QSO 620 Module 9 Final Project Example

Reviewed by Portia Lambrick, MBA

This QSO 620 Module 9 Final Project sample reports a complete Six Sigma project through all five phases with data, verified results, financial benefits and lessons for the next project. SNHU QSO 620 (QSO-620) closes its MS Operations Management Six Sigma course with this report. The project took removal torque on bottle caps at Cloverdell Closures, an invented cap maker, from a process its customers were preparing to abandon to one that comfortably meets their window. The report walks plant leaders through each phase in turn, shows what each one found and changed, counts the money honestly and says what the team would do differently.

CourseQSO 620 Six Sigma Quality Management
ModuleModule 9
Paper typegraduate final project report presenting a complete Six Sigma project through all five phases with data, verified results, financial benefits and lessons
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 620 Module 9

1

From Cpk 0.70 to 1.38: The Cloverdell Torque Project Report

[Student Name]

Southern New Hampshire University

QSO 620: Six Sigma Quality Management

Final Project

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingCloverdell Closures, its data, results and savings in this QSO 620 project are invented.
2

From Cpk 0.70 to 1.38: The Cloverdell Torque Project Report

Summary

Cloverdell's sports-cap line went from a capability index of about 0.70, with roughly 19 caps in every thousand falling outside the customers' window, to about 1.38 over eight weeks of controlled production, roughly 20 caps per million outside. No torque complaints have been received since the new settings were locked. Net savings are about $340,000 a year for about $48,000 in one-time costs, and two bottlers that had begun qualifying a second supplier have stopped. The process now belongs to the molding supervisor under a signed control plan.

What this page is doingGives the results first.
3

Define

Interviews with five bottlers and a review of 23 complaints turned "caps too tight or too loose" into one critical-to-quality characteristic: a twist-off force from 12 to 18 inch-pounds a day after capping. The scope covered molding and liner insertion on four 32-cavity molds at the Georgia plant. The business case put the annual cost of credits, holds, resorting and scrap at about $470,000. The goal was a Cpk of at least 1.33 within six months.

What this page is doingSets the problem and goal.
4

Measure

Measurement system before and after repair

MeasureBeforeAfter
Measurement standard deviationAbout 0.52 inch-poundsAbout 0.16 inch-pounds
Share of tolerance used by measurementAbout 52%About 16%

A gauge study found that the hand-held testers used about half the tolerance, because bottles slipped and operators twisted at different speeds. A clamp fixture, a motorized tester and monthly calibration fixed it; methods for this kind of study are reviewed by Burdick et al. (2003). With trustworthy data, the process was stable apart from start-ups after mold changes, with a mean of about 15.6 and a standard deviation of about 1.15: centered too high and too variable.

What this page is doingFixes the gauge and sets the baseline.
5

Analyze

Stratifying by cavity showed that 9 of 128 cavities produced about 58 percent of too-tight caps, and maintenance found scale blocking their cooling channels. A regression tied torque to thread diameter. Torque rose about 0.2 inch-pounds per degree of chilled water, because cooling time had been set for winter. Night-shift averages ran higher, tied to operators adjusting pressure after single readings. Resin moisture, the team's first suspect, had no effect. Diagnosis of this kind, which narrows many suspects to a few proven causes, is the core of the method (de Mast & Lokkerbol, 2012).

What this page is doingVerifies causes.
6

Improve

After descaling and ending over-adjustment, an eight-run factorial experiment with three center points varied the water temperature, the hold pressure and the cooling time together. Box and Wilson (1951) showed how such experiments locate better operating conditions efficiently. Warmer water and longer cooling reduced the spread; hold pressure moved the average, more strongly when the water was warm. The confirmed recipe, water at 18 °C, a 3.8-second cool and pressure raised about 2 percent, gave an average of 15.05 and a standard deviation of 0.70 in three runs.

What this page is doingTests and confirms new settings.
7

Control

Hourly charts whose limits were set from the improved process, a reaction plan that never adjusts pressure on a single signal and a control plan covering water temperature, locked recipes, quarterly descaling and monthly calibration now govern the line. In eight weeks the charts caught one real problem, a stuck chiller valve, within an hour.

What this page is doingHolds the gain.
8

Results Against the Goal

Results

MeasureBaselineAfter eight weeksGoal
Average torqueAbout 15.6About 15.05Centered near 15
Standard deviationAbout 1.15About 0.71About 0.75 or less
CpkAbout 0.70About 1.38At least 1.33
Caps per million outside windowAbout 19,300About 20Under about 60
Torque complaints23 a yearNone in eight weeksDown 80% within a year
What this page is doingCompares before and after.
9

Financial Benefits

Annual savings and costs

ItemAnnual amountBasis
Credits and chargebacks avoidedAbout $240,000Last year's $280,000 less an allowance of about $40,000 for remaining complaints
Holds and resorting avoidedAbout $120,000Last year's $135,000 less about $15,000 for audit holds
Scrap avoidedAbout $45,000Last year's $55,000 less about $10,000
Added cycle timeAbout minus $55,0003% longer cycle on four molds
Quarterly descalingAbout minus $12,000Maintenance labor and chemicals
Net annual savingsAbout $340,000

One-time costs were about $48,000: the motorized tester and fixture, about $22,000, and the initial descaling of two molds, about $26,000. The figures are estimates from eight weeks of results and will be audited by finance after twelve months, as Montgomery and Woodall (2008) recommend tying Six Sigma claims to verified financial outcomes.

What this page is doingCounts savings net of costs.
10

What Customers Said Afterward

Two months after the new settings were locked, the project leader called the five bottlers interviewed in the define phase. All five reported fewer consumer complaints about caps that were hard to open, and the two that had begun qualifying a second supplier said they had paused the work. One asked for Cloverdell's capability data each quarter, which the plant now sends. One complaint was received in the period, about a leaking case, and the lab traced it to a damaged liner from a supplier lot rather than to torque. These conversations are not a substitute for a year of complaint data, but they confirm that the improvement is visible where it matters.

