Module Six Discussion
Frozen Walls, Moving Desks
The Harrow Mutual move contains two very different kinds of work. The renovation of the old printing plant needs a building permit, inspections, a fixed-price contract and a design the city has approved. Moving a wall after framing costs thousands of dollars and can trigger another review. The workplace inside the walls is different: where each team sits, how many quiet rooms we need, how meeting room screens work and how the move weekend runs. Nobody at the agency has worked in an open office, so our requirements are guesses, and they can be tested cheaply before anything is built.
Boehm (2002) describes the home grounds of plan-driven and agile methods: plan-driven methods suit stable requirements, large or regulated work and situations where change is costly, while agile suits uncertain requirements, small teams and quick feedback. Construction is clearly plan-driven ground. The design will be frozen when the permit is issued in December, and changes after that go through change control with the sponsor.
For the interior, we will use two-week iterations. In January, facilities will set up a pilot bay of eight desks in the old office with the furniture and phone headsets we are considering, and the client service team will work there for two weeks and tell us what fails. Each iteration will change one thing, such as panel height or headset model, and the furniture order is placed after the third, still inside the five weeks of float the schedule gives furniture. Serrador and Pinto (2015) found that the degree of agile use was associated with higher perceived project success, particularly stakeholder satisfaction, which is what our 75 percent satisfaction target needs.
A hybrid asks the project manager to switch styles: firm control with the contractor, more facilitation with staff. Matching leadership style to project type affects success (Müller & Turner, 2007), and here the type changes within one project.
Which part of your project could be tested with a small pilot before the real thing is built?
References
Boehm, B. (2002). Get ready for agile methods, with care. Computer, 35(1), 64-69. https://doi.org/10.1109/2.976920
Müller, R., & Turner, J. R. (2007). Matching the project manager's leadership style to project type. International Journal of Project Management, 25(1), 21-32. https://doi.org/10.1016/j.ijproman.2006.04.003
Serrador, P., & Pinto, J. K. (2015). Does Agile work? A quantitative analysis of agile project success. International Journal of Project Management, 33(5), 1040-1051. https://doi.org/10.1016/j.ijproman.2015.01.006
What the QSO 345 Module 6 instructions ask for
The QSO 345 Module 6 discussion typically compares development approaches: predictive or waterfall life cycles, in which scope is fixed early and the work follows a plan, and adaptive or agile approaches, in which the product is built in short iterations with frequent feedback. Students usually explain which approach suits a project and why. Strong posts identify the characteristics that favor each approach, such as how stable requirements are, how costly changes are and how quickly feedback is available, consider a hybrid where parts of the project differ, describe how the chosen approach would actually run and cite research. Replies should ask a classmate which part of their project could be iterated or what a fixed plan would protect.
How this QSO 345 Module 6 discussion example is built
The post considers how to run the Harrow Mutual Insurance Agency move, a fictional relocation of 140 staff in Omaha. Construction stays predictive: permits, inspections, a fixed-price contract and a 12-week build need a frozen design, and late changes to walls are costly. The workplace inside, seating, meeting room technology and the move plan, is run in two-week iterations, starting with a pilot bay of eight desks set up in the old office for the client service team to test. Boehm on the home grounds of agile and plan-driven methods, Serrador and Pinto on agile and project success and Müller and Turner on leadership and project type support the hybrid.
Where the QSO 345 Module 6 rubric puts the points
Instructors grading the QSO 345 Module 6 thread look for an accurate description of predictive and agile approaches, a reasoned choice based on the project's characteristics, consideration of a hybrid where appropriate, a realistic account of how the approach would work, correct use of research and replies that help peers test their choices. Posts that score highest tie each part of the project to the reason it suits one approach and say what the project manager must do differently. Points drop when posts treat agile as always better, apply it to work that cannot change cheaply, describe the approaches only in general terms or reply to classmates with agreement alone. Clear writing and correct citations count too.
QSO 345 Module 6 help: the mistakes that cost points
Start with your project's parts and ask, for each, how stable its requirements are, how costly it is to change once built and how quickly users can give feedback. Work that is expensive to change and governed by contracts, permits or regulation usually suits a predictive plan; work whose requirements are uncertain and that can be tested in small pieces suits iterations. Many real projects are hybrids. Then describe how the chosen approach would run: what is fixed, what is iterated, how often feedback is gathered and who decides on changes. A common mistake is choosing agile because it sounds modern; another is describing waterfall as if it allowed no change at all. Close by asking classmates which part of their project would benefit from a pilot.
Get QSO 345 Module 6 written to your instructions
Paste the QSO 345 Module 6 prompt and describe your project. A writer compares predictive, iterative, agile and hybrid approaches for it, explains which parts need a fixed plan and which benefit from feedback, describes how a hybrid would run and what it asks of the project manager, using research, and asks QSO 345 classmates a question. The first QSO 345 post is free and should reach you in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 345 papers and related BS Operations Management samples
- QSO 345 Module 1 Discussion: Why Moving an Office Is a Project
- QSO 345 Module 2 Project Charter Assignment: Authorizing the Harrow Mutual Move
- QSO 345 Module 3 Project One: Scope, Work Breakdown and Schedule
- QSO 345 Module 4 Discussion: Mapping Who Can Stop the Move
- QSO 345 Module 5 Risk Register Assignment: What Could Keep 140 People From Moving
- QSO 345 Module 7 Project Two: Earned Value at Week 18
- QSO 345 Module 8 Discussion: A Furniture Vendor's Hockey Tickets
- MKT 265 Module 8 Discussion: A Season of Posts and Cars
- ACC 330 Module 6 Discussion: Why This Family No Longer Itemizes
- MKT 335 Module 3 Milestone One: Objectives, Audiences and the Funnel Budget
- OL 324 Module 3 Milestone One: Quality Problem Analysis
QSO 345 Module 6 questions, answered
Where can I find a free QSO 345 Module 6 Discussion sample?
This page holds the full QSO 345 Module 6 post: predictive, agile and hybrid approaches compared for an invented insurance agency's office move.
What is a predictive life cycle?
An approach in which scope, schedule and cost are determined early and the work follows the plan through phases, with changes controlled; often called waterfall.
What is an agile approach?
An adaptive approach in which the product is developed in short iterations, with frequent delivery, customer feedback and changing priorities managed through a backlog.
What is a hybrid approach?
A combination of predictive and adaptive methods, such as a fixed plan for some deliverables and iterations for others, chosen to fit different parts of a project.
When does agile work best?
When requirements are uncertain or likely to change, the work can be delivered and tested in small pieces, users can give quick feedback and changes are cheap.