Module Seven Discussion
The Caps Felt Wrong, So They Changed Them Back
The new molding settings for Cloverdell Closures' sports caps went live on a Monday: warmer chilled water, a longer cooling time and slightly higher hold pressure, the combination our experiment found would center removal torque and cut its spread. On Wednesday, Thursday and Friday nights, the hold pressure on two presses was found back at the old value. The operators on those presses have more than 40 years of experience between them. They said the caps felt wrong coming off the mold. Their supervisor told me, not unkindly, that numbers from the lab do not run a press.
My first reaction was frustration. My second was to remember the analyze phase. For years these same operators had said that summer caps "run tight," and they were right: the data showed torque rising with chilled water temperature. Their fix, lowering pressure after each high reading, made the spread worse, but their sense of the problem was sound. Anderson et al. (1994) describe how the Deming method depends on drawing on the knowledge of the people who do the work, and we had not. The experiment ran on the day shift. The night operators saw none of it.
Choo et al. (2007) found that quality projects produce more learning when teams combine a structured method with exploration and knowledge from the people involved. So: walk the two operators through the experiment's results on their own presses, cap by cap, and let them test the old and new settings side by side for a shift. Lock the settings in the press recipe so a change needs a supervisor and engineer to sign off, which protects everyone from an accidental reset. Give operators the control chart and authority to stop the line on a signal, and ask one of the two veterans to co-own the control plan. Zu et al. (2008) note that Six Sigma's role structure assigns clear responsibility for results; responsibility should include the people closest to the press.
What might the people resisting your change be right about?
References
Anderson, J. C., Rungtusanatham, M., & Schroeder, R. G. (1994). A theory of quality management underlying the Deming management method. The Academy of Management Review, 19(3), 472-509. https://doi.org/10.5465/amr.1994.9412271808
Choo, A. S., Linderman, K. W., & Schroeder, R. G. (2007). Method and context perspectives on learning and knowledge creation in quality management. Journal of Operations Management, 25(4), 918-931. https://doi.org/10.1016/j.jom.2006.08.002
Zu, X., Fredendall, L. D., & Douglas, T. J. (2008). The evolving theory of quality management: The role of Six Sigma. Journal of Operations Management, 26(5), 630-650. https://doi.org/10.1016/j.jom.2008.02.001
What the QSO 620 Module 7 instructions ask for
The Module 7 discussion in QSO 620 typically focuses on leadership, culture and change in Six Sigma. Expect to discuss why people resist process changes, how leaders and project teams can involve employees, the role of belts, champions and sponsors and how to make improvements stick. Strong posts describe a specific instance of resistance, consider what the resisters know that the team does not, avoid treating resistance as stubbornness, propose concrete steps such as sharing evidence on the workers' own equipment, building the change into standard settings and giving workers real authority, and connect the steps to research on quality management and learning. The best replies ask which part of the resisters' objection a classmate's team should take seriously.
How this QSO 620 Module 7 discussion example is built
The post describes the week after new molding settings went live at Cloverdell Closures, a fictional bottle cap maker. Two senior night-shift operators, with more than 40 years of experience between them, set hold pressure back to the old value on three nights, saying the caps felt wrong, and a supervisor said that lab numbers do not run a press. The post treats the resistance as information, notes that the operators had sensed the summer problem for years even though their fix was wrong, and proposes showing them the experiment's results on their own presses, locking settings in the press recipe with a sign-off to change them and giving operators the control chart and authority to stop the line. Choo and colleagues, Anderson and colleagues and Zu and colleagues inform the post.
Where the QSO 620 Module 7 rubric puts the points
The Module 7 QSO 620 thread credits a specific account of resistance, a fair reading of what the resisters know, recognition of what the project team overlooked, concrete steps to involve workers in the evidence and give them authority, measures that keep the change from being undone by accident, research on quality management and change and replies that ask what a classmate's resisters might be right about. Posts stand out when they turn a resister into an owner of the change. They lose credit for describing resistance as a discipline problem, relying on orders, proposing only training or replies limited to agreement. Clear writing and APA citations also count.
QSO 620 Module 7 help: the mistakes that cost points
Describe what happened in concrete terms: who resisted, how and what they said. Then ask what they know. Experienced workers often sense real problems, even when their explanation or their fix is wrong. Ask what the project team did not do: did the workers see the evidence on their own equipment, help run the tests or have a say in the new method? Propose steps that answer those gaps, such as walking through results at the machine, involving workers in the control plan and giving them clear authority to act on signals. Add safeguards that make accidental reversal hard, such as locked settings that need a sign-off to change. Close with how you will know the change has taken hold. Posts often prescribe more training, when what was missing was involvement.
Get QSO 620 Module 7 written to your instructions
Paste the QSO 620 Module 7 prompt and describe the resistance you face. A writer reads it as information, separates what the workers know from what they misjudge, proposes ways to involve them in the evidence and give them authority, adds safeguards against accidental reversal and cites quality research, then asks classmates a question. Your first QSO 620 post is free, written in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 620 papers and related MS Operations Management samples
- QSO 620 Module 1 Discussion: What Six Sigma Adds
- QSO 620 Module 2 Define Phase Assignment: The Charter and the Torque Window
- QSO 620 Module 3 Measure Phase Assignment: A Tester That Could Not Be Trusted
- QSO 620 Module 4 Discussion: Why Adjusting After Every Reading Backfires
- QSO 620 Module 5 Analyze Phase Assignment: The Cavities and Settings Behind the Spread
- QSO 620 Module 6 Improve Phase Assignment: A Designed Experiment on the Molding Press
- QSO 620 Module 8 Control Phase Assignment: Control Charts and a Reaction Plan
- QSO 620 Module 9 Final Project: The DMAIC Project Report
- QSO 620 Module 10 Discussion: Keeping the Program Alive After the First Win
- MKT 625 Module 6 Milestone Two: Digital Channel Strategy
- MKT 610 Module 8 Sales Promotion, Publicity and Trade Selling Assignment: Sales Promotion, Public Relations and Personal Selling
- MKT 675 Module 2 Claims Substantiation Assignment: Auditing Health and Quality Claims
- BMB 515 Module 5 Publishing and Licensing Assignment: One Song, One Television Placement, Every Fee
QSO 620 Module 7 questions, answered
Where can I find a free QSO 620 Module 7 Discussion sample?
This page holds the full QSO 620 Module 7 post: operators resisting new molding settings at an invented bottle cap maker.
Why do workers resist process improvements?
Often because they were not involved, did not see the evidence on their own work, fear losing skill or status or know something the project team missed.
What is a Six Sigma champion?
A senior manager who sponsors projects, removes obstacles, secures resources and supports the changes the project produces.
How can Six Sigma changes be made to stick?
By involving workers in the evidence and the new method, building settings into standard procedures, giving workers authority to act and assigning ownership of the control plan.
Should resistance be treated as a problem to overcome?
It is better treated as information, since it can reveal gaps in the evidence, the method or the way the change was introduced.