QSO 355 is SNHU’s Resource Estimating and Scheduling course. It centers on resource estimating and scheduling: analogous, parametric and bottom-up estimating, three-point and PERT estimates, the critical path method, resource loading and histograms, resource leveling and smoothing, overtime, added crews and crashing, schedule risk analysis and Monte Carlo simulation, critical chain buffers and honest reporting of estimates. Every module below opens a full sample paper or takes a free request for one; searches like "qso 355 module 3", "QSO355 sample paper" and "QSO 355 milestone example" land on this page.
What QSO 355 is really about
Within SNHU's project management sequence, QSO 355 teaches the quantitative side of planning: how much work, how many people and how long. Credit goes to work that states the basis of every estimate, shows ranges where the work is uncertain, loads the schedule with real resource limits rather than assuming people are unlimited, levels conflicts before they appear on the shop floor and treats a fixed deadline as a constraint to plan against rather than a hope.
Every sample studies Cedar Row Repertory Theater, a made-up nonprofit company in Milwaukee whose 15-person production shop builds scenery for six mainstage shows a season, from Twelfth Night and a refurbished A Christmas Carol to The Pirates of Penzance with a turntable ship. The theater, its staff, its productions' designs and every figure in these QSO 355 papers are fictional.
What QSO 355’s modules ask for
QSO 355 commonly asks for discussions on estimating bias, three-point estimates, overtime and honest reporting, an estimating assignment comparing methods, Project One building a resource-loaded schedule, a resource leveling assignment and Project Two, a schedule risk analysis with a plan to compress the schedule and protect the deadline.
Where students lose points in QSO 355
QSO 355 papers lose points when estimates have no stated basis, single numbers hide real uncertainty, schedules assume unlimited people, resource conflicts are found only by reading the histogram afterward, crashing adds cost to activities off the critical path and risk analysis stops at listing what might go wrong.
The QSO 355 drawers
QSO 355 Module 1 Discussion example
The opening QSO 355 post introduces the scenic shop of Cedar Row Repertory Theater, an invented Milwaukee company whose nine carpenters, two welders and three painters build six sets a season, and asks why four of last season's six builds ran 12 to 31 percent over their estimated hours; it separates the inside view the technical director used, a careful list of tasks for each show, from the outside view of how long similar builds actually took, drawing on Kahneman and Lovallo's account of bold forecasts and Flyvbjerg's reference class forecasting, and proposes keeping a record of hours by type of scenery. Full sample paper, read it free.
QSO 355 Module 2 Estimating Assignment example
The Module 2 assignment estimates the carpentry, welding and painting hours for the Pirates of Penzance set at Cedar Row Repertory Theater, the invented Milwaukee company, a two-deck ship on a 28-foot turntable with masts, rigging and a rock unit: an analogous estimate from the shop's last musical gives 3,300 carpenter hours, a parametric estimate from hours per square foot of platform and wall 3,165, and a bottom-up estimate from a work breakdown structure 3,380; reconciling them, adding a range for the turntable the shop has never built and applying the shop's record of overruns on new mechanisms gives a planning figure of 3,700 hours with welding and paint estimated alongside, drawing on Jørgensen's review of expert estimation and Flyvbjerg on reference class forecasting. Full sample paper, read it free.
QSO 355 Module 3 Project One example
Project One loads the fall builds at Cedar Row Repertory Theater, the invented Milwaukee company, Twelfth Night, The Importance of Being Earnest and a refurbished A Christmas Carol, onto a 21-week schedule from July 5 against the shop's capacity of 360 carpenter, 120 painter and 80 welder hours a week; scheduling every build as early as possible overloads the carpenters in weeks 6, 7, 9 and 15, at up to 514 hours, so the plan uses float to stretch Twelfth Night, delay and compress Earnest and delay A Christmas Carol, bringing the peak to 300 hours with no overtime, and shows the spare capacity left for an early start on the spring turntable; it uses Kelley and Walker on the critical path method and Hegazy on resource leveling. Full sample paper, read it free.
