MBA 687 Module 5 Milestone Two Change Management Plan: Draft change plan for One Platform
- FIN 700 Module 2 Company and Industry Analysis: Brick, Block and the Texas Building Cycle
- OL 665 Module 10 Discussion: Nonprofit Accountability
- QSO 645 Module 2 Business Case Assignment: Repair, Replace or Go Fully Digital
QSO 620 Module 5 questions, answered
Where can I find a free QSO 620 Module 5 Analyze Phase Assignment sample?
The complete QSO 620 Module 5 assignment is on this page: finding the causes of cap torque variation at an invented manufacturer.
What is a cause-and-effect diagram?
A fishbone-shaped sketch, named for Kaoru Ishikawa, on which a team hangs every suspected cause under headings like materials, methods and machines.
What is stratification in quality analysis?
Splitting data into groups by factors such as machine, location or shift to see whether problems concentrate in particular groups.
What does a Pareto chart show?
Categories of defects or causes ordered from most to least frequent, showing which few account for most of the problem.
Why verify statistical findings physically?
Because a statistical association may be coincidence or the effect of another factor, and finding the physical mechanism confirms that it is a real cause.