What this page is doingChecks the result outside the plant.
11

Lessons

Testing the gauge first was decisive: without it, the team would have chased noise. Including operators would have avoided the night-shift resets, since they saw none of the experiment. The team's confident first theory was wrong, which argues for testing every suspect. And the seasonal cause would have recurred next summer if water temperature had not been brought under control.

What this page is doingRecords what to keep and change.
12

Next Steps

The same descaling and settings approach should be applied to the 38-millimeter juice caps at the Georgia plant, which show a similar summer pattern, and the gauge repair to the Texas plant's lab, whose testers are the same model. A second Green Belt has been nominated to lead the juice cap project.

What this page is doingExtends the work.
13

Conclusion

Following DMAIC in order, the team fixed the measurement before trusting it, let data overturn its first theory, set process conditions with a designed experiment and left controls that caught the first problem within an hour. The project met its goal, saved about $340,000 a year net and has been handed to its owner. Approval is requested to close it and launch the juice cap project.

What this page is doingCloses the project.
14

References

Box, G. E. P., & Wilson, K. B. (1951). On the experimental attainment of optimum conditions. Journal of the Royal Statistical Society: Series B (Methodological), 13(1), 1-38. https://doi.org/10.1111/j.2517-6161.1951.tb00067.x

Burdick, R. K., Borror, C. M., & Montgomery, D. C. (2003). A review of methods for measurement systems capability analysis. Journal of Quality Technology, 35(4), 342-354. https://doi.org/10.1080/00224065.2003.11980232

de Mast, J., & Lokkerbol, J. (2012). An analysis of the Six Sigma DMAIC method from the perspective of problem solving. International Journal of Production Economics, 139(2), 604-614. https://doi.org/10.1016/j.ijpe.2012.05.035

Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329-346. https://doi.org/10.1111/j.1751-5823.2008.00061.x

What the QSO 620 Module 9 instructions ask for

The QSO 620 final project typically asks students to present a complete Six Sigma project from define through control. Expect to summarize the problem and charter, describe how the measurement system and baseline were established, explain the analysis and root causes, present the improvements and how they were tested, describe the controls put in place, report results against the goal and estimate financial benefits. Strong reports open with results, show the decisive data from each phase, explain how measurement problems were handled, include rejected hypotheses as well as verified causes, report confirmed rather than projected results where possible, calculate net savings with costs subtracted, describe the handoff and draw lessons for future projects.

How this QSO 620 Module 9 final project example is built

The project reports the removal torque project at Cloverdell Closures, a fictional bottle cap maker. The define phase set the customer window at 12 to 18 inch-pounds and the cost at about $470,000 a year. The measure phase found the testers using about half the tolerance, fixed them and set a baseline Cpk of about 0.70. The analyze phase verified three causes, blocked cooling channels in 9 of 128 cavities, a cooling time set for winter and over-adjustment, and rejected resin moisture. A factorial experiment set water temperature, cooling time and pressure, and control charts held a Cpk of about 1.38 for eight weeks with no complaints. Net savings are about $340,000 a year. Montgomery and Woodall, de Mast and Lokkerbol, Burdick and colleagues and Box and Wilson inform it.

Where the QSO 620 Module 9 rubric puts the points

Markers of the QSO 620 final project expect a clear summary of results against the goal, an accurate account of each DMAIC phase with its key data, treatment of measurement system problems, verified root causes and rejected hypotheses, improvements tested and confirmed, controls with owners, net financial benefits calculated with their basis, a documented handoff and lessons for future work. The strongest reports let a reader see why each decision was made. Credit drops when phases are described without data, results are projected rather than confirmed, savings are gross rather than net, rejected causes are hidden, controls lack owners or lessons are generic. Tables, clear writing and APA citations complete the grade.

QSO 620 Module 9 help: the mistakes that cost points

Open with a single page that states the problem, the target, what was achieved and the money. Then give each phase a section built around its decisive evidence, the gauge study in measure, the stratification and tests in analyze, the experiment and confirmation in improve and the charts in control, with one or two tables each. Report what was tried and did not work as well as what did. For results, use data collected after the change, not predictions, and compare them with the baseline and the goal. Calculate savings net of every cost the project created, including slower cycle times, and state the basis for each figure. Describe who now owns the process. Close with lessons and the next project. Reports lose credibility when savings are counted before costs or when a projected improvement is reported as achieved.

Get QSO 620 Module 9 written to your instructions

Send the QSO 620 final project guidelines with your phase deliverables. A writer assembles the define, measure, analyze, improve and control work into one report, presents the key data and decisions of each phase, verifies the results, calculates net financial benefits with their basis, records lessons and recommends next steps, citing Six Sigma research. Your first QSO 620 paper is free, finished within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 620 papers and related MS Operations Management samples

QSO 620 Module 9 questions, answered

Where can I find a free QSO 620 Module 9 Final Project sample?

Read the full QSO 620 Module 9 final project here: a DMAIC report on bottle cap removal torque at an invented manufacturer.

What should a Six Sigma project report include?

A results summary, the work and key data of each DMAIC phase, verified causes and rejected ideas, confirmed results, net financial benefits, controls, handoff and lessons.

How should Six Sigma savings be calculated?

From measured reductions in costs such as complaints, scrap and rework, minus the costs the project added, with the basis of each figure stated.

Why report rejected hypotheses?

Because they show the analysis was tested rather than assumed and save future teams from chasing the same suspects.

When is a Six Sigma project complete?

When results are confirmed with data against the goal, controls are in place with owners and the process has been handed to its owner.