QSO 355 Module 4 Discussion example
The Module 4 post asks the charge scenic artist at Cedar Row Repertory Theater, the invented Milwaukee company, for three numbers instead of one for painting the 30-by-50-foot Pirates of Penzance backdrop on the shop's single paint deck: 200 hours optimistic, 260 most likely and 420 pessimistic, a PERT mean of about 277 hours and a standard deviation of about 37; it shows that the 300 hours the shop had booked gives roughly a three-in-four chance, explains why the long right tail matters on a shared deck, draws on Malcolm, Roseboom, Clark and Fazar's original PERT method and on Herroelen and Leus on the merits and pitfalls of critical chain buffers, and suggests pooling the painters' padding into one buffer. Full sample paper, read it free.
QSO 355 Module 5 Resource Leveling Assignment example
The Module 5 assignment levels nine carpenters across two overlapping winter builds at Cedar Row Repertory Theater, the invented Milwaukee company: Uncle Vanya, 1,100 shop hours due for load-in in week 6, and the rest of The Pirates of Penzance, 2,280 shop hours plus a 420-hour load-in in week 12, over 12 weeks from December 6 with the shop closed for New Year's week; building both at their natural pace overloads the crew in six weeks while leaving 132 hours idle in five others, so the assignment applies a minimum slack rule, gives Vanya its carpenters first and lets Pirates absorb the rest, leaving a shortfall of 80 hours that no leveling can remove; it uses Davis and Patterson's comparison of priority rules and Kolisch on serial and parallel scheduling schemes. Full sample paper, read it free.
QSO 355 Module 6 Discussion example
The Module 6 post decides how Cedar Row Repertory Theater, the invented Milwaukee company, should find the 80 carpenter hours its winter schedule lacks: overtime for the regular crew looks cheaper at about $3,200 for two Saturdays, but research on scheduled overtime shows productivity falls as long weeks continue, while two over-hire carpenters for the load-in week cost about $2,900, add hands where the 60-hour peak actually sits and need only a short orientation; it uses Thomas on scheduled overtime and Hanna, Taylor and Sullivan on extended overtime, chooses over-hire for load-in and a single Saturday only if the shop work slips, and notes what fatigue means for safety on a stage full of rigging. Full sample paper, read it free.
QSO 355 Module 7 Project Two example
Project Two analyzes the last 22 working days of The Pirates of Penzance build at Cedar Row Repertory Theater, the invented Milwaukee company: the most likely durations put the set ready with two days to spare, but a 20,000-run Monte Carlo simulation with three-point estimates on the ship, the rock unit, the masts, painting and load-in gives only a 41 percent chance of being ready for first technical rehearsal, because two parallel paths merge before load-in; the ship path is critical in 63 percent of runs and the rock path in 31; testing three crashing options alone and in combination shows a second painting shift and two over-hire carpenters on the hull, together $12,600, raise the probability to about 97 percent; it uses Malcolm, Roseboom, Clark and Fazar on PERT and its limits, Williams on simulation in project management and Herroelen and Leus on buffers. Full sample paper, read it free.
QSO 355 Module 8 Discussion example
The closing QSO 355 post describes the assistant technical director at Cedar Row Repertory Theater, the invented Milwaukee company, deciding how to tell the artistic director that next season's planned musical, with a flying ship and two revolves, is estimated at 5,900 carpenter hours rather than the 4,000 in the draft budget; it draws on Snow, Keil and Wallace's experiments showing that people bias status reports toward optimism and on Smith and Keil's model of why staff stay quiet about bad news, and sets out how to report the estimate as a range with its basis and three options rather than as a single unwelcome number. Full sample paper, read it free.
Your classroom shows something else?
Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.
Using a QSO 355 sample the right way
Cedar Row's QSO 355 projects take one season from estimate to opening: Project One loads the fall builds with carpenters, welders and painters and finds where the shop runs out of people, and Project Two simulates the Pirates of Penzance build, measures the chance of being ready for first technical rehearsal and chooses the cheapest way to raise it. Send your QSO 355 instructions and project; your first custom sample is free and usually ready in two days.
QSO 355 questions, answered
What does QSO 355 cover?
Resource estimating and scheduling: estimating methods, three-point and PERT estimates, the critical path, resource loading and leveling, overtime and crashing, schedule risk analysis and reporting.
What are the QSO 355 projects?
Project One builds a resource-loaded schedule for a project and resolves resource conflicts; Project Two analyzes schedule risk and plans how to compress the schedule to meet a deadline.
Is Cedar Row Repertory Theater real?
No. Cedar Row Repertory Theater, its shop and its season were invented for these QSO 355 samples.